| description | Use when the team needs to align on what worked, or when the user says "retro", "what did we learn", "post-mortem" — at the end of a project, sprint, or feature, before the next kickoff. Triggers: "retro", "post-mortem", "what did we learn", "what would we do differently", "what's still open", "the project is done — what stuck", "what's the 3-line takeaway". |
Retro — Project Retrospective
A retro is not a status meeting. A retro is a learning meeting. The output is "what should we do differently next time," not "what did we do."
When to run
- At the end of a project / sprint / feature.
- After a launch.
- After a near-miss, an incident, or a major rework.
- When the team is about to start something similar and should learn from the last one.
The 6 sections
1. What we set out to do
One paragraph. The original goal as understood at kickoff. Quote the kickoff doc / commitment if you have one — the drift between "what we said" and "what we did" is itself a finding.
2. What we actually did
Bullet list, not narrative. The artefacts: features shipped, files changed, integrations cut, scope dropped. The deltas from the plan are the data, not the work itself.
3. What changed about the plan
Bullet list. For each change: what was changed, when, and why. Then the harder question: was the change forced by reality (good) or forced by drift (bad)?
4. What we got right
Don't skip this. Every retro that only lists failures produces team demoralisation and false humility. List the things that worked — the design choice, the early decision, the test, the conversation that unblocked something. Name them so they can be repeated.
5. What we'd do differently
The most important section. Be specific:
- "Next time, write the smoke test before the integration code."
- "Next time, push back on the requirement to support X on day one."
- "Next time, name the kill signal in the kickoff doc."
Not: "We should communicate better." That's a wish, not a finding.
6. What's still open
The deferred items. The things we know aren't done. For each: the consequence of not doing it, the cost of doing it later, and the trigger that should re-open the conversation.
Output format
RETRO: <project name>
DATES: <start → end>
OUTCOME: <shipped / cut / re-scoped / failed>
PLAN VS REAL: <1 paragraph>
DELTAS: <bulleted, with forced-by-reality / forced-by-drift tag>
KEPT: <what we got right>
CHANGES: <what we'd do differently — 3-5 specific actions>
OPEN: <deferred items + consequence + trigger>
The kept and changes sections together are the learning. Everything else is context.
Hard rules
- Blameless. Bad retros blame people. Good retros blame the decision (which is recoverable), the missing information (which is fixable), or the environment (which is changeable).
- Concrete. "We should test more" is not an action. "Add the smoke test to CI on day 2 of next project" is.
- Capped. A retro that runs 2 hours is a status meeting. A retro that runs 30 minutes is a retro. Time-box ruthlessly.
- Owned. Every "change" gets an owner. If no one owns it, it's a wish.
Companion skills
gbrain-eiirp — the post-work organiser. Run before the retro; the retro consumes its output.
gstack-plan-ceo-review — measure the project outcome against the original CEO scorecard.