Skip to main content

electrical-bid-scope

Bid-project scope rules for electrical work. Use when starting, triaging, validating, or packaging a commercial electrical bid.

Jump to install

Source facts

Repository
ContractorKeith/contractor-bid
Last source activity
July 1, 2026 at 22:41
Detected SKILL.md language
English
Stars
5
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
electrical-bid-scope
description
Bid-project scope rules for electrical work. Use when starting, triaging, validating, or packaging a commercial electrical bid.
# Electrical Bid Scope Company: Your Company CSI division(s): 26, 27, 28 Spec section hints: 26 05 00, 26 24 16, 26 51 00 ## Scope Rule Base bid is limited to electrical systems defined by the profile. Low-voltage, fire alarm, security, data, controls, utility company work, and owner-furnished equipment must be explicitly included, excluded, or flagged before pricing. ## Base Scope - panels - feeders - branch circuits - lighting - devices - gear - conduit ## Terms That Usually Identify This Scope - electrical - panel - lighting - conduit - feeder - 26 05 - 26 24 ## Adjacent Scope To Exclude By Default - utility company - owner furnished - mechanical controls unless listed ## Adjacent Scope To Flag Before Pricing - fire alarm - security - data - controls - low voltage - generator ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile electrical`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile electrical` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.
View on GitHub