Skip to main content

division-08-openings-bid-scope

Whole-division starter rules for CSI Division 08 - Openings. Use when starting, triaging, validating, or packaging a commercial doors, frames, hardware, glazing, or storefront bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
division-08-openings-bid-scope
description
Whole-division starter rules for CSI Division 08 - Openings. Use when starting, triaging, validating, or packaging a commercial doors, frames, hardware, glazing, or storefront bid.
# Division 08 - Openings Bid Scope Company: Your Company CSI division(s): 08 Spec section hints: 08 00 00, 08 11 00, 08 14 00, 08 31 00, 08 41 00, 08 44 00, 08 71 00, 08 80 00 ## Scope Rule Base bid is limited to CSI Division 08 - Openings work specifically assigned to the bidder: doors, frames, access panels, entrances, storefront, curtain wall, windows, hardware, glazing, and louvers. Structural steel, low-voltage wiring, access control, painting, and wall construction must be explicitly included, excluded, or flagged before pricing. ## Base Scope - hollow metal doors and frames - wood doors when assigned - access doors and panels - aluminum entrances and storefront when assigned - windows and curtain wall when assigned - finish hardware - glazing and louvers when assigned ## Terms That Usually Identify This Scope - door - frame - hardware - storefront - curtain wall - window - glazing - louver - access panel - 08 00 ## Adjacent Scope To Exclude By Default - low-voltage wiring - card reader - painting - structural steel ## Adjacent Scope To Flag Before Pricing - access control - electric strike - panic - closer - fire rating ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-08-openings`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-08-openings` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub