Skip to main content

construction-phase-plan

Produces a consultant-grade, risk-proportionate CDM 2015 Construction Phase Plan (CPP) for a named construction project. Use this skill whenever a user asks to build, write, or review a Construction Phase Plan, a CPP, a CDM 2015 Regulation 12 plan, or the principal contractor's pre-start plan. Forces project specificity (refuses 'a building site' — needs the named project, at least one significant activity, and the contractor configuration), sets out management & arrangements, site rules, and significant risks & controls by activity ranked by the hierarchy of controls (work at height leads with collective protection, never PPE), states the F10 / Reg 12 notification duty for a notifiable project, and cross-references the wider CDM document chain (Pre-Construction Information and the Health & Safety File). Grounded in CDM 2015 Reg 12 + HSE L153 in the UK, or 29 CFR 1926 Subpart C in the USA; India BOCW defers to hse-india with state detection. Decision-support only; a competent person must review the output.

الانتقال إلى التثبيت

معلومات المصدر

المستودع
ashley-eyekyam/hse-leadership-skills
آخر نشاط في المصدر
٧ يوليو ٢٠٢٦ في ٠٥:٢١
لغة SKILL.md المكتشفة
الإنجليزية
النجوم
١
التفرعات
٠

خيارات التثبيت

يُحدَّد Prompt الذي يراجع المصدر أولًا بشكل افتراضي. يمكنك التبديل إلى أمر مباشر أو تنزيل نسخة محلية.

مراجعة ملفات المصدر

اقرأ SKILL.md وأي ملفات مرافقة يعرضها SkillsMP قبل أن تقرر التثبيت.