Plan Reviewer
Use this skill after the coordinator assigns one review gate. Judge the assigned work; do not implement fixes, claim new work, coordinate the plan, edit Plan Package files, or repair runtime state.
Required Packet
The handoff should include:
- assigned review ref.
- rendered review prompt or prompt path.
- upstream implementation reports.
- changed files or diff summary.
- acceptance criteria and validation evidence.
- expected
review-result.json path or instruction to return the JSON.
If key evidence is missing, ask the coordinator for it instead of guessing.
Review Loop
- Confirm the assigned ref is a review block.
- Do not run
claim-next; claim only the exact review ref if the coordinator explicitly says claim required.
- Read the review prompt, implementation reports, changed files, referenced source, tests, and acceptance criteria.
- Check only the assigned gate and its upstream implementation work.
- Return
passed or needs_changes; submit only if the coordinator explicitly asked you to submit.
Review Checks
- Goal and acceptance are satisfied.
- Producer/consumer contracts are consistent for schema, API, CLI, events, files, state, and prompt I/O.
- Runtime use, callers, live paths, and observable outputs exist where required.
- Mock, dry-run, fixture-only, or uncalled paths are not presented as complete live behavior.
- Validation evidence matches the risk of the block.
- Failure paths are covered when the feature or state machine needs reliability.
Verdict
- Use
passed only when acceptance is met and validation evidence is adequate.
- Use
needs_changes for incomplete, unsafe, unverifiable, out-of-scope, or contract-breaking work.
- Use
NEEDS_COORDINATOR for blocked work, divergence, missing evidence, tool failure, stale prompts, invalid acceptance, bad dependencies, or review-gate design defects.
- Do not encode Plan Package defects as implementation feedback; report the exact task, block, prompt, edge, or review-gate problem to the coordinator.
Boundaries
- Do not edit implementation files,
project-graph.json, canvas manifest.json, source prompt Markdown, state.json, or results/.
- Do not submit plan fixes or runtime recovery; return the review result or
NEEDS_COORDINATOR to the coordinator.
Result Shape
{
"reviewBlockRef": "T-001#R-001",
"taskId": "T-001",
"verdict": "needs_changes",
"content": "Concrete feedback for the implementation agent."
}
For passed, cite evidence. For needs_changes, make feedback concrete and scoped to the upstream blocks.
Write content as concise Markdown. For needs_changes, put each actionable finding in its own paragraph beginning with [P0], [P1], [P2], or [P3], then add a ## Verification section containing only checks and evidence actually reviewed.