| name | aejmic-rebuttal |
| description | Use when drafting the response letter and revision plan after an American Economic Journal: Microeconomics (AEJ: Micro) R&R. Structures the reply to theory referees (correctness, generality, exposition) and editor; it does not re-derive the result (see aejmic-theory-model). |
R&R Rebuttal & Response Letter (aejmic-rebuttal)
When to trigger
- An AEJ: Micro decision letter arrived with an R&R (minor or major)
- You have referee reports and need a response-letter strategy
- A referee disputes a proof, the generality, or the framing and you must decide concede vs. defend
- You are sequencing the revision so the most important changes land first
How to respond to theory referees
AEJ: Micro referees are subject-matter experts who verify proofs and judge generality and exposition. The response letter must be precise, respectful, and point-by-point. Three recurring axes:
- Correctness: a disputed proof step. Either fix it (and show the corrected argument in the letter), or demonstrate the step is valid with the missing detail. Never wave it away.
- Generality / robustness: "does it extend to X?" Decide whether to (a) prove the extension, (b) add it to
aejmic-robustness as a result, or (c) explain precisely why the boundary is where it is and add a remark. State the cost of each.
- Exposition / scope: "the mechanism is buried" or "the claim is too broad." Re-frame via
aejmic-writing-style and bound the claim explicitly.
Letter structure
- A short cover note to the editor summarizing the main changes and how the central concern was met.
- Point-by-point replies: quote the comment, state the change, point to the page/line and the new/updated proposition or proof.
- Concede gracefully where the referee is right; defend with argument (not assertion) where you disagree, and offer a compromise (a remark, a restricted claim) when full concession is wrong.
- Keep a changelog of every result that moved (new propositions, relabeled lemmas, added extensions).
Triage the reports before drafting
Not all comments carry equal weight. Sort them:
- Central (editor-flagged): the concern the editor named as decisive â resolve it first and lead the cover note with it.
- Correctness blockers: any disputed proof or claim â must be fully closed, never deferred.
- Generality requests: decide per comment whether to prove, add a robustness result, or bound with a precise argument.
- Exposition / framing: usually cheap to grant; granting them buys goodwill for the points you defend.
Reading the decision letter
- A minor R&R means the result stands; tighten and answer. A major R&R means at least one referee doubts the contribution or a proof â treat the central concern as the gate to acceptance.
- Distinguish what the editor requires (binding) from what a single referee merely suggests (negotiable). Address all, but prioritize by the editor's framing.
Checklist
Anti-patterns
- "We thank the referee and have addressed this" with no concrete change or pointer
- Defending a disputed proof step by restating it instead of completing it
- Adding every requested extension uncritically, bloating the paper (curate via
aejmic-robustness)
- Conceding a correct result under pressure when a bounded claim was the right answer
- Letting the proof appendix or deposited code drift out of sync with the revised results
Worked vignette (illustrative)
Referee 1 disputes the uniqueness claim; Referee 2 asks for a continuum extension; the editor wants the contribution sharpened. Strategy: (1) Correctness â uniqueness held only under a tie-breaking rule, so restrict the claim to "essentially unique" and prove it, conceding the over-statement. (2) Generality â the continuum extension survives, so add it as Proposition 5 and cite it in the letter. (3) Scope â rewrite the intro to foreground the broad mechanism. The cover note tells the editor the central concern (uniqueness) is resolved by a precise, defensible restatement.
Output format
ăDecisionăminor / major R&R
ăEditor cover noteăcentral concern + how met
ăPoint-by-pointăeach comment â change â page/line + result pointer
ăCorrectnessădisputed steps fixed/defended? [Y/N]
ăGeneralityăextend / new result / boundary argument â chosen per comment
ăConcede vs. defendălog of each call
ăChangelog + package syncăresults that moved; appendix/code updated? [Y/N]
ăNext stepăresubmit via AEA system with the point-by-point response letter