| name | division-06-wood-plastics-composites-bid-scope |
| description | Whole-division starter rules for CSI Division 06 - Wood, Plastics, and Composites. Use when starting, triaging, validating, or packaging a commercial carpentry or millwork bid. |
Division 06 - Wood, Plastics, and Composites Bid Scope
Company: Your Company
CSI division(s): 06
Spec section hints: 06 00 00, 06 10 00, 06 16 00, 06 20 00, 06 40 00, 06 60 00
Scope Rule
Base bid is limited to CSI Division 06 - Wood, Plastics, and Composites work specifically assigned to the bidder: rough carpentry, sheathing, blocking, architectural woodwork, countertops, and plastic/composite fabrications. Framing in other divisions, casework in Division 12, waterproofing, hardware, and finishes must be explicitly included, excluded, or flagged before pricing.
Base Scope
- rough carpentry
- wood blocking and backing
- wood sheathing and panels
- architectural woodwork when assigned
- plastic laminate work when assigned
- countertops when assigned
- composite fabrications when assigned
Terms That Usually Identify This Scope
- rough carpentry
- wood
- blocking
- backing
- sheathing
- millwork
- casework
- plastic laminate
- countertop
- 06 00
Adjacent Scope To Exclude By Default
- metal framing
- finish painting
- door hardware
- waterproofing
Adjacent Scope To Flag Before Pricing
- casework
- countertop
- fire-retardant
- blocking by others
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-06-wood-plastics-composites.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-06-wood-plastics-composites before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.