Skip to main content
GitHub 仓库

vibe-innovation-lab

vibe-innovation-lab 收录了来自 periodicpoint 的 18 个 skills,并提供仓库级职业覆盖和站内 skill 详情页。

已收集 skills
18
Stars
9
更新
2026-04-26
Forks
4
职业覆盖
5 个职业分类 · 已分类 100%
仓库浏览

这个仓库中的 skills

chaos
纯艺术家(含画家、雕塑家与插画家)

Run the divergent, psychodelic, chaos protocol. A deliberate cognitive jolt that emits heterogeneous fragments (facts, poetry, multilingual shards, silence, non-sequiturs) to dissolve calcified thought patterns and surface genuinely new associations. Use when divergence has collapsed, the user is stuck, convergent thinking has locked the option space, all ideas sound alike, or the team is going in circles. Trigger phrases include "ich komme nicht weiter", "wir drehen uns im Kreis", "alle Ideen klingen gleich", "I am stuck", "break the pattern", "shake things up", "we need a jolt".

2026-04-26
innovate-phase
项目管理专家

Run a specific phase (0 through 5) of the Vibe Innovation Framework. Reads the current ICD, executes the full phase prompt, writes the structured output back to the ICD. Use when the user wants to advance to the next phase, re-run a specific phase, or jump directly into Phase N because their starting TRL maps there. Trigger phrases include "Phase 2 starten", "weiter mit Phase 3", "run phase 1", "ideation phase", "do phase 4 build", "advance to validation".

2026-04-26
innovate
管理分析师

Start the Vibe Innovation Framework. Runs entry diagnostic, session planning, ICD initialization, and phase dispatch from the user's current uncertainty level (TRL -2 to 4). Use when the user wants to begin a new innovation project, has only a vague idea or none at all, asks where to start, needs the framework's entry routing, or wants to resume from an existing ICD. Trigger phrases include "start innovation", "ich habe eine Idee", "wo fange ich an", "let us begin", "neues Projekt", "framework run starten", "I want to ideate".

2026-04-26
innovate-status
项目管理专家

Show current innovation project status: TRL, active phase, open assumptions, loop-back budget, and recommended next step. Use when the user wants a quick situational read, asks where the project stands, needs a status report between sessions, or before deciding the next move. Trigger phrases include "status", "wo stehen wir", "was ist offen", "current TRL", "what is next", "Lagebild".

2026-04-26
chaos
市场调研分析师与营销专员

Run the divergent, psychodelic, chaos protocol. A deliberate cognitive jolt that emits heterogeneous fragments (facts, poetry, multilingual shards, silence, non-sequiturs) to dissolve calcified thought patterns and surface genuinely new associations. Use when divergence has collapsed, the user is stuck, convergent thinking has locked the option space, all ideas sound alike, or the team is going in circles. Trigger phrases include "ich komme nicht weiter", "wir drehen uns im Kreis", "alle Ideen klingen gleich", "I am stuck", "break the pattern", "shake things up", "we need a jolt".

2026-04-26
innovate-phase
项目管理专家

Run a specific phase (0 through 5) of the Vibe Innovation Framework. Reads the current ICD, executes the full phase prompt, writes the structured output back to the ICD. Use when the user wants to advance to the next phase, re-run a specific phase, or jump directly into Phase N because their starting TRL maps there. Trigger phrases include "Phase 2 starten", "weiter mit Phase 3", "run phase 1", "ideation phase", "do phase 4 build", "advance to validation".

2026-04-26
innovate
市场调研分析师与营销专员

Start the Vibe Innovation Framework. Runs entry diagnostic, session planning, ICD initialization, and phase dispatch from the user's current uncertainty level (TRL -2 to 4). Use when the user wants to begin a new innovation project, has only a vague idea or none at all, asks where to start, needs the framework's entry routing, or wants to resume from an existing ICD. Trigger phrases include "start innovation", "ich habe eine Idee", "wo fange ich an", "let us begin", "neues Projekt", "framework run starten", "I want to ideate".

2026-04-26
innovate-status
自然科学管理人员

Show current innovation project status: TRL, active phase, open assumptions, loop-back budget, and recommended next step. Use when the user wants a quick situational read, asks where the project stands, needs a status report between sessions, or before deciding the next move. Trigger phrases include "status", "wo stehen wir", "was ist offen", "current TRL", "what is next", "Lagebild".

2026-04-26
innovate-experiment
项目管理专家

Design a single validation experiment. One assumption, one experiment, one numeric threshold defined upfront. Use when the team needs to test an assumption between phases, refine a Phase 3 experiment design, or design a follow-up experiment after a Phase 4 inconclusive result. Enforces Principle 7 (one experiment, one assumption).

2026-04-26
innovate-export
项目管理专家

Render derived artifacts from the Innovation Canvas Document. Produces the two-page executive summary, an extracted decision log, the artifact specification handoff, or a status report suitable for sharing outside the team. Use at Phase 5 exit, before a stakeholder presentation, or whenever a derived view is needed.

2026-04-26
innovate-icd
项目管理专家

Manage the Innovation Canvas Document (ICD). Initialize, validate against the JSON schema, render a Markdown view, diff against a previous version, or save. Use whenever the user asks to start, check, sync, or persist their ICD between sessions.

2026-04-26
innovate-loopback
项目管理专家

Run the Vibe Innovation Framework mini-gate assessment to scope, justify, and execute a loop-back. Use when evidence in the current phase suggests an earlier phase's output is wrong, when a red-team challenge cannot be addressed in the current phase, or when an assumption from an earlier phase has been falsified.

2026-04-26
innovate-redteam
项目管理专家

Run the Vibe Innovation Framework red team protocol on any artifact (problem statement, concept, business model, experiment design, prototype, decision). Use when stress-testing an artifact against adversarial framings outside the usual phase Step 7 moment, or as a standalone sanity check before locking an output.

2026-04-26
innovate-experiment
项目管理专家

Design a single validation experiment. One assumption, one experiment, one numeric threshold defined upfront. Use when the team needs to test an assumption between phases, refine a Phase 3 experiment design, or design a follow-up experiment after a Phase 4 inconclusive result. Enforces Principle 7 (one experiment, one assumption).

2026-04-25
innovate-export
项目管理专家

Render derived artifacts from the Innovation Canvas Document. Produces the two-page executive summary, an extracted decision log, the artifact specification handoff, or a status report suitable for sharing outside the team. Use at Phase 5 exit, before a stakeholder presentation, or whenever a derived view is needed.

2026-04-25
innovate-icd
项目管理专家

Manage the Innovation Canvas Document (ICD). Initialize, validate against the JSON schema, render a Markdown view, diff against a previous version, or save. Use whenever the user asks to start, check, sync, or persist their ICD between sessions.

2026-04-25
innovate-loopback
项目管理专家

Run the Vibe Innovation Framework mini-gate assessment to scope, justify, and execute a loop-back. Use when evidence in the current phase suggests an earlier phase's output is wrong, when a red-team challenge cannot be addressed in the current phase, or when an assumption from an earlier phase has been falsified.

2026-04-25
innovate-redteam
管理分析师

Run the Vibe Innovation Framework red team protocol on any artifact (problem statement, concept, business model, experiment design, prototype, decision). Use when stress-testing an artifact against adversarial framings outside the usual phase Step 7 moment, or as a standalone sanity check before locking an output.

2026-04-25