# Plan Sprint
Run a complete sprint planning ceremony — capacity calculation, backlog selection, and sprint creation.
Method and rules: the `plane-ops:sprint-planning` skill.
## Arguments
Format: `<project> [--duration <days>] [--goal <sprint goal>]`
- project: Project name or identifier (required)
- --duration: Sprint length in days (default: 5)
- --goal: Sprint goal description (optional, will be suggested)
Parse from "$ARGUMENTS".
## Process
0. **Bootstrap connector** — consult the `connector-bootstrap` skill. Probe `ToolSearch` for the Plane resource tools referenced below (`project`, `member`, `state`, `cycle`, `workitem`); their names are `mcp__<server>__<resource>`, never assume a specific MCP prefix. If multiple Plane instances are connected, ask the user which one to use. All formulas and rules come from the `agile-fundamentals` skill. Calls are written `resource(action=..., ...)`.
1. **Resolve project:**
```
project(action=list)
```
Find project by name or identifier (follow `next_cursor` if needed). Get project_id.
2. **Get team and context:**
```
member(action=list_project, project_id)
member(action=me)
state(action=list, project_id)
```
Count team members. Get current user ID. Map state names to UUIDs.
3. **Calculate velocity:**
```
cycle(action=list, project_id, status=completed)
```
For the last 3-5 completed cycles, sum the completed points (`point`; if `point` is empty and the project has an estimate system (`project_estimate(action=retrieve, project_id)`), sum the `value` of each item's `estimate_point` instead (`project_estimate(action=list_points, project_id, estimate_id)` maps ids to values)):
```
cycle(action=list_workitems, project_id, cycle_id, pql='stateGroup = "completed"', fields="id,point,estimate_point")
```
Calculate average velocity.
4. **Calculate capacity:**
```
With history: capacity = avg_velocity × 0.85
Without history: capacity = team_size × duration × 0.7 × 0.85
```
5. **Select backlog items:**
```
workitem(action=list, project_id, pql='stateGroup IN ("backlog","unstarted")', fields="id,name,point,estimate_point,priority,assignees")
```
Keep items where `point` is set (PQL has no estimate field). Select items by priority until capacity reached.
6. **Present proposed sprint:**
Show table with items, points, assignees, total vs capacity.
Suggest sprint goal based on selected items.
7. **On confirmation — create sprint:**
```
cycle(action=create, project_id, name, owned_by, start_date, end_date, description)
cycle(action=manage_workitems, project_id, cycle_id, add_ids=[...])
```
8. **Verify:**
```
cycle(action=list_workitems, project_id, cycle_id)
```
Confirm all items are in the sprint.
## Example Usage
```
/plan-sprint "My Project"
/plan-sprint "TaskFlow" --duration 5 --goal "Launch user authentication"
```