| name | shep-workstreams |
| description | Use when a large body of work (a version milestone, an epic, a roadmap, a set of PRDs/design docs) needs to be broken into parallel workstreams and executed with the shep CLI. Triggers include "break this down", "split into workstreams", "plan V6", "what should we build first", "run these in parallel", "dependency graph", "merge order", "worktree split", or any request to turn planning docs into running shep features. Produces a workstream plan first, then drives `shep feat new` / `shep feat start` wave by wave. Part of the Shep autonomous SDLC platform — https://shep.bot |
| metadata | {"version":"1.0.0","author":"Shep AI (https://shep.bot)","homepage":"https://shep.bot","repository":"https://github.com/shep-ai/shep"} |
Workstream Breakdown & Parallel Execution with Shep
Turn a large, vague body of work into a small set of parallel workstreams, then execute
each one as an isolated shep feature. One workstream = one feature = one worktree = one agent.
The rule this skill exists to enforce
Never tell an agent "work on all of it." That produces context loss, jumping between
unrelated tasks, dozens of touched files, giant commits, and merge conflicts.
Act like a tech lead: partition first, then run one focused agent per partition.
Two phases, hard separated
PHASE 1 — PLAN PHASE 2 — EXECUTE
(read-only, no shep (shep feat new / start,
mutations, produces wave by wave, monitored)
WORKSTREAMS.md)
Do not create a single feature until Phase 1 is written down and the user has approved it.
The plan is cheap. Rework across six half-merged branches is not.
Phase 1 — Produce the workstream plan
Step 1: Read every source doc, in full
Read all the input material (PRDs, design docs, roadmap, existing specs, issue lists) before
writing anything. Then inventory the deliverables — not the docs, the actual things that
must exist when this is done.
Step 2: Answer the five tech-lead questions
Answer these explicitly in the plan. They are the whole point of the exercise:
- What is on the critical path? Which deliverables block everything else, and which are
genuinely independent?
- What does the dependency graph look like? Which files and components are shared between
deliverables? Which subtrees are touched by exactly one deliverable?
- What is the right worktree split? Group deliverables into the smallest set of parallel
branches that minimises merge conflicts. Estimate merge risk for each.
- What are the integration milestones? Replace "finish V6" with contract-level checkpoints
("backend contract frozen", "design system frozen", "CRUD complete", "QA").
- Which decisions are irreversible? What should be decided now because changing it later
is expensive — and what should be deliberately delayed behind a flag?
Step 3: Partition on file ownership, not on feature semantics
This is the single highest-leverage rule, and the one most often gotten wrong:
Two deliverables that both edit the same file belong in the same workstream,
no matter how unrelated they sound. Two deliverables that touch disjoint subtrees belong in
different workstreams, no matter how related they sound.
For the full partitioning rubric — the foundation-first rule, ship-the-small-thing-first rule,
merge-risk scoring, concurrency caps, and the common failure modes — read
references/partitioning.md.
Step 4: Write WORKSTREAMS.md
Use templates/workstream-plan.md. Every workstream gets, without exception:
| Field | Meaning |
|---|
scope | What is in it — and an explicit not in scope line |
blocked_by / blocks | Edges of the dependency graph, by workstream id |
expected_files | Globs. If two workstreams share a glob, one of them is mis-cut |
merge_risk | Low / Medium / High, with the reason |
branch | Recommended branch name |
completion_criteria | Observable, checkable — not "done" |
shep_command | The exact shep feat new invocation that starts it |
Then add, at the plan level: the merge order, the integration milestones, the
irreversible decisions, and any work that should be pulled earlier into the current
release (small, high-impact, zero-dependency items usually should be).
Step 5: Stop and get approval
Present the plan. Ask specifically about: the workstream count, the merge order, and anything
recommended for pull-forward. Do not proceed to Phase 2 unapproved.
