Audit closeout packages for as-builts, O&M, warranties, waivers, attic stock, CO, training — gap list for final payment. Triggers: /closeout-audit, "closeout checklist".
Ameribrands/ameribrands-skills
SkillsMP has collected 106 skills from Ameribrands/ameribrands-skills. Open a skill to review its source and details.
- Latest recorded source activity
- SkillsMP catalog refreshed
- skills collected
- 106
- GitHub stars
- 0
- GitHub forks
- 0
Skills in this repository
Showing 40 of 106 collected skills.
Plain-language construction contract risk review: payment, indemnity, delay, LDs, termination, insurance. Triggers: /contract-risk, "review subcontract", "contract risk".
Draft delay notices, EOT requests, and claim narratives with notice timing and evidence structure. Triggers: /delay-claim, "time extension", "delay notice", "EOT".
Review construction pay applications (G702/G703-style) for math errors, retainage, stored materials, and lien-waiver gaps. Triggers: /pay-app-review, "pay application", "G702".
Review subcontractor prequalification packets (insurance, safety metrics, license, bonding) into go/no-go style memos. Use for prequal, sub qualification, COI review. Triggers: /sub-prequal, "prequalify sub", "review COI", "sub prequal".
Workmanship warranty letters, manufacturer/parts pass-through, callback triage, and expiration handoff per Operations Playbook v0.04–0.05. Use for warranty letter, warranty callback, manufacturer warranty, substantial completion warranty. Triggers: /warranty,…
Review WIP / over-under billing schedules for stale ETCs, profit fade, and cash risk flags. Use for WIP, work in progress, overbilling review. Triggers: /wip-review, "WIP schedule", "over under billing".
Draft professional construction emails (notice, transmittal, coordination, follow-up) with appropriate contractual tone. Triggers: /email-drafter, "draft email", "write notice email".
Turn construction meeting notes into structured minutes with decisions, action items (who/what/when), and open issues. Triggers: /meeting-summarizer, "meeting minutes", "OAC minutes".
Draft owner/client project updates for residential or commercial stakeholders from progress facts. Triggers: /owner-update, "owner update", "client weekly update".
Master preconstruction intake: routes to scope, bid leveling, proposal, ITB, or document roles and chains deliverables. Use for precon menu, full bid package AI, estimator cockpit. Triggers: /precon-orchestrator, "precon menu", "run preconstruction workflow",…
Draft daily pre-task plans (PTP/JHA) for crew huddles with task-specific hazards, controls, PPE, and stop-work triggers. Triggers: /pre-task-plan, "PTP", "pre-task", "JHA".
Draft site-specific safety plans (SSSP) and toolbox-talk outlines for construction projects. Use for SSSP, site safety plan, toolbox talk. Triggers: /safety-plan, "site safety plan", "SSSP".
Route the user to the right Ameribrands Skills skill or department orchestrator. Analyzes current intent, playbook phase, and catalog sequencing. Use when help, what next, which skill, lost, menu, playbook route, how do I start. Triggers: /ab-help, "what…
Mid-job change management: when reality invalidates estimate, scope, proposal, or schedule — produce a Change Impact Brief and skill handoffs. Use when correct course, scope changed, drawing revision after bid, margin failed after JCS, owner changed SOW.…
Pressure-test a pursuit or bid idea until Pursue, Kill, or Hold — never default-agree. Use when forge opportunity, should we bid, pursue or kill, pressure-test this deal, harden this pursuit. Triggers: /forge-opportunity, "should we bid this", "pursue or…
Structured retrospective after bid day, punch walk, warranty claim, or bad-margin job. Captures assumptions vs reality and process fixes. Use when job retro, bid retro, post-mortem, after bid day, lessons learned. Triggers: /job-retro, "bid retro", "job…
Multi-role roundtable with fixed Ameribrands casts (precon, field, money, claim). Voices clash; do not force false consensus. Use when party, roundtable, multi-role, estimator vs PM, margin debate, claim posture debate. Triggers: /party, "party mode",…
Binary readiness gate before PDF/export: PASS, CONCERNS, or FAIL. Blocks contractual send on FAIL unless user explicitly overrides residual risk. Use when ready to send, can I send this, gate before PDF, ready-to-send, pass fail export. Triggers:…
Pressure-check a confirmed intake or draft before PDF/export. Finds missing cites, invented-looking numbers, weak parties, margin risk, and rigor mismatches. Use when stress-test, red-team draft, pre-send check, before PDF, critique this draft. Triggers:…
Account Manager Matrix and sales territory/branch helpers: verify AM and Salesperson ownership, prevent channel conflict, set territory for Acumatica and commission reporting. Use for AM Matrix, territory, sales territory, branch assignment, commission owner.…
Draft change order requests/orders (COR/CO) with cost breakdown, schedule impact, and contract-form alignment. Use for change orders, PCOs, extras, scope changes. Triggers: /change-order, "draft CO", "change order request".
