| description | Assign AP table ratings (H-AP, M-AP, L-AP) in PFMEA or DFMEA — the RPN replacement from AIAG-VDA FMEA Handbook 2019. Explains H/M/L classification logic, mandatory action requirements for High Priority items, and OEM-specific thresholds. Use when assigning risk levels in PFMEA or DFMEA, or auditing FMEA documents for AP compliance. |
| license | MIT |
| metadata | {"author":"RBraga01","version":"1.1","iatf-16949":"8.3.3.3","aiag-reference":"AIAG-VDA FMEA Handbook 2019, Step 5, Table 5-3","domain":"quality-engineering","subdomain":"risk-analysis","industries":"automotive,electronics,aerospace,medical,general","status":"approved","created":"2026-06-01","last_updated":"2026-06-03","updated_by":"migmcc","reviewed_by":"RBraga01","standard_edition":"AIAG-VDA FMEA Handbook 2019"} |
Action Priority (AP) — AIAG-VDA 2019
Goal
Assign and audit Action Priority (AP) ratings correctly using the AIAG-VDA 2019 method, ensuring high-risk items receive justified action or formal risk acceptance. This skill is used when classifying risk levels in PFMEA or DFMEA, reviewing existing ratings, or auditing FMEA documents for AP compliance.
Required AP Review Checklist
☐ Confirm the linked Failure Effect, Failure Mode, and Failure Cause are correct before assigning AP
☐ Confirm S is based on the Failure Effect (severity to the customer or end user)
☐ Confirm O is based on the Failure Cause with current prevention controls in place
☐ Confirm D is based on current detection controls for this Failure Mode
☐ All S, O, and D ratings are supported by data, field history, capability data, or documented engineering judgement — not guesses
☐ Assign AP using the full AIAG-VDA AP table (see ap-table.md) — not only the summary patterns in this skill
☐ For every H-AP item: define a corrective action with owner and target date, or document a formal escalation rationale
☐ Reassess AP only after the corrective action is implemented and verified — not when only planned
☐ Verify Special Characteristics are rated S = 9 or 10
☐ Document the evaluation decision for every M-AP item (action taken or rationale for no action)
☐ Document rationale for every L-AP item
Why AP replaces RPN
The legacy RPN = Severity × Occurrence × Detection had critical flaws:
Problem 1 — Same RPN, very different risk
- S=6, O=6, D=6 → RPN = 216
- S=9, O=8, D=3 → RPN = 216
The second scenario involves a safety-related severity (S=9) and high occurrence — far more dangerous — yet produces the same RPN.
Problem 2 — Easy to game
Teams learned to lower RPN cheaply by improving detection (adding an inspection step). D: 8→3 drops RPN by 62.5%. But the defect is still being made — it's just being caught later. Prevention (reducing occurrence) is harder but far more valuable.
Problem 3 — No mandatory threshold
RPN had no defined threshold for mandatory action. "High RPN" meant different things to different teams and customers.
The AP fix:
- S=9 or S=10 → always H (mandatory action), regardless of O and D
- AP looks at S and O together first (risk of harm occurring), then considers D
- Requires documented action or documented rationale for no action
AP Classification
H — High Priority
Action required. Assign a responsible person and a target completion date.
If no improvement is achievable (technically or economically), the team must:
- Document why no action is possible
- Escalate to management for acceptance of residual risk
- Get management sign-off
H-AP items must never be silently ignored.
Conditions that always produce H:
- S = 9 or 10 (any O, any D)
- S = 8 + O = 6–10 + D = 6–10
M — Medium Priority
Action recommended. The team should evaluate whether risk reduction is beneficial.
M-AP does not mean "no action needed." It means action is not mandatory, but the team must document its evaluation decision:
- Action taken → describe the action
- No action → document why (risk accepted, cost-prohibitive, technically infeasible)
L — Low Priority
No action required. Document rationale for the record.
AP Assessment Workflow
This skill explains AP logic and decision patterns. Use the full AP table (ap-table.md) for final rating assignment. Do not rely solely on the summary patterns below for disputed cases or formal PPAP submissions.
Before assigning AP: Do not assign AP unless S, O, and D are already justified based on the linked failure effect, failure cause, and current controls. AP is only as good as the ratings it is built on.
For each FC (Failure Cause) row in the PFMEA/DFMEA:
1. Assign S (for the linked Failure Effect)
2. Is S = 9 or 10?
→ Yes: AP = H. Done.
→ No: continue
3. Assign O (for this Failure Cause with current prevention controls)
4. Assign D (for this Failure Mode with current detection controls)
5. Look up AP in the full table (see ../pfmea-process/assets/ap-table.md)
All S, O, and D ratings must be supported by test data, field history, capability data, or documented engineering judgement.
Action priority by S bracket
The patterns below are practical summaries for working use. Final AP assignment must always be confirmed against the full AIAG-VDA AP table. For disputed cases or audits, the full table takes precedence.
S = 9–10 (Safety / Regulatory)
S = 8 (Loss of primary function)
| O | D | AP |
|---|
| 6–10 | Any | H |
| 4–5 | 6–10 | H |
| 4–5 | 1–5 | M |
| 1–3 | Any | M |
S = 7 (Reduced primary function)
| O | D | AP |
|---|
| 6–10 | 7–10 | H |
| 6–10 | 4–6 | M |
| 6–10 | 1–3 | M |
| 4–5 | 7–10 | M |
| 4–5 | 4–6 | M |
| 4–5 | 1–3 | L |
| 1–3 | Any | L |
S = 6 (Loss of comfort/convenience)
| O | D | AP |
|---|
| 8–10 | 7–10 | H |
| 8–10 | 4–6 | M |
| 8–10 | 1–3 | M |
| 5–7 | 7–10 | M |
| 5–7 | 1–6 | L |
| 1–4 | Any | L |
S = 1–5
All combinations → L
Revised AP — Governance Rule
Do not lower AP based on planned actions. Revised AP may only be assigned after the corrective action is implemented and the implementation is verified with objective evidence. A planned action is not a completed action.
Reviewing an existing FMEA for AP compliance
Audit questions:
- Are all S=9/10 rows assigned AP=H?
- Do all H-AP rows have an assigned owner AND target date?
- Are there any H-AP rows with no action and no documented escalation rationale?
- For rows where AP was improved (revised AP column): is the action implemented and verified — not just planned?
- Are Special Characteristics all rated S=9 or S=10?
- Are S, O, and D justified with data or engineering rationale, or were they guessed?
Customer-specific notes
| OEM | AP requirement |
|---|
| Ford | H-AP items require mandatory action or documented engineering justification (EJ) |
| GM | BIQS requires all H-AP items closed before PPAP Level 3 |
| VW/Audi | AP H must be actioned or formally accepted by responsible engineer |
| BMW | AP H items listed on open issues list until closed |
| Stellantis | H-AP items require SQE approval for acceptance without action |
Customer-Specific Requirements (CSR) are revision-controlled and may change. Always verify the latest customer requirement before release, PPAP, or customer submission. See oem-requirements.md for OEM-specific detail.
Output Format
At the start of each use, ask the user:
"How would you like to receive the output?
A — Structured Markdown (formatted tables and sections, ready to copy)
B — Plain tables (simplified structure for Excel or Word)
C — Narrative report (flowing text for a formal document or email)
Default: A."
Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.
Changelog
| Version | Date | Author | Change |
|---|
| 1.0 | 2026-06-01 | @RBraga01 | Initial release |
| 1.1 | 2026-06-03 | @migmcc | Polished AP classification logic, added OEM CSR requirements table |