Phase 2 — Execute with the shep CLI
The mechanics that matter
Shep already does worktree-per-workstream. Do not hand-roll git worktree add.
shep feat new "<description>" creates a branch and an isolated worktree off the repo's
default branch, then spawns an agent in it.
--pending creates the feature without spawning. shep feat start <id> spawns it later.
This is how you stage waves.
--parent <feature-id> records a real dependency. The child starts Blocked. When the parent
reaches Implementation, Review, or Maintain, shep automatically rebases the child's
branch onto the parent's branch and spawns its agent. Only direct children unblock — a
chain A → B → C cascades one link at a time, which is what you want.
--attach <path> is repeatable. Attach the source PRDs/design docs to every feature so each
agent has the context without you pasting it.
Full flag reference, monitoring commands, and the PM/work-item commands are in
references/cli-reference.md. Read it before composing commands.
Step 1: Encode the graph, do not improvise it
Create features in dependency order so --parent ids exist when you need them.
shep feat new "Foundation: shared types, API contracts, routing, feature flags, design tokens" \
--repo /path/to/project \
--attach docs/v6-overview.md --attach docs/v6-api.md \
--push --pr
shep feat new "Creator storefront: creator page, claim flow, generated profile" \
--repo /path/to/project --parent <foundation-id> \
--attach docs/v6-storefront.md --push --pr
shep feat new "Listings: listing page, CRUD, publish flow, ownership badges" \
--repo /path/to/project --parent <foundation-id> \
--attach docs/v6-listings.md --push --pr
shep feat new "Attribution: deep links, ?via= params, tracking, creator analytics" \
--repo /path/to/project --attach docs/v6-attribution.md --push --pr
shep feat new "Collections: object model, relationships, recommendation surfaces" \
--repo /path/to/project --parent <foundation-id> --pending
shep feat start <collections-id>
Step 2: Choose the dependency mechanism deliberately
| Situation | Use |
|---|
| B needs A's code | --parent <A> — auto-rebase onto A's branch, auto-start |
| B is independent but you lack review capacity now | --pending, then shep feat start |
| B is independent and you have capacity | plain shep feat new — run it now |
| B and A edit the same files | Not two workstreams. Merge them into one feature |
--parent is not a substitute for good partitioning. If everything is a child of everything,
you have built a sequential pipeline with extra steps.
Step 3: Respect the concurrency cap
Run at most as many in-flight features as you have disjoint file sets — and no more than you
can actually review. Six agents producing six unreviewed PRs is not parallelism, it is a queue
with a worse failure mode. Stage the rest with --pending.
Step 4: Monitor and drive to merge order
shep feat ls
shep feat show <id>
shep feat logs <id>
shep feat approve <id>
shep feat reject <id>
shep feat resume <id>
Merge in the plan's stated order. After each merge, re-check shep feat ls — a parent reaching
Implementation will have unblocked its children automatically, and their rebases may have
surfaced conflicts worth looking at before the next wave.
Step 5: Track the graph as work items (optional, for larger efforts)
When the effort is big enough that the plan needs to outlive the terminal session, mirror it in
shep's PM layer — shep project new, shep item new, shep item relate --type blocking,
shep cycle new, shep cycle add-items. See references/cli-reference.md.
Anti-patterns — reject these when you see them
- One mega-feature. "Implement V6" is not a workstream. If the description needs the word
"and" three times, split it.
- Workstreams cut along team or doc boundaries. Cut along file boundaries. The doc
structure has no idea what shares a schema file.
- Everything parented to everything. That is a sequential pipeline. Find the genuinely
independent slice and run it now.
- Foundation that keeps growing. Foundation is contracts, types, routing, flags, tokens —
and nothing else. The moment it grows a UI, it stops being mergeable and blocks five streams.
- Deferring the small high-impact slice. If something is small, near-zero-dependency, and
valuable, ship it first. It validates the pipeline end to end while foundation is in flight.
- Hand-rolled
git worktree add alongside shep features. Shep owns the worktrees. Mixing
the two loses tracking, gates, auto-rebase, and unblocking.