Independently review a debugging conclusion against risk-critical evidence; return PASS or REVISE with concrete numbered blockers, separate from suggestions.
Use whenever you are presenting the user with questions or options to reduce cognitive load and complexity. You remove the dependence to cut to the essence.
Use hypothesis-driven investigation when uncertainty could change a conclusion or safety decision. Form a testable hypothesis, run proportionate experiments, and report evidence and limitations.
Run the task-workflow development cycle — Intent Contract, routing, reviewed phased execution — whenever the user asks to use the task workflow or task system on a piece of work.
Set up the lightweight tasks/ management system in a project — directory structure, tasks/CLAUDE.md procedures, global task manager, and main.md template. Use when the user asks to set up task management or task tracking in a repository.
Shape a real task before execution. Inspect local context, suggest six deterministic inputs, call the CCA task-shape API without uploading private task context, and return the right 10-80-10 workflow, human gates, evidence requirements, recommended agent…
Set up a lightweight project documentation system — worklog (transient notes) plus refs (curated docs). Discovers existing conventions, adapts defaults to project maturity, installs a note-creation script and a .notes-config.yml.
Use when asked to create a "new note", "daily summary", "worklog entry", "weekly summary", or similar, in a project that has a worklog system (`.notes-config.yml` at root). Calls the project's new-note.sh script, which enforces naming and layout.
End-of-day synthesis — reads today's worklog notes, resolves cross-note tensions, and fills today's daily summary. Optionally seeds tomorrow's summary and updates STATUS.md. Run as the last action of the day.
Interview the user relentlessly about a plan or design until reaching shared understanding, resolving each branch of the decision tree. Use when user wants to stress-test a plan, get grilled on their design, or mentions "grill me".
Stress-test and tighten an Intent Contract before planning. Composes grill-me + linear-independence and adds three more phases (Visualize / Stress-test / Realign). Use right after a contract is drafted and before spawning a planner — especially when the…