plan-sprint

Plan a new sprint — calculate capacity, select items from backlog, set sprint goal Arguments: <project> [--duration <days>] [--goal <sprint goal>].

Source facts

Repository
Agents-Store/codex-plugins
Last source activity
November 1, 2026 at 02:46
Detected SKILL.md language
English
Stars
0
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
plan-sprint
description
Plan a new sprint — calculate capacity, select items from backlog, set sprint goal Arguments: <project> [--duration <days>] [--goal <sprint goal>].
# Plan Sprint Run a complete sprint planning ceremony — capacity calculation, backlog selection, and sprint creation. Method and rules: the `plane-ops:sprint-planning` skill. ## Arguments Format: `<project> [--duration <days>] [--goal <sprint goal>]` - project: Project name or identifier (required) - --duration: Sprint length in days (default: 5) - --goal: Sprint goal description (optional, will be suggested) Parse from "$ARGUMENTS". ## Process 0. **Bootstrap connector** — consult the `connector-bootstrap` skill. Probe `ToolSearch` for the Plane resource tools referenced below (`project`, `member`, `state`, `cycle`, `workitem`); their names are `mcp__<server>__<resource>`, never assume a specific MCP prefix. If multiple Plane instances are connected, ask the user which one to use. All formulas and rules come from the `agile-fundamentals` skill. Calls are written `resource(action=..., ...)`. 1. **Resolve project:** ``` project(action=list) ``` Find project by name or identifier (follow `next_cursor` if needed). Get project_id. 2. **Get team and context:** ``` member(action=list_project, project_id) member(action=me) state(action=list, project_id) ``` Count team members. Get current user ID. Map state names to UUIDs. 3. **Calculate velocity:** ``` cycle(action=list, project_id, status=completed) ``` For the last 3-5 completed cycles, sum the completed points (`point`; if `point` is empty and the project has an estimate system (`project_estimate(action=retrieve, project_id)`), sum the `value` of each item's `estimate_point` instead (`project_estimate(action=list_points, project_id, estimate_id)` maps ids to values)): ``` cycle(action=list_workitems, project_id, cycle_id, pql='stateGroup = "completed"', fields="id,point,estimate_point") ``` Calculate average velocity. 4. **Calculate capacity:** ``` With history: capacity = avg_velocity × 0.85 Without history: capacity = team_size × duration × 0.7 × 0.85 ``` 5. **Select backlog items:** ``` workitem(action=list, project_id, pql='stateGroup IN ("backlog","unstarted")', fields="id,name,point,estimate_point,priority,assignees") ``` Keep items where `point` is set (PQL has no estimate field). Select items by priority until capacity reached. 6. **Present proposed sprint:** Show table with items, points, assignees, total vs capacity. Suggest sprint goal based on selected items. 7. **On confirmation — create sprint:** ``` cycle(action=create, project_id, name, owned_by, start_date, end_date, description) cycle(action=manage_workitems, project_id, cycle_id, add_ids=[...]) ``` 8. **Verify:** ``` cycle(action=list_workitems, project_id, cycle_id) ``` Confirm all items are in the sprint. ## Example Usage ``` /plan-sprint "My Project" /plan-sprint "TaskFlow" --duration 5 --goal "Launch user authentication" ```