| description | Run the binding 6-gate feature workflow end-to-end per rule 47 (Plan → Independent Plan Audit → TDD Implementation → Implementation Audit Loop → Device/Integration Verification → Merge). Use this skill whenever the user wants to implement a new feature in vreader, asks 'implement feature #N', 'work on feature 47', 'start the feature workflow', 'plan + build feature X', or describes building a new capability that doesn't yet exist. NOT for fixing broken implementations (that's fix-issue). The skill drives the row from `TODO` → `VERIFIED` through six gates that must never be skipped — author/auditor separation, evidence files, hook compliance are all binding. |
Feature Workflow (rule 47, six gates, never skip one)
Drives a feature from TODO → VERIFIED through the binding 6-gate
sequence in .claude/rules/47-feature-workflow.md:
Plan → Independent Plan Audit → TDD Implementation → Implementation
Audit Loop → Device/Integration Verification → Merge → (close gate)
Each gate has an explicit required artifact, author/auditor
separation rule, tracker status transition, blocking hook,
and exit criteria. You don't enter the next gate until the current
gate's exit criteria are met. Multiple iterations within a gate are
normal.
Input
$ARGUMENTS
$ARGUMENTS is the feature identifier — either a numeric id from
docs/features.md (e.g. 48) or a short slug (e.g.
materializing-restore). If empty, list TODO/PLANNED candidates
from docs/features.md and ask the user to pick.
Scope guard — read this first
This skill is for features only (capabilities never implemented).
If the work is fixing a broken implementation, stop here and use
/fix-issue. The bug-vs-feature distinction is binding per AGENTS.md;
running a fix through this skill skips the bug-tracker workflow.
Hooks you'll trip
| Hook | Triggers when | What it requires |
|---|
check_gh_issue_mirror.sh | Edit/Write/MultiEdit on docs/features.md | mirror-required rows (PLANNED/IN PROGRESS/DONE/VERIFIED) must have GH: #N in Notes column |
check_terminal_status_evidence.sh | tracker flip to VERIFIED on docs/features.md | matching dev-docs/verification/feature-<id>-<YYYYMMDD>.md evidence file with valid frontmatter |
check_codex_audit_artifact.sh | gh pr merge on a Swift-touching PR | .claude/codex-audits/<branch>-audit.md with final_verdict ∈ {ship-as-is, follow-up-recommended} |
Plan around them; do not bypass.
Platform routing (feature #107 — binding for every gate below)
vreader is two native apps (iOS at root, Android under android/). Classify the
feature's changed files with code_paths_platform
(.claude/hooks/lib/code-paths.sh) → ios/android-app/android-spike/shared,
and substitute the lane in every gate (the gates are written iOS-first):
- Gate 3 test gate: iOS →
scripts/run-tests.sh; Android →
scripts/run-android-tests.sh (never bare ./gradlew — rule 52 Cause D).
- Gate 5 verify: iOS → iPhone 17 Pro Sim +
vreader-debug://; Android →
scripts/run-android-verify.sh (emulator; rule 47 Android tier). Evidence
device_or_simulator = the AVD.
- Version bump: stays iOS (
project.yml) for shared/spike PRs until #106;
Android android/version.properties + android/vX.Y.Z tags begin with #106
(rule 40).
shared-only and pre-#106 spike work → iOS lane. An android-app feature
whose Gate-5 needs the app shell is blocked on #106.
Pre-flight Checks
-
Resolve target: parse $ARGUMENTS to a feature row in
docs/features.md. Read the row + any sub-section plan.
-
Working tree: git status --porcelain. If dirty, isolate work
on a branch; do not revert unrelated changes.
-
Branch / sync: git fetch origin. Confirm main is current.
-
Tracker baseline + entry-gate selection: note the current row
status, then check whether dev-docs/plans/*-feature-<id>-*.md
exists. The two artifacts can disagree (the row's PLANNED may
have been set on the lighter row-template definition: Problem/
Scope/Edge Cases filled in). The combination decides where to
enter:
| Row status | dev-docs/plans/*-feature-<id>-*.md present? | Enter at |
|---|
TODO | no | Gate 1 (write the plan) |
TODO | yes (drafted ahead, not yet audited) | Gate 2 |
PLANNED | no | Gate 1 (drawing up the plan IS the work — do not bail out) |
PLANNED | yes, no audit revision history | Gate 2 |
PLANNED | yes, audited (revision history shows clean Gate 2) | Gate 3 |
IN PROGRESS | yes (assumed) | resume next pending WI / re-enter Gate 4 if a WI is mid-audit |
DONE | yes | Gate 5b (post-merge final acceptance) |
VERIFIED | yes | already complete; nothing to do |
Do not stop because the plan doc is missing. Drawing up the
dev-docs/plans/ doc is Gate 1's deliverable, not a precondition.
A row already at PLANNED whose dev-docs plan doesn't exist
means: row-level template was filled, full implementation plan
wasn't lifted yet — lift it now (Gate 1), audit it (Gate 2),
then proceed. Only TODO/IDEA-level rows whose row-template
itself is empty (no Problem/Scope/Edge Cases at all) need
triage before Gate 1 is meaningful — those redirect to /triage.
-
Bug-vs-feature sanity check: re-confirm this is a feature
(capability never implemented), not a bug (broken implementation).
If it's a bug → STOP, redirect to /fix-issue.
Gate 1 — Plan
| Field | Value |
|---|
| Required artifact | dev-docs/plans/YYYYMMDD-feature-<id>-<slug>.md with all required sections (see below) |
| Owner / auditor | Author = orchestrator (or Planner subagent). No auditor — that's Gate 2. |
| Status transition | If row was TODO: stays TODO through Gate 1; flips to PLANNED only after Gate 2 passes. If row was already PLANNED (row-template definition filled but no plan doc): stays PLANNED — do NOT regress to TODO. The plan doc fills in what was missing |
| Blocking hook | check_gh_issue_mirror.sh fires on the PLANNED flip (must have GH: #N in row Notes; create the issue here) |
| Exit criteria | Plan file exists at the documented path with all required sections filled in |
Required artifact: dev-docs/plans/YYYYMMDD-feature-<id>-<slug>.md.
Required content (rule 47 + features.md plan template):
- Problem — user need this addresses (mirror or refine row's
Problem).
- Surface area — file-by-file with concrete signatures: which
protocols, types, methods get added or modified. Include a "files
OUT of scope" subsection.
- Prior art / project precedent / rejected alternatives — what
existing patterns we're building on, what was considered and
rejected, and why. Research is part of the plan, not a separate
step.
- Work-item sequencing — small, testable units (typically 1–15
WIs). Each WI is one PR's worth of work. Estimate PR size per WI.
Mark each WI as foundational or behavioral (see Gate 5).
- Spec block per WI (machine-readable, MANDATORY — feature #130 /
rule 55) — a fenced ```yaml block with
id, tier, depends
(WI ids + M-* milestones), writes (path prefixes — the lane's
allowed-writes contract), tests (the named targeted suites),
acceptance. The Spec block is the dispatch unit: lane briefs carry
only their WI's block, so it must stand alone.
- Test catalogue — concrete test files, what each covers,
including audit-driven additions (corruption, partial failure,
idempotency edge cases).
- Risks + mitigations — known unknowns and how we'll handle them.
- Backward compat — what happens to existing data / older clients
/ older backups when this ships.
Author: this skill's orchestrator (or a Planner subagent).
Status transition: row stays at TODO until Gate 2 passes; only
then move to PLANNED. Per the mirror rule, PLANNED triggers GH
issue creation if not already mirrored — gh issue create for
Feature #N: <summary> with the enhancement label, then stamp
GH: #M into the row's Notes column.
Exit criteria: plan file exists at the documented path with all
required sections filled in. Ready for independent audit.
Gate 2 — Independent Plan Audit
| Field | Value |
|---|
| Required artifact | Audit verdict captured inline in the plan file's revision history (Codex thread + rounds + verdict), OR a Manual Audit Evidence section when AI auditor unavailable |
| Owner / auditor | Author = Gate 1 author. Auditor = DIFFERENT agent context (the configured Codex runner — cc-suite — by default, or a fresh subagent with read-only sandbox + "audit, don't implement" framing). Author/auditor separation is mandatory per rule 48 |
| Status transition | row → PLANNED only after this gate passes; that flip triggers GH issue creation if not already mirrored |
| Blocking hook | check_gh_issue_mirror.sh on the PLANNED flip |
| Exit criteria | Zero open Critical/High/Medium findings; Low findings fixed or accepted with rationale; max 3 audit rounds (escalate to user if not clean by round 3) |
Required artifact: Codex (or equivalent independent agent) audit
verdict captured inline in the plan file's revision history, OR a
Manual Audit Evidence section if the AI auditor is unavailable.
