| name | rt-ladder-ev |
| description | Use when choosing between submission sequences rather than between single venues — "should I try the top journal first, or start one rung down?", or when a tenure/job-market clock makes time-to-print the binding constraint. Costs a resubmission ladder in months and in probability of ever placing, using each venue's own turnaround and desk-reject figures. Follows rt-journal-match, which produces the ladder this one prices. |
Ladder Expected Value (rt-ladder-ev)
rt-journal-match returns a shortlist and an order. This answers the question that
order implies but never states: what does that sequence cost?
Authors compare venues one at a time — is this one worth a shot? — and in isolation the
answer is almost always yes. The cost only appears in the sequence, and it is a trade
between months and placement probability that nothing else in this repository made
visible, so it was settled by optimism.
The size of the trade is whatever your inputs say it is; the point of the tool is that
you find out before spending the months rather than after. In the
worked example, one
reach rung costs about four and a half months and buys about four points of placement
probability — and the sensitivity band shows the four points are not distinguishable
from zero while the four months are. That shape of answer, rather than a winner, is the
usual output.
When to trigger
- Two candidate submission orders and no principled way to choose.
- A clock: job market, tenure case, grant report, a co-author's graduation.
- A paper that has already been rejected twice and needs the remaining ladder costed.
- Someone asks "is it worth trying X first?" — that is a sequence question.
What it needs
The paper-profile.yml
(for ambition, constraints.clock, history) plus, for each rung, three numbers:
| Input | Where it comes from |
|---|
| months to first decision | the venue's resources/official-source-map.md — live-checked, never from memory |
| desk-reject / acceptance rate | same source map, same rule |
p_accept for this paper | your judgement, conditioned on the paper — see below |
p_accept is not the published acceptance rate. A venue's 6% is computed over a
submission pool that includes everything sent to it. A clean design with a
general-interest result is not a random draw from that pool, and neither is a thin one.
Start from the published rate, then move it with the venue's own
*-topic-selection fit judgement and rt-desk-reject-risk output, and say which way you
moved it and why.
What it does
python3 tools/ladder_ev.py \
--rung "Journal of Finance:0.05:4.5" \
--rung "Review of Financial Studies:0.08:5.0" \
--rung "JFQA:0.20:3.5" \
--rung "Journal of Banking and Finance:0.35:2.5"
Walks the ladder top-down carrying the probability the paper is still unplaced, and
returns: time until the ladder resolves, time to print conditional on placing, the
probability of placing at all, and — the number that changes minds — the probability of
running the ladder out and having nowhere left to go.
Then run the alternative sequence and compare. The comparison is the deliverable, not
either number on its own.
Hard rules
- Turnaround and acceptance figures come from the source map, read at the time of
use. They are volatile; this skill stores none of them.
- Report the band, not the point.
p_accept is a judgement, so the tool prints a
±40% sensitivity band by default. If two ladders' bands overlap, say they are
indistinguishable — do not rank them anyway on the third decimal place.
- A ladder with no floor is not a plan. If the probability of exhausting the ladder
exceeds ~25%, the shortlist is missing a credible home; go back to
rt-journal-match for a safe rung rather than reporting a number.
- Never present the output as a forecast. It is arithmetic over stated assumptions.
State the assumptions next to the answer.
Output format
【Ladder A】V1 → V2 → V3 resolves in N months · places P% · exhausts E%
【Ladder B】V2 → V3 resolves in N months · places P% · exhausts E%
【Difference】what B buys or costs vs A, in months and in placement probability
【Sensitivity】whether the difference survives the ±40% band
【Assumptions】each p_accept, and why it differs from the published rate
【Recommendation】which sequence, and the one fact that would change it
Anti-patterns
- Using published acceptance rates as
p_accept — that is the pool's number, not the
paper's.
- Costing a ladder whose rungs were never checked for fit; a fast rung that will desk-
reject the paper on scope is not a rung. Run
rt-journal-match first.
- Optimising time-to-print alone. A worse-placed paper can cost more career-years than
the months it saved —
ambition in the profile is what balances that, and it belongs
in the write-up.
- Reporting one decimal place of expected months as though it were measured.
Follows rt-journal-match (which builds the ladder) and
rt-venue-reframe (which prices the rewrite each rung
needs). Method: journal-match.md
step 6.