| description | Execute work tracked in beads_rust (`br`) issues — claim a ready issue, do the work, record progress, capture discovered work without derailing, close cleanly, and keep the JSONL/DB pair in sync. Solo-agent and cross-session-by-same-agent only. Use when issues already exist in `.beads/` and an agent needs to work them across one or many sessions. NOT for creating issues from a planning document (use `plan-to-beads` for that) and NOT for multi-agent coordination. |
Beads to Done
This skill covers the execution phase: an agent sits down to a populated .beads/ and needs to do the work — claim, implement, record, close — across one or many sessions of the same agent.
It is the partner to plan-to-beads: planning produces beads; this skill carries them to done.
When this skill applies
- An agent is starting a session against a repo with
.beads/ already populated.
- An agent is resuming work the same agent (possibly past-self, possibly different session) left mid-flight.
- An agent is closing out a finished issue.
- A discovery during work warrants capturing a new issue without derailing the current task, or reveals that the current issue is wrong.
- The JSONL and the DB are out of sync after a
git pull (or for any other reason).
This skill does not cover:
- Creating issues from a planning document. That's
plan-to-beads's job. When discovery during execution warrants a new issue, this skill points back at plan-to-beads for the field-content discipline.
- Multi-agent coordination / swarm features. This skill is solo-agent and cross-session-by-same-agent only.
br coordination status, exclusive claims, scheduler stale-claim policy, reclaim across competing agents, Agent Mail integration — out of scope. If a project uses swarms, this skill is the wrong skill.
br setup, install, repo init. Assumes a working br and a populated .beads/.
The core principle
The issue is the unit of work. The JSONL is the audit trail. The DB is the working copy.
Every mutation — claim, status change, notes update, close — flows through br, never through hand-editing .beads/issues.jsonl. The JSONL exists so a future session (or a teammate, or future-you) can reconstruct exactly what happened and resume. If the JSONL drifts out of sync with the DB, that's a problem the recovery flow fixes — not a problem to ignore.
The single most useful mental model: the issue's fields are the only source of truth for the work. After a session restart or context compaction, the agent will see only what br show <id> returns. Anything kept in conversation context but not written to the issue is gone. Resumability is a property of how the agent writes, not of how clever the next session is.
Publicability gate
If .beads/issues.jsonl may be committed, pushed, shared, or made public, treat every issue field, note, comment, close reason, assignee, and audit-adjacent string as publishable project history.
Write durable Beads content as if a new contributor could read it on GitHub. Preserve the technical state needed to resume; omit or rewrite private process residue:
- Local absolute paths, workstation names, usernames, temp/build directories, private repo paths.
- Secrets, tokens, credential helpers, auth headers, private registry/module settings, or credential validation details.
- Legal, licensing, trademark, customer, outreach, repo-visibility, publication, or launch-gate deliberations unless the public issue is explicitly about wording a public policy.
- Private branch/tag validation, private CI details, internal release rehearsals, or non-public distribution checks.
- Raw prompts, conversation fragments, session IDs, subagent names, mailbox/tool routing, compaction notes, or "user said" provenance.
- Old/alternate organization, module, package, or product names not intended for the public record.
When a private detail explains the work, record the durable decision instead: "Use public install path X" is useful; "Dave said in session Y after private release discussion" is not.
The execution loop at a glance
br sync --status
br sync --import-only
br list --status in_progress --json
br ready --json
br show <id>
br update <id> --claim
br update <id> --notes "<read-then-write snapshot>"
br close <id> --reason "<what + commit ref>" --suggest-next --json
br sync --flush-only
git add .beads/
git commit -m "Close <id>: short summary"
git push
Five phases, in order. Skipping any of them tends to surface as a problem one session later, when a future agent (or future-you) can't tell what happened.
Session mode: single-issue vs queue
The loop above closes one issue. Before starting, decide whether the user wants you to stop after this one or keep going until the queue is empty (or some scope is exhausted). Getting this wrong is the most common way to under- or over-deliver.
Single-issue mode (default)
The user named a specific issue or a small, finite set. Work the loop once per issue, then stop and report back. Typical signals:
- "Work
br-42."
- "Finish the auth refactor bead."
- "Close out the issue I claimed yesterday."
Run the loop, close, report. Don't reach for br ready after closing.
Queue mode
The user wants the queue drained (possibly within a scope). Typical signals:
- "Work through the auth epic."
- "Drain the queue."
- "Keep going until ready is empty."
- "Finish everything that's ready."
- "Get as far as you can this session."
In queue mode, after every close:
br ready --json
If non-empty:
- Prefer newly-unblocked siblings under the same epic before picking unrelated work. Closing a leaf often makes its parent epic closeable (see "Epic close-out" in closing-and-sync.md) or unblocks sibling leaves; finishing the epic before context-switching is usually higher-value than starting a new branch.
- Pick the top item per the normal
br ready priority sort.
- Run the loop again.
If empty:
- Apply the queue-empty definition of done below.
When the scope is in between
Often the user names a scope that's bigger than one issue but smaller than the whole queue — "the auth epic," "all the P0s," "the things blocking the release." Treat it as queue mode bounded by the scope:
- After each close, check
br ready filtered by the scope (--priority 0, an epic's children via br list --parent <epic-id> --status ready, etc.).
- Stop when the scoped subset is empty, not when the whole queue is.
Report what's left outside the scope at the end so the user can decide what's next.
Queue-empty definition of done
When operating in queue mode and br ready (or its scoped subset) returns empty, verify the workspace is actually clean before reporting "done":
br status
br sync --status
git status --short --branch
git log -3 --oneline | cat
The four signals together mean: nothing left to do in scope, JSONL and DB agree, working tree is clean, and the work is shipped. Report this state to the user explicitly — don't just say "done." A useful pattern:
Queue drained. 7 issues closed (br-42..br-48), 3 epics closed (auth-1, auth-2, auth). br ready empty in scope. Sync clean, branch pushed to origin/main.
If any of the four signals is off, fix it before reporting done. A queue that's "empty" but with an unpushed commit isn't actually done.
When to bail out of queue mode early
Queue mode does not mean "work until you crash." Stop and surface to the user when:
- A discovery branch 3 hit ("stop and ask").
- A blocker filed during work blocks the rest of the scoped queue.
- Context is heavy enough that the next close risks losing notes — finish the current issue's notes/close honestly, then report and let the user start a fresh session.
- An unfamiliar safety guard fires during sync. Don't
--force through it in batch mode; surface to the user.
In each case, leave the workspace in a clean, resumable state (notes current on whatever's in_progress, no half-finished mutations) before reporting.
Dispatch: which detail file applies
This SKILL.md is the loop at a glance. Detail lives in six supporting files:
| If you're… | Read |
|---|
Starting a session, picking ready work, claiming an issue, retrieving an epic's agent_context, sanity-checking an issue before starting | claim-and-work.md |
Updating notes, deciding between --notes and br comments add, structuring a resumable progress snapshot | notes-discipline.md |
| Encountering an unexpected behavior, a missing prerequisite, scope creep, or a wrong-issue situation mid-work — deciding whether to spawn a new bead, update the current one, or stop | discovery.md |
| Adding or changing a user-facing input surface (CLI flag, HTTP param, schema field, config key, env var) — what grammar to test | input-surface-testing.md |
Closing an issue (incl. epic close-out and the commit-ordering convention), writing a traceable --reason, syncing JSONL/DB, the git half of the close | closing-and-sync.md |
JSONL/DB divergence, conflict markers in JSONL, a stuck in_progress claim from a crashed session, br doctor | recovery.md |
Cross-references to plan-to-beads
This skill assumes issues already exist. When work reveals a new issue that needs creating, don't redocument the creation grammar here — defer to plan-to-beads:
- Field-content discipline (what goes in
description vs design vs acceptance vs notes): plan-to-beads/field-semantics.md.
- ID shape, parent/child IDs, dependency types (
blocks, discovered-from, related, external): plan-to-beads/structure.md.
- Bulk creation grammar:
plan-to-beads/bulk-import.md.
- Setting governing context on an epic (
agent_context): plan-to-beads/agent-context.md.
This skill's discovery.md covers when a discovery merits a new issue and how to capture it without derailing — but the how to construct the new issue is plan-to-beads's territory.
A note on br quirks worth carrying into the loop
These bite agents who don't know about them. Each is covered in detail in the file where it actually matters:
--notes overwrites. Read existing notes before writing or you'll erase history. See notes-discipline.md.
- Auto-flush is on by default, so mutations land in JSONL as they happen — but
br sync --flush-only is a cheap, idempotent final check before staging. See closing-and-sync.md.
br never runs git. Staging, committing, pushing are always explicit. See closing-and-sync.md.
agent_context inheritance is opt-in per project. Even when set on an epic, descendants don't surface it unless inherited_context.enabled: true (or BR_INHERITED_CONTEXT=1). Check explicitly with br show <epic-id> --json rather than assuming. See claim-and-work.md.
- Bulk operations are not transactional.
br create -f and other bulk mutations can partially succeed and emit warnings in the same run. Inspect --json output rather than trusting exit code alone. (This skill rarely uses bulk operations, but worth knowing.)
br lint is not a generic validator. Some rule sets check for headings inside description that conflict with separated-fields philosophy. Run br lint only if the project's rules align with separated fields.
- Live behavior > memorized flags. When in doubt about a flag or output shape,
br capabilities --command <name> --format json and br <subcommand> --help are the live source of truth.
- Input-surface changes need grammar tests, not just behavior tests. If the work adds or changes a CLI flag, HTTP param, schema field, config key, or env var, the tests must exercise the parser/validator through the real surface — not just call the business function directly. See input-surface-testing.md.
Quick checklist for any execution session
- Did you confirm session mode — single-issue or queue? See "Session mode" above.
- Did you
sync --status at the top? Cheap, prevents stale-DB surprises.
- Did you check
list --status in_progress before claiming new work? A stuck claim from a previous session is the first thing to handle.
- Did you read
br show <id> and the epic's agent_context (if any) before starting? Mid-work surprises are usually constraints that were on the parent epic.
- Are you updating
notes at milestones, not just at the end? Context compaction is not negotiable; the only record of what happened is what you wrote.
- When the work surprised you, did you correctly route the surprise — update the current issue, spawn a new one, or stop and ask? See discovery.md.
- If the issue added or changed an input surface, did you test the grammar (not just the business behavior)? See input-surface-testing.md.
- Did you keep notes/comments/reasons publishable if
.beads/ is committed or shared? See "Publicability gate" above.
- Does the close
--reason include both a summary and a commit ref? "Done" or "Implemented" leaves the next agent with nothing.
- In queue mode, did you re-check
br ready after every close and apply the queue-empty definition of done before reporting?
- Did
git push succeed? Work is not done until the JSONL is on the remote.
Supporting files
- claim-and-work.md — Session start, finding ready work, the
--claim mechanics, status transitions, retrieving an epic's agent_context, the read-before-claim check that catches a wrong issue before you start.
- notes-discipline.md —
--notes overwrite semantics, read-before-write pattern, --notes vs br comments add, structuring a resumable progress snapshot.
- discovery.md — Heuristics and worked examples for the three discovery branches: new bead needed, current bead is wrong, scope creep. Wiring
discovered-from dependencies. When to stop and ask the user.
- input-surface-testing.md — When an issue adds or changes a user-facing input surface (CLI flag, HTTP param, schema field, config key, env var), the checklist of grammar dimensions to test through the real surface. Principle: test the shape of the input, not just the downstream behavior.
- closing-and-sync.md — Acceptance walkthrough, notes cleanup, traceable close reasons, the implementation-commit / close / tracker-commit ordering, epic close-out (no-code closes),
--suggest-next, the JSONL/DB model, sync commands.
- recovery.md —
sync --status decision tree, three-way merge, force modes, JSONL conflict markers, history restore, br doctor, and the same-agent stuck-claim case.