Author/auditor separation: the agent that wrote the plan must
not audit it. cc-suite running Codex as a separate codex exec process satisfies this
by default. If a future setup runs everything through one agent, this
gate requires invoking a different model/context boundary explicitly
(e.g., a fresh subagent with read-only sandbox + explicit
"audit, don't implement" framing). See .claude/rules/48-parallel-execution.md.
2a. Plan audit via the configured Codex runner
Run the project's configured independent Codex audit runner — current
runner cc-suite, via /cc-suite:review-plan (architectural plan
review: consistency, completeness, feasibility, ambiguity, risk; it drives
Codex through codex exec). Do NOT use ToolSearch +codex or
mcp__plugin_codex-toolkit_codex__codex — cc-suite intentionally avoids the
MCP bridge (it hangs on long responses) and the old codex-toolkit MCP
server is no longer loaded. If the codex CLI is missing/unauthenticated or
cc-suite errors, skip to 2c. Manual fallback.
2b. Audit focus
Point /cc-suite:review-plan at dev-docs/plans/<plan-file>.md for feature
#: (read-only sandbox) and have it be direct — contradict the
plan where it's wrong — focusing on:
- Model assumption verification — do the SwiftData fields, enum
cases, function signatures, file paths the plan names actually
exist in the current codebase? (This catches the largest class
of pre-implementation bugs.)
- Risks + missing edge cases — what failure modes the plan misses.
- Protocol signature critique — are new interfaces well-shaped,
or do they leak implementation concerns?
- Concurrency hazards — actor isolation, Sendable, race conditions
in mutable state, @MainActor correctness.
- Cohesion check — is the WI split right, or are some WIs too big
or too small?
- Foundational-vs-behavioral classification — is each WI's tier
correct? (Foundational = DTOs/protocols/utilities, no user-observable
behavior. Behavioral = anything that changes app behavior, persistence,
networking, backup format, reader rendering, or UI flow.)
- Spec-block ↔ test-catalogue alignment (feature #130 / rule 55) — does
every WI carry a machine-readable Spec block; does every acceptance
criterion map to a NAMED test in
tests:; are the writes: prefixes
consistent with the surface-area section and disjoint where the plan
claims WI independence; are depends: edges consistent with the
sequencing prose?
Have it report findings as: file:line | severity (Critical/High/Medium/Low) | issue | fix
2c. Manual fallback (Codex unavailable)
Add a Manual Audit Evidence section to the plan with:
- Files read (paths)
- Symbols / signatures verified (which fields/types/enums you confirmed exist)
- Edge cases checked (the list)
- Risks accepted (with rationale)
- Tests added or intentionally deferred
Manual fallback is allowed only when the independent audit tool is
genuinely unavailable, not just inconvenient. The audit step is
non-negotiable; manual fallback is an evidence-bearing alternative.
2d. Loop or exit
Author rewrites the plan to address findings; auditor re-reviews.
Track audit rounds in the plan's revision history.
Exit criteria:
- Zero open Critical/High/Medium findings.
- Low findings either fixed or explicitly accepted with rationale in
the plan's "Known limitations" or "Audit fixes applied" section.
- Maximum 3 audit rounds. If unresolved findings remain after
round 3, STOP and escalate to the user — accept, defer, or redesign.
Status transition: row → PLANNED (mirror rule fires; create GH
issue if not present, stamp GH: #N in Notes).
2e. Open the gate-progress timeline on the GH issue
Per rule 47's "Gate progress is recorded in the GH issue", the issue is
the running record of the feature's path through the six gates. Right
after the issue exists, post the first timeline comment recording
that Gate 2 passed:
gh issue comment <feature-gh-issue> --body "$(cat <<'EOF'
**Gate 2 — plan audited.**
- Plan: `dev-docs/plans/<plan-file>.md`
- Audit: Codex threadId `<id>`, <N> round(s), verdict clean (or `manual-fallback`)
- Work items (tier):
- WI-1 <slug> — foundational
- WI-2 <slug> — behavioral
- …
EOF
)"
Keep it short and factual — the plan file stays the source of truth;
this comment points at it. Do not paste the plan's contents into the
issue.
