| description | This skill should be used when "breaking down tasks", "creating task table", "parallel tracks", "shippable increments", or planning implementation work in a design. Covers deployment coupling, parallel track identification, task consolidation, and the task table format. Do not use for ticket creation (see /forge:start-task). |
Task Breakdown Pattern
Standard approach for breaking work into independently
reviewable, shippable, and parallelizable tasks.
Deployment Coupling Analysis
For each affected component, determine:
| Factor | Question |
|---|
| Release cadence | How often does this ship? |
| Integration points | What boundaries are crossed? |
| Shared state | API contracts, shared types? |
Shipping order based on coupling:
- Data layer changes first
- Backend/service APIs before consumer consumption
- Feature flags for incomplete user-facing work
Parallel Track Identification
Analyze work to find parallelizable streams:
| Dependency Type | Parallelization |
|---|
| Different components, no shared contracts | Fully parallel |
| Same component, independent modules | Parallel with coordination |
| Shared API contract | Producer first, then consumer |
| Shared data | Sequential (ordering matters) |
Output format:
- Track A: Backend service implementation
- Track B: CLI/UI consumer (behind flag)
- Track C: Test infrastructure
- Sync point: Integration tests validate all tracks
Shippable Increments
Each task should be:
| Criterion | Meaning |
|---|
| Independently mergeable | Doesn't break main |
| Small PRs | Target 200-400 lines for easier review |
| Complete | Has tests, passes CI |
| Flagged if needed | Incomplete user-facing work behind flag |
| Testable | Can be meaningfully verified on its own |
Prefer S/M tasks; break L tasks into smaller pieces.
Task Consolidation
Consolidate S-sized tasks within the same component.
Multiple trivial tasks (S-sized, ~20 lines each) to the
same component should be grouped into a single ticket/PR.
The overhead of reviewing and managing multiple tiny PRs
exceeds the benefit of granular separation.
| Scenario | Approach |
|---|
| 3 S-sized tasks, same component | Consolidate into 1 ticket |
| 2 S-sized + 1 M-sized, same component | Consider consolidating |
| S-sized tasks, different components | Keep separate |
| M or L-sized tasks | Keep separate for focused review |
Example anti-pattern:
T1: Update landing page banner (S)
T2: Remove sign-up button (S)
T3: Update install instructions (S)
Three separate tickets for trivially small changes to the
same component creates unnecessary overhead.
Better approach:
T1: Update pages for open access (M)
- Update landing page banner
- Remove sign-up button
- Update install instructions
One focused ticket covering all related changes.
When to keep tasks separate despite small size:
- Different logical concerns
- Different reviewers needed
- Need to ship one before another for sequencing
Testability Principle
Don't break tasks into pieces that can't be independently
tested.
The test for "should I split this?" is: can each piece be
meaningfully verified on its own?
If splitting creates work that can only be tested by
completing the next task, keep them together.
Example anti-pattern (UI):
- T1: Create dialog component
- T2: Add button that opens dialog (depends on T1)
Problem: A dialog component that isn't shown anywhere is
untestable. The real test is visual verification in the
browser — you can't see it unless it's integrated.
Better approach:
- T1: Create dialog + button integration (testable end-to-end)
Exceptions to keeping tasks together:
- Refactors and preparatory work that enable future tasks
- Infrastructure changes with their own test criteria
- Backend changes where unit tests provide sufficient coverage
Task Table Format
| Task | Type | Component | Size | Track | Depends On | Ticket |
|------|------|-----------|------|-------|------------|--------|
| ... | Prep/Feature | ... | S/M/L | A/B/C | ... | TBD |
Type Values
| Type | Purpose |
|---|
| Prep | Preparatory work (refactor, cleanup) — do first |
| Feature | Core feature implementation |
Size Values
| Size | Approximate |
|---|
| S | ~20-50 lines |
| M | ~100-300 lines |
| L | ~400+ lines (consider splitting) |
Complexity Thresholds
Watch for these warning signs:
| Threshold | Warning |
|---|
| > 10 tasks | Consider splitting into multiple slices |
| > 3 L-sized tasks | High complexity warning |
| > 4 affected components | Cross-cutting complexity |
If thresholds exceeded, consider whether scope should be
reduced.
Ordering
- Prep tasks first (create clean foundation)
- Feature tasks by dependency order
- Group prep tasks at top for visibility