Turn field notes, voice transcripts, or PMIS exports into claims-grade daily construction reports (weather, crew, quantities, delays, safety). Use for daily logs, superintendent reports, field reports. Triggers: /daily-log, "daily report", "field log".
Compare drawing revision bulletins to prior sets; per-trade deltas, RFI/CO candidates, unmarked changes. Use for ASI/bulletin review, revision clouds. Triggers: /drawing-revision, "compare revisions", "bulletin review".
Turn drawing set notes, schedules, and indexes into a structured scope outline by trade before pricing. Use for scope from drawings, precon scope draft. Triggers: /drawing-to-scope, "scope from drawings", "generate scope".
Critique 2–3 week look-ahead schedules for constraints, float risk, handoffs, and make-ready gaps. Use for pull planning, look-ahead, LPS prep. Triggers: /lookahead-schedule, "look-ahead", "two-week schedule review".
Constructability and coordination review of drawing sets before break ground: missing info, conflicts, accessibility, FLS gaps. Use for bid review, IFC constructability. Triggers: /preconstruction-check, "constructability review".
Answer project questions with citations across specs, drawings, RFIs, submittals, and minutes. Use for "what does the spec say", document search, project Q&A. Triggers: /project-qa, "search the specs", "what does the drawing say".
Organize walkthrough notes into structured punch lists by location and trade with severity and due dates. Use for punch, snag lists, closeout walks. Triggers: /punch-list, "punch list", "snag list".
Draft or review construction RFIs and RFI responses with document citations, cost/schedule impact, and severity flags. Use for RFIs, clarifications, conflicts between drawings and specs, field questions, and redline review of platform-AI RFI drafts. Triggers:…
Produce one-page submittal review memos: deviations vs specs, disposition stamps, coordination flags. Use for shop drawings, product data, samples. Triggers: /submittal-review, "review submittal".
Front door for Ameribrands/Worktree operations. Routes to department orchestrators by scope (Opportunity, Estimating, Master Project, Project) and work type (Construction, Rollout, Facilities). Use for company menu, worktree playbook, which department, start…
Single-site Construction project delivery per Operations Playbook: Setup through Warranty. Reuses full construction skill set. Use for construction project flow, build-out milestones, remodel delivery. Triggers: /construction-orchestrator, "construction…
Estimating department flow per work type (Construction, Rollout, Facilities): intake through budget baseline & proposal. Reuses precon skills. Use for estimating workflow, worksheet, takeoff gate. Triggers: /estimating-orchestrator, "estimating flow",…
Facilities / maintenance project flow: intake → dispatch (Route Plan/Exec) → perform → verify with Form checklists. Use for facilities, PM work orders, maintenance dispatch. Triggers: /facilities-orchestrator, "facilities flow", "work order flow", "PM…
Opportunity / sales pursuit flow: Qualify → Site Assessment → Estimate & Proposal → Award & Handoff. Maps each activity to construction skills. Use for opportunity, pursuit, award, sales handoff. Triggers: /opportunity-orchestrator, "opportunity flow",…
The **Master Project (program) level** that groups child projects — Construction, Rollout, or Facilities: setup → standards → wave planning → execution → program closeout. Use when work spans multiple sites under one program number and you need the…
The **site-delivery level** of a rollout — executing standardized installs site by site, with heavy Form and Route Plan/Exec activities. Use when running the install waves themselves. For the Master Project that groups those sites, use `program-orchestrator`.…
Time-boxed bid-day checklist: docs, coverage, leveling, plugs, proposal gate. Use for bid day, bid deadline runbook.
Level subcontractor bids apples-to-apples: scope gaps, exclusions, alternates, unit prices, and comparison to each sub's historical boilerplate profile. Use for bid day, sub bid analysis. Triggers: /bid-leveling, "level bids", "compare sub bids".