Purpose
You are a release coordinator for the project. You plan and sequence changes that span multiple repositories (or multiple apps/packages of a monorepo) so they land in the correct order, with operator gates enforced by CI probes, and with post-merge validation confirming the whole system works. You produce merge-order plans, MR/PR description templates, CI probe definitions, and validation checklists.
Done when: every affected repo (or monorepo package) is identified and phased, each MR/PR description contains dependency arrows and failure modes, every required operator step has a CI probe, and a post-merge validation checklist covers the end-to-end scenario.
Repo shape -- read this first. Read ${CLAUDE_PROJECT_DIR}/.claude/project.json:
repos lists the code paths agents work in; monorepo (if set) names the monorepo root that contains them.
- Multi-repo workspace (separate git repos): coordination means sequencing MRs/PRs across repos -- each phase is a separate MR in a separate repo, merged in order.
- Monorepo (one git repo, many apps/packages): coordination means sequencing within one repo -- phases map to ordered PRs (or an ordered commit stack) against the same repo, plus package publish / deploy ordering. The phase model below applies unchanged; only the merge mechanics differ, and "merge order" becomes "PR/commit order + deploy order."
- Terminology: "MR" below means merge request / pull request -- use whichever the project's git host calls it.
When to use
- A feature or fix requires changes in two or more of the project's repos (or two or more monorepo apps/packages that deploy independently)
- A new runtime env var is being added (sourced in the infrastructure repo, wired in the deploy/charts repo, consumed by the application)
- A device/edge protocol change requires corresponding WebSocket/SSE format changes in the main app. If the project maintains a living contract document for that boundary, it is the source of truth -- read it FIRST and update it as part of the change (see the
api-contract skill)
- A secret rotation affects multiple services
- A Helm chart change depends on infrastructure bootstrapping that must happen first
When NOT to use
- Single-repo, single-package changes -- even large refactors within one package do not need coordination. Use
refactor-plan
- Hotfixes that touch only one repo -- deploy directly; no coordination needed
- Dependency-only upgrades within one repo -- version bumps in
package.json or requirements.txt that do not affect cross-repo contracts
- Feature-flag toggles that change behavior without deploying new code
- Image promotion between environments (single image, no code changes) -- use the project's deployment workflow / infra-pack skills when enabled
Required environment
- Runtime:
.claude/skills/monorepo-coordination/SKILL.md
${CLAUDE_PROJECT_DIR}/.claude/project.json -- for repos, monorepo, mainApp, device
- Access to all affected repositories (or the monorepo root)
- Ability to read MR/PR descriptions and CI pipeline status on the project's git host
- Access to cluster/deployment state for post-merge validation (the project's version-drift and staging-health commands, if defined)
Inputs
| Input | Required | Description |
|---|
| Change description | Yes | What the logical change is (e.g., "add MAPS_API_KEY as runtime env var") |
| Affected repos/packages | Yes | Which repos or monorepo packages are touched |
| Operator steps | No | Manual actions required between merges (e.g., "run bootstrap script on cluster") |
| Existing MR references | No | Links to draft MRs/PRs already created |
Outputs
Length budget: merge-order plan max 60 lines. Each MR description template max 20 lines. CI probe boilerplate max 15 lines per probe. Total output max 200 lines.
Four deliverables:
- Merge-order plan -- numbered sequence of MRs with repo (or package), branch, phase assignment, and dependency arrows
- MR description template for each MR -- containing: Depends on, Blocks, Operator steps, Failure mode if merged out of order
- CI probe recommendation -- for each required operator step, a CI check that fails if the step was skipped
- Post-merge validation checklist -- end-to-end checks to run after the final MR lands
## Coordination Plan:
Phase Model
| Phase | Repo/Package | MR | Description | Depends on |
|---|
| 1 - Foundation | [repo] | [branch] | [what] | -- |
| 2 - Operator | [action] | -- | [what] | Phase 1 |
| 3 - Wire | [repo] | [branch] | [what] | Phase 2 |
| 4 - Consume | [repo] | [branch] | [what] | Phase 3 |
MR Descriptions
[per-MR template with Depends on / Blocks / Operator steps / Failure mode]
CI Probes
[YAML boilerplate for each required operator step]
Post-Merge Validation
Procedure
-
Identify all affected repos/packages. Read project.json → repos (and monorepo), then map which of them need modifications. Include the version-pinning repo if the project uses one and image digests or chart versions change. Include the device/edge repo (project.json → device) if protocol or edge-device changes are involved.
Checkpoint: all affected repos/packages listed with rationale for inclusion.
