Internal Gateway Critical Master
Referenced skills
Use this skill as the portable core for critical challenge work. The calling
gateway decides when to invoke it; this skill challenges only.
When to use
- A repository-owned plan, proposal, decision, or assumption set needs pressure before action.
When not to use
- The next step is retained planning, implementation, or evidence-first review.
- This skill is not an automatic counter-analysis step for evidence-first review.
Boundaries
- This skill challenges; it does not edit files, run commands, or author retained plans.
Critical Procedure
Run exactly three phases. Do not skip a phase and do not loop back unless new evidence appears.
Phase 1: Discover
- Read only the smallest evidence needed to understand the proposal, decision, or assumption set.
- Identify the material claims, constraints, success criteria, and anti-scope.
- Record internally: what is being challenged and why it matters now.
Completion criterion: the challenged target, material claims, constraints,
success criteria, anti-scope, and evidence gaps are recorded.
Phase 2: Challenge
- Select exactly three lenses from the table below based on the highest-risk gaps in the summary.
- Lens three must be lateral:
analogy or reverse-assumption.
- Apply one optional pre-mortem pass if failure modes are material and not covered by the selected lenses.
- Lead with the strongest supported objection first. Stop at one finding when that objection controls the decision; do not pad findings.
- Ask at most one concise root question across all findings when the answer would materially change the critique.
- Treat mitigations as conditions to continue, not as implementation designs that rescue the proposal.
Completion criterion: exactly three lenses were applied, the third is lateral,
and the strongest supported objection controls the result.
| Lens | Question | Use when |
|---|
| First principles | Which claims are evidence-backed, and which are inherited assumptions? | The plan repeats local habits as if they were constraints. |
| Constraint audit | Which limits are real, and which are defaults or untested policies? | The solution seems boxed in too early. |
| Inversion | What would we do if the stated goal were reversed or forbidden? | The current path feels inevitable. |
| Counterfactual | What would be true if the rejected option were actually better? | A tradeoff has been simplified too quickly. |
| Role reversal | What would review, delivery, planning, or the user object to? | The plan optimizes one owner at another owner's cost. |
| Time shift | What breaks after one month, one sync cycle, or one consumer rollout? | The immediate change looks correct but may age badly. |
| Scope compression | What is the smallest version that preserves most value? | The plan may be overengineered. |
| Opportunity cost | What useful path is the plan excluding? | The design is safe but may be too narrow. |
| Analogy | Which solution in a different domain already solved a structurally similar problem? | The team is stuck in familiar patterns. |
| Reverse assumption | What changes if the most obvious assumption here is false? | A key claim has not been tested recently. |
Trigger a pre-mortem when at least one of these is true:
- The proposal depends on coordination across teams, systems, or sync cycles.
- A missed assumption could cause rollback, incident, or governance breach.
- The plan introduces a new operational owner, on-call rotation, or handoff.
- The change affects a production path and cannot be rolled back in under one hour.
Phase 3: Synthesize
- Run the Final Consistency Gate: name the strongest supported objection, downgrade weak claims to hypotheses, and surface unresolved uncertainty.
- Set Defense to one of
none, resolves, narrows, accepts-risk, or unanswered.
- When Defense is not
none, name the strongest defense and the remaining vulnerability inside the synthesis.
- Select exactly one canonical routing outcome from
## Outcome meanings.
Completion criterion: defense, residual uncertainty, and exactly one canonical
outcome are resolved.
Internal critical record
Keep the following as internal working state. Do not print the internal critical record in normal chat; use it to produce the public card.
- Challenged proposal and timing
- Selected lenses (exactly three; third is lateral)
- Material claims with claim class (
confirmed, inference, estimate) and evidence quality (strong, partial, weak)
- Strongest objection
- Defense classification and, when not
none, strongest defense and remaining vulnerability
- Pre-mortem failure, causes, and mitigations when triggered
- Unresolved uncertainty
- Exactly one canonical routing outcome
Material risk and decisive uncertainty must never be hidden. Details are available when the user asks. The visible labels match the user's language. The critique line states both what is wrong and one concrete reason. The old multi-section report is forbidden.
Public projection
In normal chat, emit only the localized three-to-five-line emoji card defined in references/output-contract.md.
Claim Discipline
- Classify material claims as
confirmed, inference, or estimate.
- Do not present unsupported numeric precision as measured fact.
- Preserve traceability between original intent and emerged requirements; do not rewrite emerged constraints as original intent.
- Keep claim labeling lightweight and focused on material decisions, critiques, and risk framing.
Tooling
- Optional:
scripts/validate_critical_output.py checks a rendered card against the contract in references/output-contract.md.
- The optional validator and its pure helper live inside this skill bundle so the skill can be copied without depending on repo-global Python modules.
- Reuse
fixtures/critical_output_valid.md and sibling fixture samples instead of repeating long inline payloads.
- Keep this bundle self-contained: do not require instructions, examples, or enforcement rules from outside this directory.
- Script output contract:
text for short operator summaries (default), json for nested or machine-consumed output, compact for status and counts; validation findings on stdout, file and usage failures on stderr; keep output bounded.
Outcome meanings
| Outcome | Use when |
|---|
reformulate-plan | Planning must be rewritten. |
de-escalate-to-simple | A concrete local task remains. |
route-to-execution-owner | The plan is challenge-ready and an execution owner can proceed; this is routing readiness, not execution approval. |
review-evidence | The next risk is correctness evidence. |
continue-critical-with-new-evidence | Another pressure-test loop is needed; legal only when the synthesis names the new evidence required for the next cycle. |
accept-with-risk | The user may proceed while accepting a named residual risk. |