| name | knowledge-transfer-plan |
| enabled | true |
| description | Use when performing knowledge transfer plan — structures a knowledge transfer
plan for engineering teams facing team transitions, departures, or domain
ownership changes. This template ensures critical knowledge about systems,
processes, and tribal context is documented, transferred to receiving team
members, and validated before the transition is complete.
|
| required_connections | [{"prefix":"collaboration","label":"Collaboration Tool"},{"prefix":"ticketing","label":"Ticketing System"}] |
| config_fields | [{"key":"transfer_reason","label":"Transfer Reason","required":true,"placeholder":"e.g., Team member departure, ownership transfer, re-org"},{"key":"source_person","label":"Knowledge Source (Person/Team)","required":true,"placeholder":"e.g., Jane Smith or Platform Team"},{"key":"target_person","label":"Knowledge Recipient (Person/Team)","required":true,"placeholder":"e.g., John Doe or API Team"},{"key":"deadline","label":"Transfer Deadline","required":true,"placeholder":"e.g., 2026-04-15"}] |
| features | ["KNOWLEDGE_TRANSFER","ENGINEERING_MANAGEMENT","DOCUMENTATION"] |
Knowledge Transfer Plan
Phase 1: Knowledge Inventory
Catalog all knowledge areas that need to be transferred.
| Knowledge Area | Type | Criticality (H/M/L) | Documentation Exists | Transfer Method |
|---|
| System / Process / Domain | | Y/N | Pairing / Doc / Walkthrough |
Knowledge Types:
Phase 2: Documentation Sprint
For each knowledge area with missing or outdated documentation:
| Document | Author | Reviewer | Status |
|---|
| | | Draft / Review / Complete |
Phase 3: Transfer Sessions
Schedule and conduct structured knowledge transfer sessions.
| Session Topic | Date | Duration |
|---|