en50128-lifecycle-phase-checklists
Per-phase gate checklists (Phase 1–9) with SIL-annotated criteria for all COD gate-check operations
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Per-phase gate checklists (Phase 1–9) with SIL-annotated criteria for all COD gate-check operations
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Project management and coordination for EN 50128 railway software development
Project management and coordination for EN 50128 railway software development
Software quality assurance techniques and auditing for EN 50128 railway software
Software testing methodologies with coverage analysis for EN 50128 C programs using Unity test framework
Software verification with static analysis and coverage for EN 50128 railway software per Section 6.2
V&V Manager coordination and independent V&V authority for SIL 3-4 EN 50128 projects
| name | en50128-lifecycle-phase-checklists |
| description | Per-phase gate checklists (Phase 1–9) with SIL-annotated criteria for all COD gate-check operations |
| license | Proprietary |
| compatibility | opencode |
| metadata | {"standard":"EN 50128:2011","domain":"railway-software","role":"lifecycle-coordinator"} |
Load trigger: Load at the start of any @cod gate-check <phase> or @cod start-phase <phase>.
Apply only the section for the target phase; the others are reference.
Deliverables for each phase: see DELIVERABLES.md (Annex C Table C.1) and
activities/phase-N-*.yaml §gate_check §criteria. These checklists cover quality,
technique, and SIL-specific criteria not captured in the deliverables matrix.
Quality criteria:
Team organization:
ORGANIZATION.md for SIL-tiered charts)SIL-specific:
Requirements quality:
Traceability:
Safety:
EN 50128 Table A.2 techniques:
SIL-specific:
Architecture quality:
Design quality (C-specific):
Traceability:
Safety design:
EN 50128 Table A.3 techniques:
SIL-specific:
Design quality:
SIL-specific:
Code quality (C-specific):
Static analysis (MANDATORY SIL 3–4; HR SIL 2):
Unit testing:
Code review (MANDATORY all SIL levels):
Traceability:
EN 50128 Table A.4 techniques:
Integration execution:
Integration testing:
Traceability:
EN 50128 Table A.6 techniques:
SIL-specific:
Validation testing:
Requirements validation:
Independence (SIL 3–4):
Customer acceptance:
EN 50128 Table A.7 techniques:
SIL-specific:
Independence (MANDATORY SIL 1–4 per §6.4.1.1; exempt SIL 0 per §6.4.1.2):
Assessment activities:
Findings:
Safety Authority:
Release package:
Deployment:
Maintenance:
Configuration management: