Skip to main content

division-32-exterior-improvements-bid-scope

Whole-division starter rules for CSI Division 32 - Exterior Improvements. Use when starting, triaging, validating, or packaging a commercial sitework, paving, landscaping, or fence bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
division-32-exterior-improvements-bid-scope
description
Whole-division starter rules for CSI Division 32 - Exterior Improvements. Use when starting, triaging, validating, or packaging a commercial sitework, paving, landscaping, or fence bid.
# Division 32 - Exterior Improvements Bid Scope Company: Your Company CSI division(s): 32 Spec section hints: 32 00 00, 32 01 00, 32 10 00, 32 12 00, 32 13 00, 32 17 00, 32 31 00, 32 80 00, 32 90 00 ## Scope Rule Base bid is limited to CSI Division 32 - Exterior Improvements work specifically assigned to the bidder: paving, pavement markings, site concrete when assigned, fences and gates, retaining walls, irrigation, planting, and exterior amenities. Earthwork, utilities, electrical power, structural concrete, and environmental work must be explicitly included, excluded, or flagged before pricing. ## Base Scope - asphalt and concrete paving when assigned - pavement markings and signage when assigned - fences and gates when assigned - retaining walls when assigned - irrigation when assigned - planting and landscape restoration when assigned - site furnishings and exterior amenities when assigned ## Terms That Usually Identify This Scope - exterior improvements - paving - asphalt - pavement marking - fence - gate - irrigation - planting - landscape - 32 00 ## Adjacent Scope To Exclude By Default - storm drainage - water utility - electrical feeder - building concrete ## Adjacent Scope To Flag Before Pricing - earthwork - electrical - site utility - tree protection - maintenance ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-32-exterior-improvements`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-32-exterior-improvements` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub