| name | runbook-dependency-upgrade |
| enabled | true |
| description | Use when performing runbook dependency upgrade — dependency upgrade workflow
covering compatibility check, testing, deployment, and monitoring. Use for
library upgrades, framework version bumps, runtime updates, or security patch
application.
|
| required_connections | [] |
| config_fields | [{"key":"dependency_name","label":"Dependency Name","required":true,"placeholder":"e.g., react, spring-boot, python"},{"key":"current_version","label":"Current Version","required":true,"placeholder":"e.g., 3.1.2"},{"key":"target_version","label":"Target Version","required":true,"placeholder":"e.g., 3.2.0"},{"key":"affected_services","label":"Affected Services","required":false,"placeholder":"e.g., api-service, web-frontend"}] |
| features | ["RUNBOOK","DEPLOYMENT"] |
Dependency Upgrade Runbook Skill
Upgrade {{ dependency_name }} from {{ current_version }} to {{ target_version }}.
Affected services: {{ affected_services }}
Workflow
Phase 1 — Compatibility Assessment
COMPATIBILITY ASSESSMENT
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
UPGRADE DETAILS
Dependency: {{ dependency_name }}
Current: {{ current_version }}
Target: {{ target_version }}
Change type: [MAJOR / MINOR / PATCH]
Release date: ___
End-of-life for current version: ___
CHANGELOG REVIEW
[ ] Read changelog / release notes for all versions between current and target
[ ] Identify breaking changes: ___
[ ] Identify deprecated APIs being used: ___
[ ] Identify new features to leverage: ___
[ ] Review security advisories (CVEs fixed): ___
DEPENDENCY TREE IMPACT
[ ] Check transitive dependency changes
[ ] Identify conflicting version requirements
[ ] Verify peer dependency compatibility
[ ] Check compatibility with other major dependencies:
Dependency: ___ (version: ___) — compatible: YES / NO
Dependency: ___ (version: ___) — compatible: YES / NO
RISK ASSESSMENT
Risk level: [LOW / MEDIUM / HIGH / CRITICAL]
Estimated code changes required: ___
Estimated testing effort: ___
Phase 2 — Code Changes and Local Testing
CODE CHANGES
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[ ] Create feature branch for upgrade
[ ] Update dependency version in manifest:
- package.json / pom.xml / requirements.txt / go.mod / Gemfile
[ ] Run dependency resolution (npm install / mvn resolve / pip install)
[ ] Fix compilation errors: ___ files changed
[ ] Update deprecated API calls: ___ call sites
[ ] Update configuration for new version requirements
[ ] Update type definitions (if applicable)
LOCAL TESTING
[ ] Application builds without errors
[ ] Unit tests pass: ___ / ___ passing
[ ] Integration tests pass: ___ / ___ passing
[ ] Manual smoke test of critical paths:
[ ] Path: ___ — Result: PASS / FAIL
[ ] Path: ___ — Result: PASS / FAIL
[ ] Path: ___ — Result: PASS / FAIL
[ ] Performance benchmark (no regression):
Before: ___ ms avg | After: ___ ms avg
Phase 3 — Staging Deployment and Testing
STAGING DEPLOYMENT
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[ ] Deploy to staging environment
[ ] Verify application starts without errors
[ ] Run full test suite in staging:
Unit: ___ / ___ passing
Integration: ___ / ___ passing
E2E: ___ / ___ passing
[ ] Run performance / load tests:
Throughput: ___ RPS (baseline: ___ RPS)
Latency p95: ___ ms (baseline: ___ ms)
Error rate: ___% (baseline: ___%)
[ ] Verify logging and monitoring still functioning
[ ] Test rollback procedure in staging:
[ ] Revert to {{ current_version }}
[ ] Confirm application works on old version
[ ] Re-deploy {{ target_version }}
SECURITY SCAN
[ ] Run dependency vulnerability scan (Snyk, Dependabot, etc.)
[ ] No new HIGH/CRITICAL vulnerabilities introduced
[ ] License compliance check passed
Phase 4 — Production Deployment
PRODUCTION DEPLOYMENT
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
PRE-DEPLOYMENT
[ ] Code review approved
[ ] Staging sign-off obtained
[ ] Deployment window confirmed
[ ] Rollback plan documented and ready
[ ] On-call engineer notified
DEPLOYMENT STRATEGY
[ ] Canary: deploy to ___% of instances first
[ ] Blue-green: deploy to inactive environment
[ ] Rolling: update instances in batches of ___
EXECUTION
[ ] Deploy to production: ___
[ ] Monitor canary / first batch for ___ minutes
[ ] Check error rate: ___% (threshold: ___%)
[ ] Check latency: ___ ms (threshold: ___ ms)
[ ] Proceed with full rollout: YES / ROLLBACK
[ ] Full rollout complete at: ___
Phase 5 — Post-Deployment Monitoring
POST-DEPLOYMENT MONITORING (24-72h)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
HEALTH METRICS (check at T+1h, T+4h, T+24h, T+72h)
Metric Pre-upgrade Post-upgrade Status
─────────────── ───────────── ───────────── ─────────
Error rate ___% ___% OK / WARN
Latency (p95) ___ms ___ms OK / WARN
Memory usage ___MB ___MB OK / WARN
CPU usage ___% ___% OK / WARN
Throughput ___RPS ___RPS OK / WARN
[ ] No new error patterns in logs
[ ] No increase in exception rates
[ ] No memory leaks (memory stable over time)
[ ] No performance degradation under load
[ ] Downstream services unaffected
Phase 6 — Rollback and Cleanup
ROLLBACK (if issues detected)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Trigger: error rate > ___%, latency regression > ___%, crash loops
1. [ ] Revert deployment to previous version ({{ current_version }})
2. [ ] Verify application healthy on old version
3. [ ] Investigate failure root cause
4. [ ] Fix and re-attempt upgrade
CLEANUP (if upgrade successful)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[ ] Merge upgrade branch to main
[ ] Remove any temporary compatibility shims
[ ] Update documentation with new version
[ ] Close upgrade ticket
[ ] Plan removal of deprecated API usage (if deferred)
[ ] Schedule next dependency review: ___
Counter-Rationalizations
| Shortcut | Counter | Why |
|---|
| "We can skip some steps for this case" | Adapt the workflow steps, don't skip them | Skipped steps are where incidents and oversights originate |
| "The user seems to already know what to do" | Complete all workflow phases with the user | The workflow catches blind spots that experience alone misses |
| "This is a minor case, full process is overkill" | Scale the process down, don't turn it off | Minor cases become major when unstructured; the process scales, not disappears |
| "I'll fill in the details later" | Complete each section before moving on | Deferred details are forgotten; real-time capture is more accurate |
| "The template output isn't necessary" | Always produce the structured output format | Structured output enables comparison, audit trails, and handoff to other teams |
Output Format
Produce a dependency upgrade report with:
- Upgrade summary (dependency, versions, risk level)
- Compatibility assessment with breaking changes identified
- Test results (unit, integration, e2e, performance)
- Deployment log with canary/rollout progression
- Post-deployment metrics comparison (before vs. after)
- Issues and follow-up actions