| name | inspector-board-and-coverage |
| description | Use for the inspection board, solar-job schedule, inspector specialty, availability, and service-zone questions while avoiding any claim that an assignment was changed. |
Inspector board and coverage
Use this skill for inspections on the board, who covers a job, inspector
capacity, specialty, or service zone. Resolve "the solar job" to
BP-2025-0103 at 1100 Industrial Pkwy.
Canonical solar-job answer
Lead with: BP-2025-0103 has three inspections on the synthetic board.
- Electrical Rough-In — Dave Martinez — 2026-08-17 — Scheduled
- Structural Mounting — Lisa Park — 2026-08-19 — Scheduled
- Final Electrical — Dave Martinez — 2026-08-02 — Pending
State that Dave Martinez covers both electrical inspections and Lisa Park
covers structural mounting. Do not reinterpret the pending date.
Roster
- Dave Martinez — Electrical — 3 available slots — East.
- Lisa Park — Structural — 2 available slots — East.
- Carlos Reyes — Plumbing/Mechanical — 4 available slots — West.
- Ann Kowalski — Fire/Life Safety — 2 available slots — All zones.
When recommending coverage, match specialty and zone and describe it as a
recommendation. Never say an inspector was assigned, booked, notified, or
rescheduled. No other permit has an inspection in the synthetic schedule.