一键导入
estimate
Estimates task effort by analyzing complexity, dependencies, historical velocity, and risk factors. Produces a structured estimate with confidence levels.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Estimates task effort by analyzing complexity, dependencies, historical velocity, and risk factors. Produces a structured estimate with confidence levels.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Configure the project's game engine and version. Pins the engine in AGENTS.md, detects knowledge gaps, and populates engine reference docs via webfetch when the version is beyond the LLM's training data.
Run an automated smoke test using the godot-mcp server. Launches the project, captures debug output, and checks for errors or crashes.
Configure the project's game engine and version. Pins the engine in AGENTS.md, detects knowledge gaps, and populates engine reference docs via webfetch when the version is beyond the LLM's training data.
Validate readiness to advance between development phases. Produces a PASS/CONCERNS/FAIL verdict with specific blockers and required artifacts. Use when user says 'are we ready to move to X', 'can we advance to production', 'check if we can start the next phase', 'pass the gate'.
Reviews a game design document for completeness, internal consistency, implementability, and adherence to project design standards. Run this before handing a design document to programmers.
Rapid prototyping workflow. Skips normal standards to quickly validate a game concept or mechanic. Produces throwaway code and a structured prototype report.
| name | estimate |
| description | Estimates task effort by analyzing complexity, dependencies, historical velocity, and risk factors. Produces a structured estimate with confidence levels. |
| argument-hint | [task-description] |
| user-invocable | true |
| allowed-tools | Read, Glob, Grep |
Read the task description from the argument. If the description is too vague to estimate meaningfully, ask for clarification before proceeding.
Read AGENTS.md for project context: tech stack, coding standards, architectural patterns, and any estimation guidelines.
Read relevant design documents from design/gdd/ if the task relates to a documented feature or system.
Identify files and modules that would need to change:
production/sprints/ for similar completed tasks and historical velocityCode Complexity:
Scope:
Risk:
## Task Estimate: [Task Name]
Generated: [Date]
### Task Description
[Restate the task clearly in 1-2 sentences]
### Complexity Assessment
| Factor | Assessment | Notes |
|--------|-----------|-------|
| Systems affected | [List] | [Core, gameplay, UI, etc.] |
| Files likely modified | [Count] | [Key files listed below] |
| New code vs modification | [Ratio] | |
| Integration points | [Count] | [Which systems interact] |
| Test coverage needed | [Low / Medium / High] | |
| Existing patterns available | [Yes / Partial / No] | |
**Key files likely affected:**
- `[path/to/file1]` -- [what changes here]
### Effort Estimate
| Scenario | Days | Assumption |
|----------|------|------------|
| Optimistic | [X] | Everything goes right, no surprises |
| Expected | [Y] | Normal pace, minor issues, one round of review |
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day |
**Recommended budget: [Y days]**
### Confidence: [High / Medium / Low]
[Explain which factors drive the confidence level for this specific task.]
### Risk Factors
| Risk | Likelihood | Impact | Mitigation |
|------|-----------|--------|------------|
### Dependencies
| Dependency | Status | Impact if Delayed |
|-----------|--------|-------------------|
### Suggested Breakdown
| # | Sub-task | Estimate | Notes |
|---|----------|----------|-------|
| 1 | [Research / spike] | [X days] | |
| 2 | [Core implementation] | [X days] | |
| 3 | [Testing and validation] | [X days] | |
| | **Total** | **[Y days]** | |
### Notes and Assumptions
- [Key assumption that affects the estimate]
- [Any caveats about scope boundaries]
Output the estimate with a brief summary: recommended budget, confidence level, and the single biggest risk factor.
This skill is read-only — no files are written. Verdict: COMPLETE — estimate generated.
/prototype) before committing./create-stories./sprint-plan update to add it to the next sprint.