Skip to main content
Run any Skill in Manus
with one click

uk-solar-planner

Stars18
Forks0
UpdatedJuly 15, 2026 at 12:42

Plan UK ground-mounted (utility-scale) solar farms end-to-end: site suitability, optimal tilt and inter-row spacing (GCR), array capacity and annual yield, 3D layout with inter-row shadow review, generation forecasting, and DNO grid-connection feasibility. Composes the qgis (site/terrain/ALC/flood) and blender (3D array + shading) skills with PVGIS yield data, Open Climate Fix's quartz-solar-forecast, and OpenDSS grid modelling. Use whenever the task involves a UK solar farm / solar site / ground-mount PV array — assessing a field or parcel for solar, sizing capacity, choosing panel tilt/row spacing, estimating kWh/yield or land use, visualising an array layout, checking shading, forecasting generation, or DNO/grid-connection pre-checks (e.g. 'is this 30-acre field good for solar', 'what tilt and spacing for a solar farm near Peterborough', 'how many MW fit on 20 hectares', 'model the array layout and winter shadows'). UK-specific (latitude, diffuse light, ALC land grades, DNO). Not for rooftop domestic PV or

Installation

Install with Codex or Claude Copy this prompt, paste it into Codex, Claude, or another assistant, and let it review the skill page and install it for you.

File Explorer
7 files
SKILL.md
readonly