Skip to main content

gsd-resume-work

Resume work from previous session with full context restoration

معلومات المصدر

المستودع
davepoon/buildwithclaude
آخر نشاط في المصدر
٩ مايو ٢٠٢٦ في ٠٩:١٢
لغة SKILL.md المكتشفة
الإنجليزية
النجوم
٣٬٦٣٩
التفرعات
٦٠٥

خيارات التثبيت

يُحدَّد Prompt الذي يراجع المصدر أولًا بشكل افتراضي. يمكنك التبديل إلى أمر مباشر أو تنزيل نسخة محلية.

مراجعة ملفات المصدر

اقرأ SKILL.md وأي ملفات مرافقة يعرضها SkillsMP قبل أن تقرر التثبيت.

عرض SKILL.md

SKILL.md
تعليمات المصدر · معاينة للقراءة فقط
name
gsd:resume-work
description
Resume work from previous session with full context restoration
allowed-tools
["Read","Bash","Write","AskUserQuestion","SlashCommand"]
<objective> Restore complete project context from a previous session — handling both manual pause (from `/gsd:pause-work`) and auto-compact (from the PreCompact hook) handoffs identically. </objective> <process> 1. **Detect handoff state.** Check for `.planning/HANDOFF.json` via Read tool. If missing, the session has no handoff — announce "No handoff found" and proceed to normal `/gsd:progress` routing. 2. **Load STATE.md.** Read `.planning/STATE.md` to restore the big-picture project position. If missing, reconstruct from `.planning/ROADMAP.md` and the latest phase directory's SUMMARY.md files; if reconstruction fails, surface the error and stop. 3. **Read the handoff.** Parse `.planning/HANDOFF.json`. Extract phase, plan, task, status, source, uncommitted_files, decisions, context_notes, next_action. Per HANDOFF schema, all fields are always present (empty arrays / null for unset). 4. **Present project status.** Emit a compact status block covering: - Milestone + percent complete (from STATE.md frontmatter `progress.percent`). - Current phase name and number. - Plan / task position from the handoff. - Handoff source (manual-pause vs auto-compact) and timestamp. - Top 3 decisions and any blockers from the handoff. - Uncommitted files summary. - The `next_action` string verbatim — it's the resumption hint. 5. **Route to the next action.** Offer 1-3 concrete options based on handoff state. Common patterns: - If task was mid-execute: offer `/gsd:execute-phase` with the current phase. - If phase is at plan boundary: offer `/gsd:plan-phase` or `/gsd:execute-phase` for the next phase. - If there are uncommitted files that look in-progress: call attention to them before offering continuation. 6. **Clean up the handoff (LIFE-01).** After routing — once steps 1-5 have completed without error — remove the handoff file: ```bash node "${CLAUDE_PLUGIN_ROOT:-$HOME/.claude/plugins/cache/gsd-plugin/current}/bin/gsd-tools.cjs" checkpoint --clear ``` If the command is unavailable for any reason, fall back to direct removal: ```bash rm -f .planning/HANDOFF.json ``` Do not abort the resume if cleanup fails — it's hygiene, not correctness. The next session's SessionStart will overwrite a stale handoff anyway (per D-05 from Phase 4: latest snapshot wins). </process> <rules> - Step 6 runs **last**, after all context is loaded and the user has been shown status. A failed/aborted resume (steps 1-5 error out) leaves HANDOFF.json on disk for recovery (per D-08). - If `HANDOFF.json` is absent in step 1, skip everything — don't attempt to clean up what isn't there. `checkpoint --clear` is idempotent but unnecessary work. - The skill is the single owner of HANDOFF.json deletion. The SessionStart hook must NOT delete — it only detects (per D-10). </rules>
عرض على GitHub