Produce a consultant-grade point-of-work DYNAMIC weather risk assessment for a named renewables site/activity, led by NAMED NUMERIC thresholds -> a hold/stop/evacuate ACTION -> a MANDATORY re-assessment TRIGGER. Use this skill to set weather working limits for turbine/blade/tower or outdoor renewables work, decide when to hold, stop or evacuate for wind, lightning, ice, visibility or temperature, or replace a vague 'monitor the weather' arrangement with defensible numeric triggers. Wind is measured at HUB HEIGHT, not base-of-tower (a base-of-tower reading is a control failure). It OWNS the weather thresholds wind-turbine-work-at-height-rescue (REN-01) only names: BS 7121-1 (2016) 7 m/s man-riding ceiling is the verified anchor, the hub-height cut-off ~=15 m/s is [ASSUMED A4] proposed-and-user-confirms, and every other threshold is user-confirmed or [GAP] -- never invented. De-identifies prior weather-incident context to role labels. Decision-support only; competent-person review required.
يبقى الأمر في سطر واحد. مرّر أفقيًا لمراجعته كاملًا قبل النسخ.
تفضّل نسخة محلية؟ نزّل الملفات المتاحة حاليًا لدى SkillsMP.
مستكشف الملفات
19 ملفات
عرض SKILL.md
SKILL.md
تعليمات المصدر · معاينة للقراءة فقط
name
weather-dynamic-risk-assessment
description
Produce a consultant-grade point-of-work DYNAMIC weather risk assessment for a named renewables site/activity, led by NAMED NUMERIC thresholds -> a hold/stop/evacuate ACTION -> a MANDATORY re-assessment TRIGGER. Use this skill to set weather working limits for turbine/blade/tower or outdoor renewables work, decide when to hold, stop or evacuate for wind, lightning, ice, visibility or temperature, or replace a vague 'monitor the weather' arrangement with defensible numeric triggers. Wind is measured at HUB HEIGHT, not base-of-tower (a base-of-tower reading is a control failure). It OWNS the weather thresholds wind-turbine-work-at-height-rescue (REN-01) only names: BS 7121-1 (2016) 7 m/s man-riding ceiling is the verified anchor, the hub-height cut-off ~=15 m/s is [ASSUMED A4] proposed-and-user-confirms, and every other threshold is user-confirmed or [GAP] -- never invented. De-identifies prior weather-incident context to role labels. Decision-support only; competent-person review required.
The hse-renewables point-of-work DYNAMIC weather risk-assessment skill — given a named site / activity and the weather-sensitive task, it produces a defensible weather RA that is led by NAMED NUMERIC thresholds → a hold / stop / evacuate ACTION → a MANDATORY re-assessment TRIGGER (, ). Wind is measured at for turbine work — a base-of-tower reading understates the exposure and is treated as a . It grounds the weather-as-a-work-at-height-governor relationship in (weather governs whether work at height proceeds).
## Output format
KB-SNIP-DYNAMIC-RA
KB-DATA-WEATHER-THRESHOLDS
HUB HEIGHT, not base of tower
control failure
KB-REG-WAH2005
The single failure mode this skill exists to kill is "monitor the wind and stop if it gets too windy". A weather artifact with no numeric threshold, no defined action, or no re-assessment trigger is the indefensible paperwork this skill rejects. Every weather parameter (wind, lightning, ice, visibility, temperature) carries a specific numeric trigger → a pre-decided action → a re-assessment event — defined in advance, not decided on the day.
Numeric thresholds are propose-and-user-confirms, never invented. The BS 7121-1 (2016 edition) man-riding ceiling of 16 mph / 7 m/s for a personnel-carrier lift is the one verified public anchor. The hub-height tower-top wind cut-off of ≈ 15 m/s is an [ASSUMED A4] industry baseline — not a single citable standard; it is proposed and the user confirms it (stricter for less-experienced teams). Lightning stand-down follows NFPA 780 practice / a lightning-warning service; manufacturer / CPA in-service crane wind limits, ice-accretion, visibility and temperature triggers are user-confirmed or [GAP]. No threshold is asserted as a fixed standard.