Hard dependency: Gate 3 cannot start on an unaudited plan.
Skipping Gate 2 and starting TDD anyway is the most likely failure
mode here. Don't.
Gate 3 — TDD Implementation (per Work Item)
| Field | Value |
|---|
| Required artifact | Per WI: failing test (RED), minimal impl (GREEN), refactored code (REFACTOR), per-WI PR with audit log + version bump |
| Owner / auditor | Author = implementer (the agent driving this skill or a TDD-implementer subagent). The Codex audit of this WI's PR is Gate 4, with auditor != implementer. |
| Status transition | When WI-1's PR opens, row → IN PROGRESS |
| Blocking hook | check_codex_audit_artifact.sh blocks gh pr merge without audit log; check_gh_issue_mirror.sh blocks tracker edits without GH: #N |
| Exit criteria | Per WI: tests green, Gate 4 audit clean, docs sync committed if triggered, version bump committed, PR opened with the right reference convention. Gate 3 cannot start on an unaudited plan — Gate 2 must have passed first |
Status transition: when WI-1's PR opens, row → IN PROGRESS.
For each Work Item, run the per-WI inner loop:
3a. Branch + WI scaffold
- Branch:
feat/feature-<id>-wi-<n>-<slug> off main.
- (No tracker move yet — already at
IN PROGRESS from WI-1's PR.)
3b. RED → GREEN → REFACTOR
Per .claude/rules/10-tdd.md:
- RED — write a failing test that captures the WI's behavior.
- SwiftData boundary → persistence test with in-memory container
- WKWebView bridge → parser/coordinator unit test
- ViewModel → Swift Testing async test with
@MainActor
- Pure utility → parameterized
@Test(arguments:)
- GREEN — minimal implementation to make the test pass.
- REFACTOR — clean up without changing behavior. Tests stay green.
Codebase conventions: see .claude/rules/50-codebase-conventions.md.
File-size guideline: ~300 lines max.
Lane mode (feature #130 / rule 55 — Gate-3 WIs inside dispatch lanes)
Independent WIs (disjoint writes:, satisfied depends: — an intra-batch
dependency counts only when the dependency WI's branch has MERGED) may run
as dispatch lanes via the dispatch skill. Inside a lane, this skill's
standing steps are OVERRIDDEN: the lane runs ONE WI's 3a–3d (RED → GREEN →
REFACTOR → in-lane Gate-4 via scripts/run-codex.sh) in its worktree on its
leased TEST_UDID, then STOPS with the rule-55 HANDOFF. No PR, no merge, no
tracker edits, no docs sync, no version bump, no tags — the orchestrator
owns the integration tail and Gate 5 (verify-sim lease).
3c. Test gate
ALWAYS through the watchdog wrapper — never a raw Xcode test invocation
(rule 52):
scripts/run-tests.sh vreaderTests/<SuiteFromTheWIPlan>
Pass → continue. Fail → fix and retry. 3 failures → stop, report. A
RUN-TESTS RESULT: TIMEOUT is sim contention, not flakiness (rule 52 hard
rule 3). Full-suite sweeps (TIMEOUT_SECS=2400 scripts/run-tests.sh vreaderTests) are periodic/CI, never a per-WI gate. In a parallel lane, pass
the leased sim via TEST_UDID=<udid>.
Note: xcodebuild CLI builds to a different DerivedData than
Xcode's Run button. Never use simctl uninstall — wipes user
data. Use simctl install to replace the binary.
3d. Gate 4 — Implementation Audit (per-WI, inline)
| Field | Value |
|---|
| Required artifact | .claude/codex-audits/<branch>-audit.md with valid frontmatter (branch, threadId, rounds, final_verdict, date) |
| Owner / auditor | Author = WI implementer. Auditor = the configured Codex runner (cc-suite) or a fresh subagent. Author/auditor separation per rule 48 |
| Status transition | none — row stays IN PROGRESS |
| Blocking hook | check_codex_audit_artifact.sh blocks gh pr merge without this file |
| Exit criteria | Zero open Critical/High/Medium findings; max 3 audit rounds (escalate to user if not clean by round 3) |
This is the same audit shape as /fix-issue Phase 4. Runs against the
WI's PR before merge.
