| description | Plan game day exercises — controlled failure injection to test resilience, runbooks, and team response. Define scenarios, success criteria, safety controls, and learning objectives. TRIGGER when: user says /game-day-plan, "game day", "chaos day", "resilience testing day", "failure drill", or asks to plan a controlled failure exercise.
|
| argument-hint | [system or service to test] |
| user-invocable | true |
Game Day Plan
You are a site reliability engineer planning a game day exercise — a structured, controlled session where the team intentionally injects failures into systems to test resilience, validate runbooks, and improve incident response. Game days build confidence through practice, not hope.
Process
Step 1: Define Objectives and Scope
Before designing scenarios, establish what you want to learn:
| Element | Question | Example |
|---|
| Objective | What hypothesis are you testing? | "Our system recovers from a database failover within 5 minutes" |
| Systems in scope | Which services or infrastructure? | payment-service, order-service, primary database |
| Systems out of scope | What must NOT be touched? | Production customer data, third-party payment processor |
| Environment | Production, staging, or dedicated chaos env? | Production with safeguards |
| Participants | Who is involved? (operators, observers, facilitators) | On-call team, SRE lead (facilitator), VP Eng (observer) |
| Duration | How long is the exercise window? | 2 hours (10 AM - 12 PM EST, Tuesday) |
| Blast radius limit | Maximum acceptable customer impact | < 0.1% of requests affected, < 30 seconds |
| Abort criteria | When do you stop immediately? | Any customer-facing error rate > 1% for > 60 seconds |
Learning objectives checklist:
Step 2: Design Failure Scenarios
Create 2-4 scenarios ranked by risk level:
| Scenario | Failure Type | Injection Method | Expected System Behavior | Risk Level |
|---|
| S1: Database failover | Kill primary DB instance | AWS RDS failover / kill process | Automatic failover to replica in < 30s | Medium |
| S2: Service instance loss | Terminate 50% of pods | kubectl delete pod / Chaos Monkey | Load balancer routes to healthy pods; auto-scale replaces | Low |
| S3: Network partition | Block traffic between services | iptables rules / Toxiproxy / Chaos Mesh | Circuit breaker opens; graceful degradation | Medium |
| S4: Dependency timeout | Add latency to downstream API | Toxiproxy / Envoy fault injection | Timeout and retry with fallback response | Low |
| S5: Disk pressure | Fill disk to 95% | fallocate / stress-ng | Alerts fire; log rotation or auto-remediation kicks in | Medium |
| S6: DNS failure | Block DNS resolution | iptables drop port 53 / CoreDNS kill | Cached entries hold; alerts fire on lookup failures | High |
| S7: Certificate expiry | Deploy expired cert to staging | Replace TLS cert with expired one | Connection failures; alerts on TLS errors | Low (staging) |
| S8: Region failover | Simulate full region outage | Route all traffic to secondary region | Cross-region failover completes within SLO | High |
For each selected scenario, document:
| Field | Content |
|---|
| Hypothesis | "We believe [system] will [expected behavior] when [failure] occurs" |
| Injection tool | Chaos Mesh, Gremlin, Litmus, Toxiproxy, manual script |
| Injection command | Exact command or configuration to inject the failure |
| Expected detection time | How quickly monitoring should detect |
| Expected recovery time | How quickly the system should recover |
| Customer impact expected | None, degraded, or partial outage |
| Abort trigger | When to stop the scenario immediately |
| Reversal procedure | How to undo the injected failure |
Step 3: Establish Safety Controls
Safety controls are non-negotiable:
| Control | Description | Owner |
|---|
| Abort button | One-command reversal of all injected failures | Facilitator |
| Blast radius limits | Canary scope — affect only a subset of instances or traffic | SRE lead |
| Time box | Each scenario has a max duration; auto-revert after timeout | Facilitator |
| Production data protection | No writes to customer data; read-only experiments where possible | All |
| Stakeholder notification | CS, support, and leadership informed of exercise window | Facilitator |
| Rollback plan | Tested rollback for every injection | Scenario owner |
| Monitoring dashboard | Dedicated dashboard showing all key metrics during exercise | SRE lead |
| Communication channel | Dedicated Slack channel or war room for real-time coordination | Facilitator |
| Customer escalation path | If real customers are impacted, immediate escalation to support lead | Support lead |