This skill OWNS the weather thresholds REN-01 names (CONV-12, kept distinct).wind-turbine-work-at-height-rescue (REN-01) names the hub-height wind hold / lightning stand-down and defers their ownership here; this skill owns KB-DATA-WEATHER-THRESHOLDS and the dynamic-RA method — cross-referenced, never merged.
When to use this skill
Use this skill when the user needs a point-of-work / dynamic weather risk assessment or weather working limits for a named renewables site and a weather-sensitive activity. Trigger phrases: "set the wind / lightning / ice working limits for blade rope-access on WTG-09", "when do we hold, stop or evacuate for weather", "build a dynamic weather RA for the crane lift / tower-top work", "our method statement says 'monitor the wind' — make it defensible", "what wind speed stops man-riding lifts", "confirm the hub-height wind cut-off". If the request is vague ("keep an eye on the weather" / "stop if it's too windy"), the Workflow intake forces the named site, the weather-sensitive activity, the controlling equipment, and a numeric threshold for each parameter before any drafting. This skill owns the weather thresholds + the dynamic-RA method; the WAH plan + tested rescue is wind-turbine-work-at-height-rescue (REN-01) and lone working is lone-working-assessment (REN-02) — cross-referenced, never rebuilt (CONV-12).
Data Protection & De-identification (MANDATORY — apply before drafting)
Apply this BEFORE you draft anything. Treat injury, illness, and any health
detail as the highest sensitivity. Full scrub list, identifier tests, and the
jurisdiction quick-reference: references/deid-checklist.md.
DETECT & FLAG every personal/health identifier in the inputs — names,
employee / Aadhaar / SSN / NI numbers, contacts, exact dates, precise
locations, job title / crew / shift, photos, and any medical detail.
List what you found before drafting. If unsure whether something is
identifying, treat it as identifying.
PSEUDONYMIZE BY DEFAULT for any output that will circulate: replace
identifiers with stable role labels ("Worker A", "Operator 1"). Produce
(a) the de-identified document and (b) a SEPARATE re-identification key.
Never put the key or any name↔label mapping in the document. Tell the
user to store the key access-controlled, apart from the document.
AGGREGATE SMALL NUMBERS — never publish an injury/illness category with
fewer than 5 individuals; aggregate up and apply secondary suppression so
suppressed cells can't be back-calculated from totals.
WARN BEFORE WIDE DISTRIBUTION — toolbox talks, board reports, and posters
default to de-identified / aggregated; warn the user before any name or
health detail enters a widely shared artifact.
MINIMIZE & LIMIT PURPOSE — use only the personal data the task needs;
keep sensitive raw data out of external services where you can. When in
doubt, ask before including it.
Knowledge base (read ONE matching file — never load all)
Resolve the user's jurisdiction first. Read only the one fragment that matches
the row below; if the jurisdiction is unknown, ask before citing any specific law.
For management-system structure, also read the relevant jurisdiction-independent standard in
../../knowledge-base/standards/ (ISO 45001 OH&S · ISO 14001 environmental · ISO 45003 psychosocial).
Always apply ../../knowledge-base/prompt-snippets/hierarchy-of-controls.md (KB-SNIP-HOC)
to every control recommendation. For any benchmark/figure, look up the ID in the relevant
_registry.yaml, then read ONLY the named file — and quote its source+year.
First read the bundle cross-walk ../../knowledge-base/prompt-snippets/renewables-clause-map.md (KB-SNIP-RENEWABLES-CLAUSE-MAP) — it routes the renewables standard → artifact → owning skill (this skill owns the weather thresholds + the dynamic-RA method; REN-01 wind-turbine-work-at-height-rescue only names the thresholds and owns the WAH plan + tested rescue; REN-02 lone-working-assessment owns the lone-working RA). This skill OWNS the weather data + method: read ../../knowledge-base/data-points/weather-thresholds.md (KB-DATA-WEATHER-THRESHOLDS) for the anchors (BS 7121-1 2016 7 m/s man-riding [VERIFIED]; ≈15 m/s hub-height cut-off [ASSUMED A4], proposed-and-user-confirms; NFPA 780 lightning practice; manufacturer/site values [GAP]) and ../../knowledge-base/prompt-snippets/dynamic-ra.md (KB-SNIP-DYNAMIC-RA) for the threshold → action → re-assessment-trigger control spine and the hub-height-not-base measurement discipline. Apply ../../knowledge-base/prompt-snippets/hierarchy-of-controls.md (KB-SNIP-HOC) to every control (eliminate the exposure to weather first — reschedule to a forecast low-weather window / do the work in shelter — before administrative stop-limits). Cross-reference the renewables hazard library ../../knowledge-base/hazard-library/renewables.md for the weather / WAH / dropped-object hazard categories (single home; cross-referenced, never restated). Then resolve the jurisdiction:
Jurisdiction / element
Read
UK (weather governs whether work at height proceeds — the WAH planning + avoid→prevent→mitigate hierarchy + the duty to not work at height in conditions that endanger)
../../knowledge-base/regulatory/wah2005.md (KB-REG-WAH2005 — Work at Height Regs 2005 SI 2005/735: reg 4 plan incl. weather, reg 6 avoid→prevent→mitigate, reg 7 collective-before-personal)
India (work at height / weather)
../../knowledge-base/regulatory/in-renewables.md (KB-REG-IN-RENEWABLES — deferral pointer; state detection is mandatory (CONV-8); defer statutory content to the hse-india engine; no national form number invented)
Unknown
Ask the jurisdiction / regulatory regime before citing any specific regulation
Workflow
Open with a structured multi-step intake — MCQ where the answer space is enumerable, free-text where it is open. Ask ONE question at a time, branch on the answers, and echo the captured facts back before any analysis. Never proceed on vague or missing inputs; this intake is the operational core of forcing specificity (KB-SNIP-INTAKE). (Intake is a Workflow convention, not a sixth block.)
The full typed/branched intake Q-table — the named site / activity (the
specificity anchor: a generic "the wind farm" is refused), the weather-sensitive
task and the controlling equipment (tower-top work / blade rope-access / crane or
man-riding lift / outdoor switching), the weather parameters in play (wind,
lightning, ice, visibility, temperature), the numeric threshold for each parameter
(the core-value gate: a "monitor / stop if too windy" answer with no number is
refused), the measurement point (the hub-height-not-base gate for turbine work),
the action at each threshold (hold / stop / evacuate) and the re-assessment
trigger, and the jurisdiction branch (UK → KB-REG-WAH2005; India →
KB-REG-IN-RENEWABLES + mandatory state detection) — lives in
references/intake.md (the intake-coverage manifest + echo-back +
refuse-on-vague anchors). Run it one question at a time, branch on the answers, and
echo the confirmed site + activity + each parameter's threshold/action/trigger back
before any drafting.
The de-identification step runs FIRST (above): any prior weather-incident
context (a named worker involved in a previous weather-related event) is scrubbed to
role labels before any analysis (references/deid-checklist.md). This is a lower
de-id tier — asset / installation / site-level data dominates — but a clean
role-labelled output is still mandatory.
Then walk the dynamic-RA method (references/METHODOLOGY.md): site / activity /
equipment scoping → for each weather parameter, build the control as a
THRESHOLD → ACTION → RE-ASSESSMENT TRIGGER (KB-SNIP-DYNAMIC-RA): a specific
numeric threshold (the BS 7121-1 2016 7 m/s man-riding figure cited verbatim where a
personnel-carrier lift is used; the ≈15 m/s hub-height tower-top cut-off proposed and
user-confirmed [ASSUMED A4]; lightning per NFPA 780 practice; ice / visibility /
temperature / manufacturer-CPA crane limits user-confirmed or [GAP]) → a pre-decided
action (hold / stop / evacuate) → a mandatory re-assessment trigger (forecast
change, threshold approached, interval). Apply the measurement discipline: wind is
read at hub height, not base of tower — flag a base-of-tower reading used for a
tower-top decision as a control failure. Apply controls.py + KB-SNIP-HOC so the
control leads with eliminating the weather exposure (reschedule to a forecast
low-weather window / shelter the work) before the administrative stop-limit. Re-score
residual risk on the risk_matrix 5×5 after the thresholds + actions, record [GAP]
for any unsupplied numeric basis (manufacturer/site limits, lightning detection radius),
and close each [GAP] with a SMART action (smart_actions) carrying a named role
owner + an ISO due date. Numeric thresholds are user-confirmed / [GAP], never
invented as a fixed standard.
Then: validate the draft against references/QUALITY_CHECKLIST.md → produce the output via the Output format section below. The domain method (the threshold → action → re-assessment-trigger spine + the hub-height measurement discipline + the propose-and-confirm anchor rules) is in references/METHODOLOGY.md.
Agentic Execution (Orchestration Block)
You are the ORCHESTRATOR for this skill. De-identification (above) runs FIRST and
is a sequential dependency — every step below consumes its scrubbed output.
Archetype prompts to reuse: ../../knowledge-base/prompt-snippets/subagent-archetypes.md (KB-SNIP-ARCHETYPES).
Step 0 — Triage: fan out at all?
Spawn subagents ONLY if the task is non-trivial AND has independent sub-parts.
Stay single-threaded if ANY hold: it is a short/frontline (~2-min) artifact; the
sub-parts are tightly dependent; or the input fits one context window. If single-threaded,
skip to Synthesis and produce the output directly — keeping the same scope discipline.
Step 1 — Plan
Decompose into INDEPENDENT jobs. Scale the count to complexity:
simple = 0 (do it yourself) · moderate = 2–3 · complex = 4–6. Never exceed MAX=6.
Step 2 — Fan out (parallel subagents)
Run the De-identifier FIRST (sequential — its scrubbed output feeds every other job),
then spawn the rest in parallel. Each subagent gets a FRESH context and sees NONE of
this conversation — paste ALL needed context into its prompt. Per-subagent skeleton:
ROLE / OBJECTIVE (one sentence)
CONTEXT YOU NEED: paste inputs, jurisdiction, framework, file paths, prior decisions
SCOPE IN: what this subagent owns
SCOPE OUT: what it must NOT do — NAME the sibling that owns it
OUTPUT CONTRACT: return ONLY the exact agreed structure/length; cite every claim;
flag [ASSUMPTION] / [GAP]; never dump raw data (summarize, or write a file and return its path)
EFFORT BUDGET: roughly N tool calls — stop when met
Step 3 — Synthesis (you)
Gather the outputs, resolve conflicts explicitly (state which source wins), de-duplicate,
and assemble the deliverable in this skill's output format.
Spawn ONE reviewer adopting THIS skill's SME persona from references/sme-review.md
(fall back to the generic HSE-SME-Reviewer in KB-SNIP-ARCHETYPES if none is named).
Give it the draft + the inputs + the output contract. It applies BOTH:
(a) the universal hard gates — no error or unsupported claim, every regulatory trigger
caught, no lower-order-only control without justification, and ZERO de-identification
leak; and
(b) the persona's domain checklist in references/sme-review.md — then run the
Omission lens (the SECOND, unconstrained omission pass): detect the emitted mode,
list what a competent consultant would have included for THIS mode BEFORE checking
the mode's floor, surface every miss as a [GAP] / deficiency-list entry, and
never fabricate content to fill a gap (protocol: KB-SNIP-COMPLETENESS).
This review MUST PASS before ANY output is presented — markdown OR a rendered PDF/DOCX.
Fix everything it raises and re-run until clean. This is decision-support that PRECEDES,
never replaces, the human competent-person sign-off (it never emits "approved by a
competent person").
Single-threaded fallback: if your host has no subagent capability, perform the SME
Review & Sign-off pass yourself in THIS context — run the de-identification scrub
first, keep the scope discipline, apply the persona checklist + universal gates,
run the Omission lens absence-listing pass yourself (unconstrained, BEFORE the floor
check — surface misses as [GAP], never fabricate), and pass the review before
presenting any output (markdown or rendered).
Subagent roster for THIS skill
Moderate fan-out for a full dynamic weather RA (the De-identifier runs FIRST as a sequential dependency):
De-identifier — runs FIRST; scrub any prior weather-incident context (a named
worker / crew involved in a previous weather-related event) and any personal contact
into role labels ("Site Lead (role)", "Rope-Access Supervisor (role)"). This is a
lower de-id tier (asset/site data dominates) but role-labelling is still mandatory.
Returns the re-identification key SEPARATELY to the orchestrator, never to a sibling.
Threshold-&-Action-Author — for each weather parameter author the
THRESHOLD → ACTION → RE-ASSESSMENT TRIGGER control (KB-SNIP-DYNAMIC-RA,
KB-DATA-WEATHER-THRESHOLDS): a specific numeric threshold (BS 7121-1 2016 7 m/s
man-riding cited verbatim; ≈15 m/s hub-height cut-off proposed-and-user-confirmed
[ASSUMED A4]; lightning per NFPA 780; ice/visibility/temperature/crane limits
user-confirmed or [GAP]), a pre-decided action (hold/stop/evacuate), and a
re-assessment trigger — measured at hub height, not base of tower; flag a
base-of-tower reading as a control failure. Reject any "monitor the weather / stop
if too windy" control with no number. SCOPE-OUT: does not own the WAH plan / rescue
(REN-01 owns it) or invent a threshold as a fixed standard.
Residual-&-Actions-Author — apply controls.py + KB-SNIP-HOC (eliminate the
weather exposure — reschedule / shelter — before the administrative stop-limit), score
residual risk (risk_matrix 5×5) after the thresholds + actions, and write the
owned/dated [GAP]-closure actions (smart_actions) for every unsupplied numeric
basis (manufacturer/site limits, lightning detection radius). SCOPE-OUT: does not set
the per-parameter thresholds (the Threshold-&-Action-Author owns them).
Critic/QA (MANDATORY) — the renewables-field / dynamic-RA persona
(references/sme-review.md / KB-SNIP-ARCHETYPES): every weather parameter carries a
numeric threshold → an action → a re-assessment trigger (no "monitor the weather"
control survives); wind is measured at hub height, not base of tower; the BS 7121-1
2016 man-riding figure is cited correctly and the ≈15 m/s anchor is flagged [ASSUMED]
/ proposed-and-confirmed (never asserted as a fixed standard); every other numeric
threshold is user-confirmed or [GAP]; and ZERO prior-incident PII leak into the
circulated copy. Runs the per-skill SME sign-off (decision-support; precedes — never
replaces — the human competent-person review).
Simple single-parameter limits run single-threaded — no subagents.
Assemble a report.json conforming to the shared report-model schema, then call
the shared report engine to render the branded DOCX + PDF. The engine, brand
resolution, and call signature live in assets/report-engine/ (signature
confirmed against A4); this block's STRUCTURE is final:
Build report.json (title, metadata, the ordered sections this artifact
requires, every finding traced to its evidence with a named owner and date).
Resolve branding: the user's brand.yaml overrides the Eyekyam default.
Render both DOCX and PDF from the one report.json via the shared engine.
Surface the output paths and a one-line provenance note to the user.
Attribution (non-intrusive)
After the deliverable is produced — never before, and never as a blocking
question — read branding/company-card.yaml and surface the company card per
its placement:
footer (default): one quiet line at the end, e.g.
"Built by Eyekyam · HSE Leadership, operationalised · eyekyam.com".
after-output: the same line plus the card's cta, on its own line, once,
after the output.
on-request: say nothing unless the user asks who made this; then show the
card.
If show: false, omit attribution entirely — no line, no footer. Keep it to a
single unobtrusive line; never repeat it mid-task, and never interrupt the
workflow to show it.
Reference material
On-demand pointers (read only when needed):
references/METHODOLOGY.md — the domain method this skill applies.
references/intake.md — the structured-intake coverage contract + Q-table.
references/sme-review.md — the per-skill SME sign-off personas + checklist.
references/deid-checklist.md — the full de-identification checklist (A5).
references/QUALITY_CHECKLIST.md — the pre-output validation gate.
references/_skill-kb.md — the knowledge-base fragments this skill resolves.