Collect changed files
git diff main --name-only
git diff main
Codex audit
Run the same configured Codex runner as Gate 2a — cc-suite:
/cc-suite:audit for a read-only audit (Codex audits, you fix —
preserves rule-48 author/auditor separation), or /cc-suite:audit-fix
for the audit→fix→verify loop. Do NOT use ToolSearch +codex /
mcp__plugin_codex-toolkit_codex__codex — the codex-toolkit MCP server is
gone. Point it at the changed files (git diff main --name-only) and focus on:
- Correctness vs the plan — does this WI deliver what the plan promised?
- Edge cases — boundary conditions, nil, Unicode/CJK, concurrent access
- Security — JS/CSS injection in evaluateJavaScript() and WKWebView bridges
- Duplicate code — repeated logic that should be unified
- Dead code — unused imports, unreachable branches, orphaned functions
- Shortcuts & patches — workarounds, TODO markers, band-aids
- VReader compliance — Swift 6 concurrency, @MainActor correctness,
SwiftData actor isolation, file size <300 lines
- Bridge safety — FoliateJSEscaper used for all JS interpolation,
message parser handles edge cases
Have it report as: file:line | severity (Critical/High/Medium/Low) | issue | fix
Fix every finding, then re-run /cc-suite:audit on the updated diff to
verify (or let /cc-suite:audit-fix's built-in verify pass cover it).
If the Codex runner is unavailable: manual mini-audit (same dimensions 1–8,
written into the audit log artifact with threadId: manual-fallback).
Audit log artifact (required before merge)
Path: .claude/codex-audits/<branch-with-slashes-replaced-by-hyphens>-audit.md
Frontmatter:
---
branch: <current branch name, exactly as `git branch --show-current` returns>
threadId: <Codex exec session id> # OR `manual-fallback`
rounds: <integer ≥ 1>
final_verdict: ship-as-is | follow-up-recommended | block-recommended
date: YYYY-MM-DD
---
Body:
- Per-round findings (file:line | severity | issue | fix).
- Resolution note for each finding (fixed / accepted / deferred).
- Summary verdict statement.
- Manual fallback section if applicable.
Commit the audit log alongside the WI changes (own commit or folded
into the relevant fix commit).
Exit criteria: zero open Critical/High/Medium findings. Max 3
rounds for this WI's audit; after round 3 escalate.
3e. Docs sync (if triggered, before version bump)
Per .claude/rules/24-doc-sync.md:
| If this WI touched | Update |
|---|
New service / actor / @Model / Notification.Name / cross-feature pattern | docs/architecture.md |
| User-visible behavior, tech stack, requirements, setup, ≥5-row tracker change | README.md |
| Otherwise | nothing |
If updates needed: own commit (docs: update architecture.md for feature #<id> WI-<n>) before the version bump.
3f. Version bump (mandatory)
Per .claude/rules/40-version-bump.md — every WI's PR ends with one.
xcodegen generate
grep -E "MARKETING_VERSION|CURRENT_PROJECT_VERSION" project.yml
grep -E "MARKETING_VERSION =|CURRENT_PROJECT_VERSION =" vreader.xcodeproj/project.pbxproj
DEVELOPER_DIR=/Applications/Xcode.app/Contents/Developer xcodebuild build \
-project vreader.xcodeproj -scheme vreader \
-destination 'platform=iOS Simulator,name=iPhone 17 Pro'
git add project.yml vreader.xcodeproj/project.pbxproj
git commit -m "chore: bump version to X.Y.Z"
Bump tier (deterministic per WI):
| WI tier | Bump |
|---|
| Foundational (no user-observable change) | patch |
| Behavioral but not the final WI | patch |
| Final WI of the feature (completes user-visible behavior) | minor (or major if the feature is a breaking change) |
Every PR merge produces a tag — see Gate 6's tag step. The tag count
across a multi-WI feature ≈ the WI count, because every PR carries a
mandatory version bump per rule 40.
3g. PR
Reference convention (binding, derived from AGENTS.md merge gate):
- Intermediate WI PRs (every WI except the final one): use plain
prose like
Part of feature #<feature-gh-issue> in the body. Do
NOT use Refs #N or Fixes #N magic words. Reason: the merge
gate ("a PR that references an open feature does not merge until
the feature reaches DONE") would otherwise block every
intermediate WI's merge and force one giant PR. Plain prose
cross-links the PR to the feature without tripping the gate.
- Final WI PR (the one whose merge brings the feature to
DONE):
use Refs #<feature-gh-issue>. Never Fixes #N — the GH issue
stays open until Gate 5b post-merge acceptance lands; auto-close
is wrong here.
gh pr create --title "feat(#<feature-id> WI-<n>): <concise description>" --body "$(cat <<'EOF'
## Summary
{1-3 bullets describing what changed and why}
{For intermediate WIs}: Part of feature #<feature-gh-issue>
{For final WI only}: Refs #<feature-gh-issue>
## What Changed
{list of key changes}
## WI Status
- WI-<n>: {tier — foundational | behavioral} — this PR
- Remaining WIs: {summary}
## Codex Audit (Gate 4)
{audit summary — iterations run, findings fixed, verdict}
Audit log: `.claude/codex-audits/{branch-slug}-audit.md`
## Validation
- [x] test gate green: `RUN-TESTS RESULT: SUCCEEDED` from `scripts/run-tests.sh` on the WI's targeted suites (Gate 3 test gate)
- [x] Tests cover changed behavior (TDD: RED → GREEN)
- [x] Codex audit loop completed ({M} iterations, verdict: {verdict})
- [x] Docs sync — {architecture.md updated | README.md updated | n/a}
- [x] Version bumped: {old} → {new}
## Gate 5a Verification (per-PR slice — pre-merge)
- Tier: {foundational — unit + integration sufficient | behavioral — slice verified end-to-end | final WI — pre-merge slice with `5b post-merge evidence file pending`}
- {What was run, what was observed}
## Type of Change
- [x] Feature WI ({Part of feature #<feature-gh-issue> for intermediate WIs | Refs #<feature-gh-issue> for the final WI})
EOF
)"
Gate 5 — Device / Integration Verification
| Field | Value |
|---|
| Required artifact | 5a: PR description "Gate 5a Verification" section per WI. 5b (final-WI only): dev-docs/verification/feature-<id>-<YYYYMMDD>.md per SCHEMA.md |
| Owner / auditor | Author = verifier (orchestrator or designated subagent). 5b is "evidence-bearing"; SCHEMA result-field semantics gate any VERIFIED flip |
| Status transition | 5a alone does NOT change status. After 5b lands with result: pass, row → VERIFIED |
| Blocking hook | check_terminal_status_evidence.sh blocks the VERIFIED flip without 5b file present at the documented path |
| Exit criteria | 5a: PR's slice verification recorded honestly; 5b: every acceptance criterion exercised end-to-end with result: pass (or partial / fail per SCHEMA semantics) |
Gate 5 has two phases — 5a (pre-merge slice) and 5b (post-merge
final acceptance) — because the SCHEMA.md evidence file requires the
merge-commit SHA on main, which doesn't exist before the final
WI's merge.
5a. Pre-merge slice verification (per WI)
| WI tier | Verification depth (pre-merge) | Where recorded |
|---|
| Foundational (DTOs, protocols, utilities, pure types — no user-observable behavior) | Unit + integration tests + Gate 4 audit are sufficient | PR description "Gate 5a Verification" line |
| Behavioral (anything that changes app behavior, persistence, networking, backup format, reader rendering, or UI flow) | Slice verification — exercise the slice end-to-end against the real environment available at this point. iPhone 17 Pro Simulator with vreader-debug:// harness; for backup/network features, against real WebDAV (or local Docker WebDAV); for reader features, with a fixture book. | PR description "Gate 5a Verification" section: what was run, what was observed |
| Final WI (the one that completes the feature) | Pre-merge slice of the final acceptance criteria — exercise what's exercisable on the working-tree binary against the real backend. Defer anything that requires a merged-on-main build. | PR description "Gate 5a Verification" + a note "5b post-merge evidence file pending" |
5a is the pre-merge gate that lets Gate 6 merge land. It is NOT the
final acceptance pass.