Pre-game-day checklist:
Step 4: Plan the Exercise Timeline
| Time | Activity | Lead |
|---|
| T-7 days | Finalize scenarios and distribute pre-read | Facilitator |
| T-1 day | Dry run of abort procedures in staging | SRE lead |
| T-30 min | Kickoff meeting — review objectives, roles, safety controls | Facilitator |
| T-15 min | Verify monitoring dashboards and communication channels | SRE lead |
| T-0 | Scenario 1 begins — inject failure | Scenario owner |
| T+5 min | Observe detection and response | All |
| T+15 min | Scenario 1 debrief — capture observations | Facilitator |
| T+20 min | Scenario 2 begins | Scenario owner |
| ... | ... | ... |
| T+90 min | All scenarios complete — final reversal verification | SRE lead |
| T+100 min | Hot debrief — initial findings, action items | Facilitator |
| T+7 days | Full retrospective with written report | Facilitator |
Step 5: Define Success Criteria and Measurement
| Metric | Target | How to Measure |
|---|
| Time to detect (TTD) | < 2 minutes | Timestamp of failure injection vs. first alert |
| Time to mitigate (TTM) | < 10 minutes | First alert to customer impact resolved |
| Time to resolve (TTR) | < 30 minutes | First alert to full system recovery |
| Alert accuracy | 100% of expected alerts fire | Count alerts vs. expected alert list |
| Runbook accuracy | Runbook steps match actual procedure | Binary — did the runbook work as written? |
| Customer impact | Below blast radius limit | Error rate and support tickets during window |
| Communication effectiveness | Stakeholders informed within 5 min of detection | Timestamp of first notification |
| Team confidence | Post-exercise survey score > 4/5 | Anonymous survey |
Step 6: Capture Learnings and Follow Up
After the exercise, produce a game day report:
| Section | Content |
|---|
| Executive summary | 3-5 sentence overview of what was tested and key findings |
| Scenario results | Pass/fail for each scenario with TTD, TTM, TTR |
| Surprises | Unexpected behaviors or failures discovered |
| Runbook gaps | Steps that were missing, wrong, or unclear |
| Monitoring gaps | Failures that were not detected or alerted on |
| Action items | Prioritized list of improvements with owners and deadlines |
| Recommendations | Suggested follow-up exercises or investments |
Output Format
# Game Day Plan — [System/Service Name] — [Date]
## Objectives
- Hypothesis 1: ...
- Hypothesis 2: ...
## Scope
- **In scope:** [services]
- **Out of scope:** [services]
- **Environment:** [prod / staging]
- **Duration:** [time window]
## Participants
| Role | Name | Responsibility |
|------|------|---------------|
| Facilitator | ... | ... |
| Scenario Owner | ... | ... |
| Observer | ... | ... |
## Safety Controls
- Abort procedure: [command / process]
- Blast radius limit: [threshold]
- Customer notification: [plan]
## Scenarios
### Scenario 1: [Name]
- **Hypothesis:** ...
- **Injection:** [method and command]
- **Expected behavior:** ...
- **Abort trigger:** ...
- **Reversal:** [command]
### Scenario 2: [Name]
...
## Timeline
| Time | Activity | Lead |
|------|----------|------|
| ... | ... | ... |
## Success Criteria
| Metric | Target |
|--------|--------|
| ... | ... |
## Post-Exercise
- Debrief: [date/time]
- Report due: [date]
- Action item review: [date]
Quality Checklist
Edge Cases
| Scenario | Handling Approach |
|---|
| Real incident occurs during game day | Immediately abort all injected failures. Revert to normal operations. Handle the real incident. Resume game day on a different day. |
| Injected failure cannot be reversed | This is why abort procedures must be tested in staging first. Have a manual remediation runbook ready. Escalate immediately. |
| Team discovers a critical vulnerability | Stop the exercise. Treat the finding as a real incident. Remediate before resuming any game day activities. |
| Stakeholders demand game day in production but team is not ready | Start with staging or a non-critical service. Build confidence incrementally. Present a maturity roadmap for production exercises. |
| Cascading failure beyond expected blast radius | Abort immediately. This is a valuable finding — document the unexpected dependency chain. Fix before the next exercise. |
| Regulatory or compliance constraints on failure injection | Consult compliance before planning. Document the exercise as a risk management activity. Avoid PII and financial data in scope. |
| Distributed team across time zones | Choose a window that is business hours for the primary operations team. Record the exercise. Share async debrief for other time zones. |