| description | Design the complete work hierarchy for a Paperclip company — Goals, Projects, and Tasks as a unified top-down planning workflow. Produces ._planning.json for deterministic generation of goals/, projects/, and tasks/ directories. Use when creating a new company's work plan, reorganizing work structure, or linking goals to projects and tasks.
|
Work Planning Skill
This skill designs the full work hierarchy for a Paperclip company following the Agent Companies specification (agentcompanies/v1). Work flows top-down: Goal (Initiative) → Projects → Issues/Tasks → Sub-issues.
Every piece of work in the company traces back to a goal. This skill produces a single ._planning.json file consumed by generate-plan.sh to create all goals/, projects/, and tasks/ directories deterministically.
When to Use
- Creating a new company (called from
/company Phases 2-3)
- Reorganizing or extending goals, projects, or tasks for an existing company
- Linking goals to projects and tasks
- User asks to "plan work", "define goals", "create projects", or "organize tasks"
Step 1: Goal Design
Goals are the strategic direction layer. They define what success looks like.
Goal Quality Bar
- 2-5 company goals — fewer is better if they're precise
- Each goal must be specific to this business (not generic like "grow revenue")
- Goals must be measurable or verifiable (e.g., "Launch a public API with 3+ endpoints")
- Include a mix of product, growth, and operational goals
Goal Fields
| Field | Required | Description |
|---|
slug | Yes | Kebab-case, becomes folder name |
title | Yes | The goal statement |
description | Yes | Concrete deliverables or success criteria |
level | No | company, team, agent, or task (auto-assigned by depth) |
status | No | planned, active, achieved, cancelled (default: active) |
ownerAgentSlug | Optional | Agent slug responsible for driving this goal (assigned after org design) |
projectSlugs | Recommended | Projects that deliver on this goal |
Building the Hierarchy
After confirming top-level goals, break each into subgoals:
- Subgoals — 1-3 team-level workstreams per company goal. Every subgoal must include a
description.
- Ownership — can be deferred to an assignment step after org design. When assigning: company goals → C-level agents, subgoals → team leads or ICs.
- Project linkage — connect each goal/subgoal to the projects that deliver on it.
- Depth — 2 levels of nesting is usually enough. Max 4 levels.
Checkpoint: Present goals to the user and confirm before proceeding to Step 2.
Step 2: Project Design
Projects group related work under a clear owner. Each project links to one or more goals.
Project Scoping
| Scenario | Where it goes |
|---|
| 3+ related tasks with shared theme and natural owner | Project — projects/{slug}/ |
| One-off strategic directive from CEO | Company-level task — tasks/ |
| Cross-cutting work spanning multiple domains | Company-level task — assigned to CEO |
| Ongoing operational work (reviews, reporting) | Project task with recurring: true — MUST be inside a project |
Rule of thumb: if 3+ tasks share a theme and a natural owner, they belong in a project.
Project Fields
| Field | Required | Description |
|---|
slug | Yes | Kebab-case, must match folder name |
name | Yes | Human-readable project name |
description | Yes | One-line summary of what the project delivers |
owner | Optional | Agent slug of the project owner (assigned after org design) |
The project body should include ## Scope and ## Success Criteria sections.
Scoping Guidelines
- 1-3 projects for a new company, more for larger orgs
- 3-8 tasks per project — fewer means too narrow, more means consider splitting
- Good names describe outcomes (
mvp-launch, api-v2), not activities (backend-work)
- Every project slug must appear in at least one goal's
projectSlugs
Owner Selection
| Project Type | Typical Owner |
|---|
| Engineering / product build | CTO or lead engineer |
| Marketing campaign | CMO or content lead |
| Infrastructure / DevOps | CTO or DevOps engineer |
| Cross-functional initiative | CEO or PM |
Step 3: Task Design
Tasks are the concrete work items. They live either under projects or at the company level.
Task Ordering Convention
Tasks are imported in alphabetical order by directory name. IDs are assigned sequentially. To control import order, prefix task directory names with a two-digit number.
Numbering must be globally unique across the entire company package. Do not restart numbering per project — continue the sequence across all task locations:
projects/backend/tasks/
├── 01-setup-infrastructure/TASK.md
├── 02-build-auth/TASK.md
projects/frontend/tasks/
├── 03-design-ui/TASK.md
├── 04-build-components/TASK.md
tasks/
├── 05-strategic-review/TASK.md
├── 06-weekly-standup/TASK.md
Without numeric prefixes, tasks sort alphabetically by slug, which may not reflect intended execution order.
Note: generate-plan.sh assigns global ordering automatically — the order field in ._planning.json is ignored. The script numbers tasks sequentially: all project tasks first (in project key order), then company-level tasks.
Task Fields
| Field | Required | Description |
|---|
name | Yes | Human-readable task name |
assignee | Optional | Agent slug (assigned after org design, required before generation) |
project | Yes (project tasks + all recurring tasks) | Parent project slug |
priority | Yes | critical, high, medium, or low — choose based on actual importance, not every task is medium. Infrastructure setup and blocking work should be high or critical; nice-to-haves and research tasks should be low. |
recurring | No | true for ongoing work — task MUST be inside a project |
Task Organization Rules
- Every project task lives at
projects/{project-slug}/tasks/{NN-task-slug}/TASK.md
- Every project task has
project: {project-slug} in frontmatter
- Company-level tasks live at
tasks/{NN-slug}/TASK.md — one-off CEO strategic directives only
- Recurring tasks MUST NEVER be company-level. They must always live inside a project (
projects/{slug}/tasks/). Recurring tasks become Routines, and Routines require a project. If no existing project fits, create a dedicated project (e.g. operations, company-rituals).
- Aim for 3-8 tasks per project
- Task assignees can differ from the project owner
- Task slugs describe the deliverable (
setup-auth, build-landing-page)
- All referenced
assignee agent slugs must exist in agents/
Step 4: Produce ._planning.json
After the user confirms goals, projects, and tasks, write a ._planning.json file in the company root with this structure:
{
"goals": [
{
"slug": "launch-mvp",
"title": "Launch MVP web application",
"description": "Ship a functional product users can sign up for and use daily",
"level": "company",
"status": "active",
"ownerAgentSlug": "cto",
"projectSlugs": ["mvp-backend", "mvp-frontend"],
"subgoals": [
{
"slug": "build-auth-system",
"title": "Build authentication and user management",
"description": "Implement email/password and OAuth sign-up, session management, and RBAC",
"level"
Then run the generation script:
bash ../../scripts/generate-plan.sh <company-root> <company-root>/._planning.json
This creates all goals/, projects/, and tasks/ directories with proper frontmatter, ordering prefixes, and cross-references.
Cross-Level Consistency Checks
Before producing ._planning.json, verify:
Required before generation (can be deferred during initial planning):
Common Planning Patterns
| Business Type | Goals | Projects | Task Examples |
|---|
| SaaS MVP | Launch product, acquire users, build pipeline | mvp-launch, marketing-site, ci-cd-setup | Auth, core features, landing page, CI pipeline |
| E-commerce | Launch store, scale inventory, payment flow | storefront, inventory-system, payment-integration | Product catalog, checkout, Stripe setup |
| Content platform | Launch CMS, grow audience, track metrics | content-engine, distribution, analytics | CMS setup, social posting, dashboard |
| Agency | Client portal, delivery pipeline, marketing | client-portal, delivery-pipeline, marketing | Project tracker, automation, outreach |