compute-velocity
Computes team velocity over multiple sprints using story points or task count, with trend analysis.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
القائمة
Computes team velocity over multiple sprints using story points or task count, with trend analysis.
التثبيت باستخدام Codex أو Claude انسخ هذا Prompt والصقه في Codex أو Claude أو مساعد آخر ليراجع صفحة Skill ويثبّتها لك.
استنادا إلى تصنيف SOC المهني
| name | compute-velocity |
| version | 1.0.0 |
| description | Computes team velocity over multiple sprints using story points or task count, with trend analysis. |
| category | sprint-operations |
| trigger | Sprint review, capacity planning, forecasting, sprint health check. |
| autonomy | autonomous |
| portability | universal |
| complexity | basic |
| type | computation |
| inputs | [{"name":"sprint_history","type":"structured-text","required":true,"description":"Data for 2+ completed sprints. Per sprint: name, committed story points, completed story points, sprint dates. Optionally: completed task count.\n"},{"name":"current_sprint","type":"structured-text","required":false,"description":"Current sprint progress: committed SP, completed SP so far, days elapsed, days remaining.\n"}] |
| outputs | [{"name":"velocity_report","type":"structured-text","description":"Average velocity, sprint-over-sprint trend, predictability score, completion ratio, and forecast for current sprint.\n"}] |
| model_compatibility | ["claude","gpt-4","gemini","llama-3"] |
Calculate team velocity across sprints, identify trends, assess predictability, and forecast current sprint completion.
For each completed sprint:
If story points are unavailable, fall back to completed task count. Note the metric used.
Compare the last 3 sprints:
| Pattern | Trend | Signal |
|---|---|---|
| Each sprint higher than previous | Improving | Team ramping up, process maturing, or scope inflation |
| Each sprint lower than previous | Declining | Capacity loss, increasing complexity, or morale issues |
| Fluctuating (+/- 20%) | Volatile | Estimation inconsistency, variable scope, or team instability |
| Within +/- 10% band | Stable | Healthy, predictable team |
Predictability score = 1 - (standard deviation / average velocity)
| Score | Rating |
|---|---|
| > 0.85 | High — team delivers consistently |
| 0.70 - 0.85 | Medium — some variability, plan with buffer |
| < 0.70 | Low — high variability, commitments are unreliable |
Note: Linear projection is a simplification. Sprint work is typically back-loaded. Adjust interpretation accordingly — a 60% trajectory on Day 3 is less concerning than on Day 8.
Provide one concrete observation based on the data. Examples:
## Velocity Report
**Average velocity**: {weighted_avg} SP (simple avg: {simple_avg} SP)
**Trend**: {Improving|Declining|Volatile|Stable}
**Predictability**: {score} ({High|Medium|Low})
### Sprint-over-Sprint
| Sprint | Committed | Completed | Ratio | Delta |
|--------|-----------|-----------|-------|-------|
| {name} | {committed} SP | {completed} SP | {ratio}% | {+/-N vs previous} |
| ... | ... | ... | ... | ... |
### Current Sprint Trajectory (if applicable)
- **Committed**: {N} SP
- **Completed so far**: {N} SP (Day {X} of {Y})
- **Burn rate**: {N} SP/day
- **Projected completion**: {N} SP ({trajectory}% of commitment)
- **Status**: {On track|At risk|Off track}
### Insight
{One concrete, data-driven observation with recommendation.}
**Confidence**: {High|Medium|Low} — based on {N} sprints of historical data.
Generates messages suggesting a ghost-done ticket be transitioned to Done. Helpful tone, evidence-based, always asks rather than commands.
Generates contextual, humble messages designed to unblock stuck tickets. Use when a stuck ticket needs a nudge comment.
Generates a quick morning briefing with what happened, what's stuck, and what needs attention today.
Evaluates whether epics are ready for PI or quarter planning by scoring 7 readiness dimensions.
Computes team capacity for a sprint or PI from headcount, PTO, and run-rate buffer.
Estimates completion probability for remaining work using velocity distribution and Monte Carlo-style simulation.