| name | codexkit-risk-register |
| description | Build and maintain a project Risk Register per PMBOK 8 Risk Performance Domain. Identify risks, assess probability and impact, define response strategies, and track residual risk. Use throughout the project lifecycle — not just at planning. Do not use for operational incident response or security vulnerability scanning. |
| version | 1.0.0 |
| category | infra |
Risk Register Manager
Purpose
Systematically identify, assess, and manage project risks using a structured register with probability/impact scoring and defined response strategies.
When to use
- project kick-off to establish the initial risk baseline
- sprint or milestone reviews to update and add emerging risks
- before major decisions to assess risk exposure
- when stakeholders request a risk assessment report
When not to use
- live incident response or post-mortem analysis
- security vulnerability scanning (use security tools)
- personal task risk assessment
Inputs
- project scope, objectives, and constraints
- project type (predictive / adaptive / hybrid)
- stakeholder list and their risk tolerance
- known assumptions and dependencies
- lessons learned from similar projects (if available)
Procedure
- Identify risks using multiple sources:
- Internal: technical complexity, resource gaps, schedule pressure, budget
- External: market shifts, regulatory changes, vendor reliability, geopolitical
- PMBOK 8 emphasis: sustainability risks (ESG, climate, social impact)
- Techniques: brainstorming, PESTLE analysis, Risk Breakdown Structure (RBS)
- Assess each risk qualitatively:
- Probability: Very Low (0.1) / Low (0.3) / Medium (0.5) / High (0.7) / Very High (0.9)
- Impact: Very Low (0.05) / Low (0.1) / Medium (0.2) / High (0.4) / Very High (0.8)
- Risk Score = Probability × Impact
- Red zone (≥ 0.25): immediate response required
- Yellow zone: response plan needed
- Green zone: monitor only
- Define response strategy:
- For threats: Avoid / Transfer / Mitigate / Accept (active or passive)
- For opportunities: Exploit / Share / Enhance / Accept
- Assign ownership — every risk has one named owner.
- Track residual risk — after response, re-score to verify reduction.
- SAFe integration — for SAFe teams, use ROAM board:
- R = Resolved | O = Owned | A = Accepted | M = Mitigated
Output
- risk register table: ID | Category | Description | Trigger | Probability | Impact | Score | Owner | Response Strategy | Residual Risk | Status
- risk heat map summary (red/yellow/green distribution)
- top 10 risks with detailed response plans
- escalation list for sponsor or steering committee
- risk trend over time (risk burn-down if tracked across sprints)
Definition of done
- every identified risk has a probability, impact, and score
- every red/yellow risk has a named owner and defined response strategy
- residual risk is assessed for all mitigated risks
- register is reviewable by stakeholders
Examples
- "Build an initial risk register for a 6-month ERP migration project."
- "Update the risk register after Sprint 5 — add 3 new risks we discovered."
- "We have 15 risks but no response plans. Help me define strategies for the top 10."
Quality Criteria
Verification (4C)
| Check | Question |
|---|
| Correctness | Are all configurations, permissions, and dependencies accurate? |
| Completeness | Does the setup cover dev, staging, and prod environments as needed? |
| Context-fit | Is the solution proportional to the problem (not over/under-engineered)? |
| Consequence | If deployed as-is to production, what is the highest-risk failure mode? |
Edge Cases
- Target environment has pre-existing configuration — Scan for conflicts before applying changes. Document what to preserve.
- Permissions differ between environments — Test in staging first. Document the minimum permissions required.
- Third-party service is unavailable or deprecated — Document fallback or alternative. Include health-check endpoints.