بنقرة واحدة
cf-calendar
Plan content calendars with scheduling, deadlines, team assignments, and Google Calendar sync.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
القائمة
Plan content calendars with scheduling, deadlines, team assignments, and Google Calendar sync.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
استنادا إلى تصنيف SOC المهني
| name | cf-calendar |
| description | Plan content calendars with scheduling, deadlines, team assignments, and Google Calendar sync. |
| argument-hint | [month or quarter] |
| effort | low |
Plan and manage content production calendars with intelligent scheduling, deadline tracking, team assignments, and optional Google Calendar event creation. The calendar works backward from publish dates to calculate production start times, identifies bottlenecks, and generates a visual text-based Gantt chart timeline.
Use /contentforge:cf-calendar when:
For producing content, use /contentforge:create-content or /contentforge:batch-process.
For auditing what needs refreshing, use /contentforge:cf-audit first to identify candidates.
Minimum Required:
Content Plan Input Formats:
Manual Input (Interactive):
Topic: AI in Healthcare Trends 2026
Type: article
Publish Date: 2026-03-15
Priority: 1
Google Sheets:
Sheet with columns: title, content_type, publish_date, priority, brand, assigned_to (optional)
Array (Quick Mode):
--topics="AI Healthcare Trends:article:2026-03-15:1, CRM for Startups:blog:2026-03-18:2, HIPAA Guide:whitepaper:2026-03-25:1"
Optional:
--team="Alice,Bob,Carol")daily, weekly (default), biweekly/contentforge:cf-calendar
Prompts you for:
/contentforge:cf-calendar --period=60 --sheet=https://docs.google.com/spreadsheets/d/ABC123 --cadence=weekly --team="Alice,Bob"
/contentforge:cf-calendar --period=30 --topics="AI Healthcare:article:2026-03-15:1, CRM Guide:blog:2026-03-20:2" --cadence=weekly
/contentforge:cf-calendar --period=90 --from-audit=latest --cadence=biweekly
Pulls the top refresh and new content recommendations from the most recent /contentforge:cf-audit output and schedules them.
Import and validate the content plan.
Validation Checks:
If publish dates are not provided (using cadence mode):
Example:
Content Plan Loaded
================================================================
Time Period: 2026-02-25 to 2026-04-25 (60 days)
Total Pieces: 12
Cadence: Weekly (Tuesdays and Thursdays)
Pieces by Type:
Articles: 5
Blogs: 4
Whitepapers: 2
FAQs: 1
Pieces by Priority:
Priority 1 (Urgent): 3
Priority 2 (High): 5
Priority 3 (Normal): 4
================================================================
Work backward from each publish date to determine production windows.
Production Lead-Time Planning Defaults (rough planning values — adjust to your own observed times; actual pipeline duration varies by topic complexity and model speed):
Content Type Production Time Review Buffer Total Lead Time
─────────────────────────────────────────────────────────────────
Article 25 min 24 hours ~1.5 days
Blog 18 min 24 hours ~1.5 days
Whitepaper 35 min 48 hours ~2.5 days
FAQ 15 min 24 hours ~1.5 days
Research Paper 60 min 72 hours ~3.5 days
Timeline Calculation:
For each piece:
Publish Date: [specified or auto-assigned]
Review Deadline: Publish Date - Review Buffer
Production End: Review Deadline - 1 hour (buffer for output generation)
Production Start: Production End - Production Time
Brief Due: Production Start - 24 hours (if brief needed)
Example Timeline for One Piece:
"AI Healthcare Trends 2026" (Article, Priority 1)
Brief Due: 2026-03-13 09:00 AM
Production Start: 2026-03-14 09:00 AM
Production End: 2026-03-14 09:30 AM
Review Deadline: 2026-03-15 09:00 AM
Publish Date: 2026-03-15 10:00 AM
If team members are specified, distribute pieces across the team with workload balancing.
Assignment Logic:
Example:
Team Assignments
================================================================
Alice (5 pieces):
Week 1: AI Healthcare Trends (article), CRM Guide (blog)
Week 2: HIPAA Compliance (whitepaper)
Week 3: Patient Engagement (article)
Week 4: Data Security FAQ (faq)
Bob (4 pieces):
Week 1: Telemedicine ROI (article)
Week 2: Remote Monitoring (blog), Digital Health (blog)
Week 3: EHR Integration (article)
Carol (3 pieces):
Week 1: Value-Based Care (whitepaper)
Week 2: Clinical AI (article)
Week 3: API Integration (blog)
Workload Balance: Alice 5 | Bob 4 | Carol 3 (balanced within 2)
================================================================
Identify scheduling bottlenecks.
