Skip to main content

electrical-permit-switching-program

Produces a consultant-grade HV/LV switching program (a switching schedule + safety-document plan) for named electrical apparatus, driven by the de-energize-first hierarchy and the isolation → prove-dead → earthing → sanction-to-test discipline. Use this skill whenever a user asks to build a switching program or switching schedule, plan an isolation, write a permit-to-work or sanction-to-test, take HV/LV equipment to a safe working condition and back, or sequence the points of isolation, prove-dead, and protective earthing. It refuses to author a program for "the substation" without the named apparatus, voltage, and points of isolation/earthing; it records the ordered switching sequence with per-step authorisation, gates work behind prove-dead AND protective earthing where required (un-proven or un-earthed work is flagged), and keeps the sanction-to-test distinct from a work permit. Grounded in NFPA 70E Article 120, OSHA 1910.269/.333/.147, and EAWR 1989. Decision-support only; a competent person must review.

الانتقال إلى التثبيت

معلومات المصدر

المستودع
ashley-eyekyam/hse-leadership-skills
آخر نشاط في المصدر
٧ يوليو ٢٠٢٦ في ٠٥:٢١
لغة SKILL.md المكتشفة
الإنجليزية
النجوم
١
التفرعات
٠

خيارات التثبيت

يُحدَّد Prompt الذي يراجع المصدر أولًا بشكل افتراضي. يمكنك التبديل إلى أمر مباشر أو تنزيل نسخة محلية.

مراجعة ملفات المصدر

اقرأ SKILL.md وأي ملفات مرافقة يعرضها SkillsMP قبل أن تقرر التثبيت.