Skip to main content

division-06-wood-plastics-composites-bid-scope

Whole-division starter rules for CSI Division 06 - Wood, Plastics, and Composites. Use when starting, triaging, validating, or packaging a commercial carpentry or millwork bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
division-06-wood-plastics-composites-bid-scope
description
Whole-division starter rules for CSI Division 06 - Wood, Plastics, and Composites. Use when starting, triaging, validating, or packaging a commercial carpentry or millwork bid.
# Division 06 - Wood, Plastics, and Composites Bid Scope Company: Your Company CSI division(s): 06 Spec section hints: 06 00 00, 06 10 00, 06 16 00, 06 20 00, 06 40 00, 06 60 00 ## Scope Rule Base bid is limited to CSI Division 06 - Wood, Plastics, and Composites work specifically assigned to the bidder: rough carpentry, sheathing, blocking, architectural woodwork, countertops, and plastic/composite fabrications. Framing in other divisions, casework in Division 12, waterproofing, hardware, and finishes must be explicitly included, excluded, or flagged before pricing. ## Base Scope - rough carpentry - wood blocking and backing - wood sheathing and panels - architectural woodwork when assigned - plastic laminate work when assigned - countertops when assigned - composite fabrications when assigned ## Terms That Usually Identify This Scope - rough carpentry - wood - blocking - backing - sheathing - millwork - casework - plastic laminate - countertop - 06 00 ## Adjacent Scope To Exclude By Default - metal framing - finish painting - door hardware - waterproofing ## Adjacent Scope To Flag Before Pricing - casework - countertop - fire-retardant - blocking by others ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-06-wood-plastics-composites`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-06-wood-plastics-composites` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub