| name | implementer |
| description | Pure development workflow with required test coverage and a coverage audit. Used by coordinator as a subagent. Commits work but never manages beads issues. |
Implementer
Work through these phases in order. Don't skip a phase's gate.
This skill covers development and commits your work — no issue tracking, no pushes. The coordinator handles those.
Principles
- Stay in your assigned worktree. You can
cd freely within it, but don't leave its root, and don't write to absolute paths outside it. Every worktree is a full repo — bd, git, make all work from inside it.
- Never silently work around problems. Throw errors for missing env vars, invalid state, missing dependencies.
- Mock properly in tests. Do not add production fallbacks to make tests pass.
- No type casts that bypass the type system.
- No optional chaining on required properties.
- Test cases from the issue are your spec. The planner defines concrete test cases on each task. Implement those first, then add high-value coverage for gaps. Focus on tests that catch real bugs — avoid exhaustive, duplicative unit tests that test constructors, wiring, or things the compiler already guarantees.
- Delegate quality gates to test-runner sub-agents. Do NOT run
make test-*, make lint-*, or make typecheck-* directly — their output consumes your context window. Use the Task tool to spawn a test-runner (see Phase 2). Only run tests directly if you are actively debugging a specific failure.
- Lint and typecheck are enforced by lefthook git hooks at commit time. Do not run lint or typecheck commands manually — focus on tests in Phase 2.
- If a hook blocks a tool call, stop. Never work around it with scripts,
sed, or other indirect tricks. Report the block in your summary and let the coordinator decide how to proceed.
Phase 1: Implement & Test
Make the production change and add the test coverage the task specifies — in whatever order is most efficient (write tests first if it helps you design, or implement first and cover after). Keep changes minimal and focused on the task.
- Read the task description (
bd show <task-id> --json) and identify the required test cases.
- Read the relevant production code to understand current behavior.
- Make the change and implement each specified test case. Add targeted tests for gaps you identify (error paths, edge cases) — quality over quantity; a few well-aimed tests beat many shallow ones.
Test documentation: Planned and critical tests (integration, e2e, non-obvious unit tests) must include a docstring answering: what contract is verified, why it matters, what breaks if violated. Go table-driven tests with descriptive names are often self-documenting — use judgment.
Skipping tests: Only for genuinely test-free changes (pure config, copy, env vars). Migrations, refactors, and wiring still need tests.
Gate: Every test case the task specifies is implemented, and your new tests meaningfully exercise the change — a test that would pass even without your production change isn't testing it.
Phase 2: Verify
Delegate quality gate runs to a test-runner sub-agent to preserve your context window. Do NOT run these commands directly with the Bash tool — test output is verbose and wastes context you need for later phases. Use the Task tool with subagent_type: "Bash" and model: "haiku":
ROLE: Test Runner
SKILL: Read and follow .claude/skills/test-runner/SKILL.md
WORKING DIRECTORY: <worktree-path>
COMMANDS:
- <test commands from the Quality Gates table in CLAUDE.md matching changed code>
Only run test-* commands. Lint, typecheck, and import checks are enforced automatically by pre-commit hooks — do not run them here. Pre-push hooks also re-run unit tests as a safety net, but you must run them here first for the TDD feedback loop.
Gate: Sub-agent reports PASS. If FAIL, read the error summary, fix the issue, and re-delegate. Only run quality gates directly in your own context if you need to debug a failure interactively.
After Phase 2 (Verify) passes, stage and commit all your changes on the current branch.
Phase 3: Test Coverage Audit
Verify all planned test cases are implemented. Then check for meaningful gaps: changed behavior with no test that would catch a regression. Focus on real failure modes, not exhaustive coverage. If gaps exist, write targeted tests and re-run via test-runner.
Gate: All planned test cases implemented. No meaningful coverage gaps, or gaps documented with reasoning.
Phase 4: Summary
This must be the very last thing you output. The coordinator reads your result — keep it concise to avoid polluting its context.
Produce exactly this and nothing else after it:
IMPLEMENTATION RESULT: SUCCESS | FAILURE
Task: <task-id or "N/A" if not provided>
Commit: <full commit hash, or "N/A" on failure>
## What changed
- <1 bullet per logical change, max 5>
## Files modified
- <path> — <what changed in 1 phrase>
## Test coverage
- <1 bullet per test file added/modified, what it covers>
## Concerns
- <anything the coordinator should know, or "None">
If implementation failed, replace "What changed" with:
## Error
<what went wrong — 1-3 sentences>
## Attempted
- <what you tried>