Skip to main content

neqsim-equipment-cost-estimation

Equipment and process CAPEX estimation — Turton/Peters/Ulrich/Seider correlations, CEPCI escalation, material/pressure factors, bare-module to grass-roots, AACE class 1-5, location factors, currency conversion, CostEstimateResult reconciliation, and mechanical-design-driven topsides/SURF/well rollups. USE WHEN: a task requires a +30%/-30% Class-3/4 estimate for equipment, a process flowsheet, topsides, SURF, wells, or reservoir-to-market CAPEX. Anchors on CostEstimationCalculator and ProcessCostEstimate.

Jump to install

Source facts

Repository
equinor/neqsim
Last source activity
June 28, 2026 at 18:47
Detected SKILL.md language
English
Stars
147
Forks
64

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.