-
Determine merge order using the phase model.
- Phase 1 -- Foundation. The repo furthest from runtime (usually the infrastructure repo). Changes are additive: new secrets, new schema fields, new defaults. Must be safe to merge without consumers being aware.
- Phase 2 -- Operator action (if any). Cluster-state changes required by Phase 1 (e.g., run a bootstrap script). Machine-enforce via CI probes in Phase 3.
- Phase 3 -- Wire consumers. Charts and configs that reference the new foundation (the deploy/charts repo). Gated by guards that fail if Phase 2 was skipped (e.g., a require-real-secret guard in Helm, pre-flight probes in CI).
- Phase 4 -- Consume. Application-level changes (the main app, the device service). By this point infrastructure and charts are ready.
In a monorepo, the phases become an ordered sequence of PRs (or a stacked commit series) against the same repo: foundation packages merge and release first, consumers after. Deploy ordering still matters even when the code merges together -- if two apps deploy independently, phase the deploys.
If the device/edge repo is involved (e.g., a protocol change), it is typically Phase 1 or Phase 4 depending on whether it produces or consumes the change. If the project maintains a living contract document for a cross-service boundary (see api-contract), that document is the source of truth: read it FIRST to establish the current shape, and place its update in the merge order no later than the emitter change so both sides have an agreed reference before the consumer merges. Both the emitter and the consumer are validated against that contract, not against each other's code.
Checkpoint: merge order reviewed for circular dependencies -- if found, escalate. If a contracted boundary changed, the contract-document update is present in the merge order.
-
Draft MR descriptions. Each MR in the sequence states:
## Coordination
- **Depends on**: [repo] MR (must be merged first)
- : [repo] MR (waiting on this)
: [REQUIRED] Run on cluster
OR: None
: [what breaks]
Self-check
Before returning, verify every item:
Common mistakes
- DO NOT merge Phase 3 before Phase 1 -- this causes Helm render failures or missing secrets at deploy time
- DO NOT rely on MR description text alone for operator gates -- always back required steps with CI probes
- DO NOT omit the device/edge repo when protocol or firmware changes are involved -- silent message format mismatches result
- DO NOT change a contracted cross-service boundary without updating its living contract document -- it is the source of truth both sides are validated against, and a stale contract file causes silent cross-tier drift
- DO NOT use mutable image tags in cross-repo handoffs -- always reference immutable digests when one MR depends on an image built by another
- DO NOT omit "Blocks" / "Depends on" from MR descriptions -- without explicit dependency arrows, reviewers merge in arbitrary order
- DO NOT reference MR numbers as durable identifiers -- MR numbers (
!18, #12) become stale; reference template files or describe the pattern inline
- DO NOT assume a monorepo needs no coordination -- one repo does not mean one deploy; independently deployed apps still need phase ordering
Escalation
- Circular dependency between repos/packages: escalate -- the change may need to be restructured into additive + consuming phases
- No CI probe possible for an operator step: flag explicitly as a gap and recommend monitoring to detect the failure mode
- Device firmware version mismatch: if a protocol change requires a firmware update that cannot be tested in CI, escalate for manual test planning
- Cross-repo drift detected by the version-drift check: investigate which repo is behind and report before proceeding
Examples
**Scenario: Adding a new runtime env var (MAPS_API_KEY) -- multi-repo shape**
Merge order:
- Infrastructure repo -- add
MAPS_API_KEY to secret bootstrap seed. (Phase 1)
- Operator action: run
scripts/bootstrap-secret.sh on the staging cluster. (Phase 2)
- Deploy/charts repo -- wire
MAPS_API_KEY in the main-app chart values + Deployment env. Add a require-real-secret guard. (Phase 3)
- Main-app repo -- read
MAPS_API_KEY via the server env accessor, expose to the client via a runtime bridge. (Phase 4)
CI probe for Phase 2:
check-maps-key-bootstrapped:
stage: pre-deploy
script:
- ssh ${CLUSTER_HOST} "kubectl get secret app-env -n ${NAMESPACE} -o jsonpath='{.data.MAPS_API_KEY}' | base64 -d | grep -v CHANGE_ME"
rules:
- if: '$CI_COMMIT_BRANCH == "main"'
Post-merge validation: open browser, confirm the runtime env bridge exposes MAPS_API_KEY and maps render.
In a monorepo, the same change is 2-3 ordered PRs against one repo (infra manifests → chart wiring → app consumption), with the operator action still gated between them by the same CI probe.
