一键导入
speckit-scope-creep
Detect scope creep by comparing current spec against its original version in git history
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Detect scope creep by comparing current spec against its original version in git history
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Wrap core analysis with behavior-first vertical consistency checks.
Apply approved architecture refactors by updating plan and task artifacts directly.
Perform a framework-agnostic architecture review validating implementation against spec.md, plan.md, tasks.md, and the governance and architecture constitutions.
Perform an architecture-aware verification gate validating implementation against spec.md, plan.md, tasks.md, and the Architecture Constitution.
Run a single architecture workflow that prefers memory-first context and can incorporate security review when available.
Run implementation with memory context, then review the produced implementation against security and architecture constraints.
| name | speckit-scope-creep |
| description | Detect scope creep by comparing current spec against its original version in git history |
| compatibility | Requires spec-kit project structure with .specify/ directory |
| metadata | {"author":"github-spec-kit","source":"scope:commands/speckit.scope.creep.md"} |
Compare the current spec against its earliest committed version to detect scope creep — requirements that grew, acceptance criteria that expanded, and phases that multiplied since the original spec was written. Quantifies how much the spec has grown and flags the biggest scope increases.
$ARGUMENTS
You MUST consider the user input before proceeding (if not empty). The user may specify:
.specify/ directory exists with at least spec.md.git log --follow --diff-filter=A -- .specify/spec.md to get the first commit.git show <first-commit>:.specify/spec.md.Identify Baseline: Find the original spec version.
## Baseline
| Field | Value |
|-------|-------|
| Original commit | `a1b2c3d` |
| Original date | 2026-03-15 |
| Original author | @developer |
| Current date | 2026-04-11 |
| Days elapsed | 27 days |
| Spec revisions | 8 commits |
Measure Growth: Compare original vs current across all dimensions.
## Scope Growth
| Metric | Original | Current | Growth |
|--------|----------|---------|--------|
| Requirements | 5 | 9 | +4 (+80%) 🔴 |
| User Scenarios | 2 | 4 | +2 (+100%) 🔴 |
| Success Criteria | 3 | 7 | +4 (+133%) 🔴 |
| Task Items | 8 | 18 | +10 (+125%) 🔴 |
| Phases | 2 | 4 | +2 (+100%) 🔴 |
| External Integrations | 1 | 3 | +2 (+200%) 🔴 |
| **Complexity Score** | **28** | **71** | **+43 (+154%)** 🔴 |
Identify Creep Sources: Pinpoint exactly what was added.
## What Crept In
| # | Addition | When Added | Impact |
|---|---------|------------|--------|
| 1 | PDF export requirement | Commit `d4e5f6` (Mar 22) | +6h effort |
| 2 | Admin dashboard feature | Commit `g7h8i9` (Mar 28) | +12h effort |
| 3 | Email verification flow | Commit `j1k2l3` (Apr 2) | +8h effort |
| 4 | Rate limiting changed from simple to account-based | Commit `m4n5o6` (Apr 8) | +4h effort |
**Total creep: +30 hours of additional effort beyond original estimate**
Creep Timeline: Show when scope grew over time.
## Creep Timeline
Mar 15 ████░░░░░░░░░░░░░░░░ 28 (original)
Mar 22 ██████░░░░░░░░░░░░░░ 38 (+PDF export)
Mar 28 ██████████░░░░░░░░░░ 52 (+admin dashboard)
Apr 02 █████████████░░░░░░░ 61 (+email verification)
Apr 08 ██████████████████░░ 71 (+rate limiting change)
Apr 11 ██████████████████░░ 71 (current)
Scope grew 154% in 27 days
Creep Severity Assessment: Rate the overall creep level.
## Creep Assessment
| Level | Threshold | Status |
|-------|-----------|--------|
| 🟢 Healthy | 0-20% growth | — |
| 🟡 Watch | 21-50% growth | — |
| 🟠 Warning | 51-100% growth | — |
| 🔴 Critical | 100%+ growth | ← THIS SPEC (154%) |
**Verdict: 🔴 CRITICAL SCOPE CREEP**
This spec has more than doubled since its original version.
Recommendations: Suggest how to address the creep.
## Recommendations
1. **Split the spec** — Original scope (5 reqs) is a viable MVP. New additions could be Phase 2.
2. **Re-estimate** — Original estimate of 30h is no longer valid. Current realistic estimate: 65h.
3. **Prioritize** — Rank the 4 new additions by business value. Cut the lowest-value one.
4. **Freeze scope** — No new requirements until current scope is implemented.