Skip to main content

asd-phase-design

星标10
分支7
更新时间2026年6月4日 14:40

Runs the ASD design phase for the active sprint: dispatches creators sequentially per the precondition chain (asd-ba for prd.html, a design-system gate, asd-ux-designer for ux-spec.html, asd-architect for adr.html and optional c4-full/) to author sprint design drafts. Use when asd-sprint dispatches the design phase, or when the user explicitly asks to run or re-run design for the active sprint.

安装

用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。

SKILL.md
readonly