**Scenario: Device message format change across a contracted boundary**
First artifact to read: the living contract document for the device↔app boundary (e.g. docs/contracts/websocket-contract.md -- check the project's docs and the api-contract skill). It declares the message shapes both sides must agree on; establish the current shape here before touching either side, and update it as the first step so both sides validate against one reference.
Merge order:
- Contract document -- declare the new
PROGRESS_UPDATE shape (field names, types, casing convention). Source of truth both sides are validated against. (Phase 1)
- Device repo/package -- add the new message emitter (additive, backward compatible), matching the contract. (Phase 1)
- Main app -- add the WebSocket handler for the new message type, update the TypeScript types to match the contract. (Phase 4)
- Deploy/charts repo -- bump chart
appVersion if the device image digest changed. (Phase 3)
- Version-pinning repo (if the project uses one) -- record new image digests. (Phase 4)
Post-merge validation: connect to a test device, confirm PROGRESS_UPDATE messages appear in the telemetry stream and match the shape declared in the contract document.
Failure modes
| Failure | Symptom | Recovery |
|---|
| Phase 3 merged before Phase 1 | Helm render fails: secret value is CHANGE_ME | Revert Phase 3 MR, merge Phase 1 first, run operator step, re-merge |
| Operator step skipped | Deploy succeeds but app crashes on missing secret | Run the operator step, then redeploy; add CI probe to prevent recurrence |
| Device repo omitted from plan | Silent message format mismatch: the app receives unexpected fields | Add the device MR to the sequence, coordinate the device deploy |
| Version-drift check shows drift | One repo's version file references a non-existent image digest | Identify which MR has not been merged; merge it before promoting |
Related skills
api-contract -- contract-first workflows; the living contract document pattern used at cross-service boundaries
refactor-plan -- planning for changes confined to a single repo/package
- The project's deployment workflow / infra-pack skills when enabled -- CI pipeline design, Helm chart wiring (Phase 3), GitOps environment promotion, and how the version-pinning repo records each promotion step
troubleshooting -- diagnostic patterns when a coordination sequence fails post-merge
supply-chain-security -- digest and retention policies that affect cross-repo image references
How to use
What it does
This skill plans the order in which a change lands when it touches more than one repository — or more than one independently deployed app inside a monorepo. You get a phased merge order, an MR/PR description template that spells out what depends on what, CI probes that fail when a required manual step was skipped, and a checklist to run once the last MR merges.
When to use it
- A feature or fix needs changes in two or more repos, or in two or more monorepo packages that deploy independently.
- You are adding a runtime environment variable that is seeded in one place, wired in another, and read by the application.
- A message-format change crosses a contracted boundary between a device or edge service and the app.
- A chart or config change depends on a manual operator step that has to happen first.
When not to use it
- A single-repo, single-package change, however large — use
refactor-plan.
- A hotfix confined to one repo; just deploy it.
- A dependency version bump that touches no cross-repo contract.
- Promoting an existing image between environments with no code change — use your deployment workflow.
How to invoke
Skill(skill: "core:monorepo-coordination")
Invoke it with the change description and the list of affected repos or packages; the skill reads ${CLAUDE_PROJECT_DIR}/.claude/project.json to learn whether you are in a multi-repo workspace or a monorepo and adapts the merge mechanics to that shape.
Inputs
- Change description — what the logical change is, in one line — required.
- Affected repos or packages — which code paths are touched — required.
- Operator steps — manual actions needed between merges, such as running a bootstrap script — optional.
- Existing MR references — links to drafts already open — optional.
What you get back
A single plan, capped at about 200 lines, with four parts: a phase table (foundation → operator action → wire → consume) listing repo, branch and dependencies; per-MR description blocks carrying Depends on, Blocks, Operator steps and Failure mode if merged out of order; CI probe YAML for each required operator step; and a post-merge validation checklist. Nothing is merged or pushed for you — the output is a plan you act on.
Worked example
Skill(skill: "core:monorepo-coordination")
Change: add MAPS_API_KEY as a runtime env var. Repos: infrastructure,
deploy charts, main app. Operator step: run the secret bootstrap script
on the staging cluster.
The plan comes back as four phases: seed the secret in the infrastructure repo, run the bootstrap script, wire the value into the chart with a guard that fails on a placeholder, then read it in the app. Phase 2 gets a CI probe that reads the cluster secret and fails if it still contains CHANGE_ME. Validation closes with a browser check that the value reaches the client.
Related
api-contract — reach for it first when the change crosses a documented service boundary.
refactor-plan — for changes that stay inside one repo or package.
troubleshooting — when a coordinated sequence has already merged and something broke.
supply-chain-security — for the digest and retention rules behind cross-repo image references.