Skip to main content
在 Manus 中运行任何 Skill
一键导入
pmcfadin
GitHub 创作者资料

pmcfadin

按仓库查看 1 个 GitHub 仓库中的 18 个已收集 skills。

已收集 skills
18
仓库
1
更新
2026-07-18
仓库分布

Skills 分布在哪些仓库

按已收集 skill 数展示主要仓库,并显示它们在该创作者目录中的占比和职业覆盖。

仓库浏览

仓库与代表性 skills

flow-address
软件开发工程师

Resolve PR review comments for an in-review issue — fix them in the issue's worktree, re-run the gate + C as needed, push, and reply per thread. Fourth stage of the CQLite delivery pipeline. Use when the owner leaves PR comments and says "address

2026-07-18
flow-groom
软件开发工程师

Turn a rough idea into one scoped, labeled GitHub issue (one P0–P3 + status:ready, testable acceptance criteria), and decide oracle-vs-design routing. First stage of the CQLite delivery pipeline. Use when the owner says "groom <idea>", "file an issue for X", or brings a rough idea to scope.

2026-07-18
flow-implement
软件开发工程师

Implement an approved issue — spawn sstable-developer (TDD) in the issue's worktree, run rust-reviewer + roborev on the lite-green diff BEFORE any full gate (review-first is default), open the PR, then hand the endgame (the ONE full gate → C → final roborev → merge-on-green → finalize) to a disposable flow-closer agent so gate/review churn never accretes in the lead session. Third stage of the CQLite delivery pipeline. Requires owner approval of the spec (design-driven) first. Use when the owner says "implement

2026-07-18
ci-cd-validation-merge-workflow
软件开发工程师

Pre-push validation checklist (cargo fmt, clippy with zero warnings, feature flag testing, test suite), CI monitoring, merge process, and release quality gates. Use when preparing to push code, validating changes before PR, running CI checks, merging PRs, or preparing releases.

2026-07-18
flow-board
软件开发工程师

Report status across all in-flight CQLite delivery work — render the shared GitHub Project claim board (item, status, assignee, priority) with drift + abandoned-claim reconciliation, then surface and drive the single furthest-along item waiting on the owner (a green PR to merge, a spec to approve), or offer a claim-aware pick-list. Use when the owner asks "where do things stand", "what's next", "unblock me", or "what needs me".

2026-07-18
flow-activate
软件开发工程师

Activate a groomed design-driven issue — create its worktree + branch (1:1:1:1), run OpenSpec propose to produce proposal/design/specs/tasks, render the spec + recommended design INLINE, then STOP for the owner's approval. This is Seam 1; it never implements. Second stage of the CQLite delivery pipeline. Use when the owner says "activate

2026-07-18
flow-finalize
软件开发工程师

Finalize a merged issue — archive its OpenSpec change (sync delta specs into openspec/specs/), remove the worktree + branch, and close the issue with a traceable comment. Fifth stage of the CQLite delivery pipeline. Runs after the PR is merged — workers merge autonomously on green (gate PASS + C PASS + roborev clean), so finalize normally follows the worker's own merge. Use right after a merge (or when the owner says "finalize

2026-07-18
ci-cd-validation-merge-workflow
软件质量保证分析师与测试员

Pre-push validation checklist (cargo fmt, clippy with zero warnings, feature flag testing, test suite), CI monitoring, merge process, and release quality gates. Use when preparing to push code, validating changes before PR, running CI checks, merging PRs, or preparing releases.

2026-07-13
当前展示该仓库 Top 8 / 18 个已收集 skills。
已展示 1 / 1 个仓库
已展示全部仓库
pmcfadin Agent Skills | SkillsMP