| name | reality-check |
| description | High-level reality check when the swarm feels busy but directionally off. Use when lots of code is landing but the real goal still feels far away. |
/reality-check โ are we actually getting there?
Strategic drift: busy agents, growing commit count, feature still
feels far. This prompt breaks the spell of local productivity.
Prompt
Use the verbatim prompt at .flywheel/prompts/reality-check.md.
What to do with the answer
| Answer | Action |
|---|
| "Yes, completing all open beads closes the gap." | Keep going. This was a false alarm. |
| "Close, but these specific things are missingโฆ" | Revise existing beads or add new ones for each gap. Polish, resume. |
| "No, we'd still be far." โ structural issue | Stop the swarm. Back to /plan or /plan-synthesize. |
| "Yes but the plan itself targets the wrong outcome." | Stop. Revisit intent in plan space. |
How often
At natural milestones (epic closed, ~25% of beads done, ~50% done),
and any time you feel the urge to ask "wait, are we actually
shipping what we set out to?"
Busy agents are not the goal. A bead graph that converges on the
real outcome is the goal.