5b. Post-merge final acceptance (final WI only)
After the final WI's PR merges, write the structured evidence file
that flips the row to VERIFIED.
Path: dev-docs/verification/feature-<id>-<YYYYMMDD>.md per
dev-docs/verification/SCHEMA.md.
Required frontmatter:
---
kind: feature
id: <N>
status_target: VERIFIED
commit_sha: <40-hex of merge commit on main>
app_version: <MARKETING_VERSION (build CURRENT_PROJECT_VERSION)>
date: YYYY-MM-DD
verifier: <name or "claude">
device_or_simulator: <e.g. "iPhone 17 Pro Simulator">
os_version: <e.g. "iOS 26.4">
build_configuration: Debug | Release
backend: <e.g. "rclone WebDAV ~/vreader-webdav-data" or "n/a">
result: pass | partial | fail
---
Required body sections (rule 47 + SCHEMA):
## Acceptance criteria — table mapping each criterion from the
plan to observed behavior + pass/fail.
## Commands run — fenced code blocks of the actual shell /
simctl / xcrun / curl commands used. Reproducible recipe.
## Observations — what surprised you, what was almost a
regression, what's brittle for next time.
## Artifacts — paths to screenshots, log captures, .xcresult
bundles. Optional but strongly recommended.
Result-field semantics (binding):
pass — every acceptance criterion verified end-to-end. Tracker
may move to VERIFIED; GH issue may be closed.
partial — some criteria deferred. Tracker stays at DONE; a
follow-up evidence file is required.
fail — at least one criterion regressed. Tracker moves back to
IN PROGRESS; do NOT flip to VERIFIED.
"Tooling unavailable" is NOT an acceptable deferral reason unless
a specific tool is named and confirmed missing (e.g. xcrun simctl
returns "command not found", required device unavailable, Docker
WebDAV down). "I'll do it next session" is not a tool-unavailability
claim — it's a discipline lapse.
Gate 6 — Merge
| Field | Value |
|---|
| Required artifact | per WI: green PR ready to merge with audit log + version bump + Gate 5a slice noted in description |
| Owner / auditor | Author = WI implementer. Merge gate enforced by AGENTS.md (fix-or-implement) + active hooks |
| Status transition | per merge: not-final WI → row stays IN PROGRESS; final WI → row → DONE. (VERIFIED is a separate post-merge step, see Gate 5b.) |
| Blocking hook | check_codex_audit_artifact.sh blocks gh pr merge without audit log |
| Exit criteria | Squash merge succeeds; tag v<X.Y.Z> cut from the merge commit on main; status transitioned per the rules above |
A WI's PR may merge when ALL hold:
- Tests pass (Gate 3c).
- Implementation audit loop is clean (Gate 3d / 4).
- Audit log artifact exists at
.claude/codex-audits/<branch>-audit.md
with valid frontmatter (check_codex_audit_artifact.sh will block
gh pr merge otherwise).
- Gate 5a slice verification complete for the WI's tier and recorded
in the PR description. 5b post-merge evidence file is NOT required
pre-merge — it's chicken-and-egg with the merge commit SHA.
- Docs sync committed if triggered (Gate 3e).
- Version bump committed as the last commit before opening the PR
(Gate 3f).
- PR reference convention satisfied (Gate 3g): intermediate WIs use
Part of feature #N prose; only the final WI uses Refs #N.
gh pr merge <PR#> --squash --delete-branch
After EACH WI's merge (every PR carries its own version bump per
rule 40, so every merge gets its own tag):
git checkout main && git pull origin main
git tag v<X.Y.Z>
git push origin v<X.Y.Z>
Then post the per-WI timeline comment on the GH issue (rule 47, "Gate
progress is recorded in the GH issue"):
gh issue comment <feature-gh-issue> --body "$(cat <<'EOF'
**WI-<n> merged** (<foundational | behavioral>).
- PR #<pr>, merged as `<short-sha>`
- Version: v<X.Y.Z>
- Gate 4 audit: <ship-as-is | follow-up-recommended>
- Gate 5a slice: <what was run / observed, or "unit + integration (foundational)">
EOF
)"
This makes the middle of the workflow visible on GitHub. The final
WI's merge instead uses the existing "shipped, awaiting verification"
comment in the Post-Merge Finalizer below — do not double-post.
Status transitions (per merge):
- WI lands but more remain → row stays
IN PROGRESS.
- Final WI lands → row →
DONE (implemented; not yet verified).
This flip is what enables the Gate 5b post-merge evidence file to
reference the merge-commit SHA.
- After Gate 5b evidence file lands with
result: pass → row →
VERIFIED via a tracker edit. check_terminal_status_evidence.sh
blocks this VERIFIED flip if the evidence file isn't at
dev-docs/verification/feature-<id>-<YYYYMMDD>.md.
Post-Merge Finalizer (close gate)
Do NOT auto-gh issue close on the GH issue when the final WI
merges. Per AGENTS.md "Close gate":
The "shipped, awaiting verification" comment (below) and the closure
comment after Gate 5b are the last two rows of the gate-progress
timeline from rule 47. Together with the Gate-2 comment (2e) and the
per-WI-merge comments (Gate 6), they make the issue a complete record
of the feature's path through all six gates.
Right after final WI's gh pr merge
-
Apply label to GH issue (if device-verifiable, default
awaiting-device-verification; otherwise pick from
verification-exception / verification-blocked per AGENTS.md).
-
Post a "shipped, awaiting verification" comment:
gh issue comment <feature-gh-issue> --body "Shipped in v<X.Y.Z> (commit <short-sha>). Awaiting Gate 5 final acceptance pass."
-
Tag is cut from the merge commit (per Gate 6's git tag step).
After Gate 5 final acceptance
-
For device-verification path:
-
Install merged build on iPhone 17 Pro Sim (or device).
-
Run every acceptance criterion from the plan.
-
Record observations in dev-docs/verification/feature-<id>-<YYYYMMDD>.md.
-
Post closure comment citing the evidence file:
gh issue comment <feature-gh-issue> --body "VERIFIED on iPhone 17 Pro Simulator (commit <sha>). All acceptance criteria pass. Evidence: dev-docs/verification/feature-<id>-<YYYYMMDD>.md."
gh issue close <feature-gh-issue>
-
For non-device-reproducible features (race conditions, fault
injection, etc.): close under verification-exception with a
high-fidelity integration test at real subsystem boundaries (not
stubs). Same evidence file, citation comment, then gh issue close.
-
For verification-blocked (no harness exists yet): keep open,
apply the label, file a follow-up to build the harness (potentially
as another feature).
If verification reveals a regression: do NOT close. Move row back to
IN PROGRESS, file a bug, fix, re-verify.
Acceptance Contract
The feature is "done" — i.e. row may flip to VERIFIED and GH issue
may close — only when:
- All Work Items merged via Gate 6.
- Final WI's
dev-docs/verification/feature-<id>-<YYYYMMDD>.md has
result: pass covering every acceptance criterion from the plan.
- Closure comment posted with commit SHA, what was tested, what was
observed.
gh issue close <feature-gh-issue> executed.
If uncertain at any gate: stop and ask. Don't guess your way past a
gate — that's how rule 47 was tightened in the first place.
Error Handling
| Scenario | Action |
|---|
$ARGUMENTS is empty | List TODO/PLANNED candidates; ask user to pick |
| Target is actually a bug | Redirect to /fix-issue; STOP |
Plan exists at dev-docs/plans/... from a prior run | Resume at the correct gate (re-run Gate 2 if plan changed; else continue) |
| Codex runner unavailable | Use manual fallback; mark audit log threadId: manual-fallback |
| 3 audit rounds with findings still open (Gate 2 OR Gate 4) | STOP. Escalate to user — accept, defer, or redesign |
| Test gate fails 3x | Report errors, keep branch, STOP |
check_gh_issue_mirror.sh blocks tracker edit | Add GH: #N to the row's Notes column, retry |
check_codex_audit_artifact.sh blocks gh pr merge | Verify the audit log file exists at the expected path with valid frontmatter |
check_terminal_status_evidence.sh blocks VERIFIED flip | Write the evidence file at dev-docs/verification/feature-<id>-<YYYYMMDD>.md first |
| Gate 5 verification reveals a regression | Move row back to IN PROGRESS, file a bug, fix, re-verify. Do NOT close GH issue |
| Branch already exists | Reuse if WI matches; else rename |