Conflicts Detected:
Example Conflicts:
Scheduling Conflicts Detected
================================================================
WARNING: March 14 — 3 pieces scheduled for production
AI Healthcare Trends (Alice), Telemedicine ROI (Bob), Value-Based Care (Carol)
Risk: All 3 need review on March 15 (review pile-up)
Suggestion: Move "Value-Based Care" production to March 12
(whitepaper needs 48h review buffer anyway)
WARNING: March 25 — 2 pieces publishing same day
HIPAA Compliance (whitepaper) and EHR Integration (article)
Risk: Audience email fatigue if both go to same list
Suggestion: Move EHR Integration to March 27
Auto-resolved: 1 conflict
Moved "Value-Based Care" production to March 12 (accepted suggestion)
Remaining: 1 conflict requires manual decision
March 25 publish cluster — choose which piece to move
================================================================
If Google Calendar MCP is connected, create calendar events for each milestone.
Events Created Per Piece:
Event Details:
--calendar="Content Team")Without Google Calendar MCP: Calendar events are skipped. The visual timeline is still generated.
Generate a text-based Gantt chart showing the complete calendar.
Example:
Content Calendar: 2026-02-25 to 2026-04-25 (60 Days)
================================================================
Week 1 (Feb 25 - Mar 3)
Mon Tue Wed Thu Fri Sat Sun
25 26 27 28 1 2 3
──── ──── ──── ──── ──── ──── ────
[B] [P]
AI Healthcare AI Healthcare
>>>>>>>>>>>>>>>>[R][PUBLISH]
[B] = Brief Due [P] = Production [R] = Review
Week 2 (Mar 4 - Mar 10)
Mon Tue Wed Thu Fri Sat Sun
4 5 6 7 8 9 10
──── ──── ──── ──── ──── ──── ────
[B] [P] [R] [PUB]
CRM Guide >>>>>>>>>[PUBLISH]
[P] [R] [PUB]
Tele ROI >>>>>>[PUBLISH]
... (continues for all weeks)
================================================================
Summary:
Total Pieces: 12
Publishing Dates: 12 dates across 8 weeks
Production Days: 14 unique days with scheduled work
Team Coverage: Alice (5), Bob (4), Carol (3)
Calendar Events Created: 48 (4 per piece x 12 pieces)
Conflicts Resolved: 1 auto, 1 manual pending
================================================================
The complete content calendar includes:
| Section | Description |
|---|---|
| Plan Summary | Total pieces, time period, cadence, team members |
| Production Timeline | Start/end/review/publish dates per piece |
| Team Assignments | Workload distribution with weekly breakdown |
| Conflict Report | Identified bottlenecks with resolution suggestions |
| Gantt Chart | Visual text-based timeline of all production activity |
| Calendar Events | Status of Google Calendar event creation (if connected) |
| Deadline Alerts | Upcoming deadlines for the next 7 days |
Content Calendar Created
================================================================
Period: 60 days (2026-02-25 to 2026-04-25)
Pieces: 12 pieces across 8 weeks
Cadence: Weekly (Tuesdays and Thursdays)
Team: Alice (5), Bob (4), Carol (3)
Production Schedule:
This Week: 2 pieces starting production
Next Week: 3 pieces starting production
Week 3-4: 4 pieces
Week 5-8: 3 pieces
Calendar Events: 48 events created in "Content Team" calendar
Conflicts: 1 auto-resolved, 1 pending manual decision
Next Deadline: "AI Healthcare Trends" brief due Feb 27, 9:00 AM (Alice)
================================================================
Without MCP connections, the calendar provides a complete text-based timeline with production dates, team assignments, and conflict detection. Events can be manually added to any calendar application using the dates from the timeline.
Solution: By default, publish dates are assigned to weekdays only. Use --include-weekends to allow weekend publishing.
Cause: More pieces than team members can handle in the time period. Solution: Extend the time period, add team members, or reduce the number of pieces. The calendar will warn you during conflict detection.
Cause: Google Calendar MCP not connected or authorization not granted.
Solution: Run /contentforge:cf-integrations to check Google Calendar status. Run /contentforge:cf-connect google-calendar for setup instructions.
Cause: Publish dates are too close together for the number of pieces.
Solution: Increase the review buffer (--review-buffer=48) or spread publish dates further apart. Whitepapers and research papers need longer lead times.
None. This skill uses deterministic scheduling logic (backward timeline calculation, workload balancing, conflict detection) without agent-based reasoning.
Agent: None (deterministic scheduling) MCP: Google Calendar (optional, HTTP), Google Sheets (optional, npx) Output: Content calendar with timeline, assignments, conflict report, and optional calendar events
Process multiple content pieces through a prioritized, checkpointed queue with progress tracking and per-piece quality gates
Add a custom MCP connector — connect any API or service to ContentForge via .mcp.json configuration.
Track content quality scores, pipeline timing, and compliance trends with insights and alerts.
Audit content library for freshness decay, coverage gaps, and optimization opportunities.
Generate research-backed content briefs with keywords, competitors, intent, and SEO strategy from a topic.
Set up an MCP connector with step-by-step instructions. Use to connect Notion, Canva, Webflow, etc.