| name | dafman-63-119 |
| description | Knowledge base from DAFMAN 63-119 (15 April 2021), Mission-Oriented Test Readiness Certification. Use for continuous MOTRC replacing single-point OTRR thinking: framework/applicability, Certification Official vs PM roles, review cycle and exit criteria, certification memo/decertify gates, DT&E/contractor evidence, ITT integration and cyber resiliency, and the 31-template matrix. DAF T&E readiness process only—does not replace DoDI 5000.89, AFI 99-103, or multi-service lead policies. |
DAFMAN 63-119 — Mission-Oriented Test Readiness Certification
Source: DAFMAN 63-119, 15 April 2021 (US Government work, public domain; no releasability restrictions) | Chapters: 7
When to use
Use this pack when planning or running Mission-Oriented Test Readiness Certification for DAF (USAF/USSF) programs—standing up the continuous process that replaced OTRR-centric thinking, assigning the Certification Official, driving template-based reviews, writing the certification memorandum, treating DT/contractor/integrated-test evidence, and folding cyber resiliency and industry/supplier test obligations into OT readiness.
Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime. Pair with dote-te-guidebook / dod-te-guidebook for enterprise T&E context and DoDI 5000.89 framing.
How to Use This Skill
- Without arguments — load the core frameworks below.
- With a topic — ask about MOTRC vs OTRR, Certification Official rules, review cycles, memos, DT sufficiency, contractor testing, ITT integration, cyber, or templates.
- With a chapter — ask for
ch01 through ch07.
Supporting files: glossary.md, patterns.md, cheatsheet.md.
Core Frameworks & Mental Models
Continuous MOTRC (not a single OTRR)
DAF replaced OTRR-as-the-main-event with a continuous mission-oriented certification process from early development through dedicated OT, backed by 31 templates (Attachments 2–32) and mandatory through testing to operational acceptance.
Certification Official independence
| Program type | Typical Certification Official | PM may self-certify? |
|---|
| ACAT I MDAP | SAF/AQ (MDA) or delegated PEO | No |
| ACAT II / OSD oversight | PEO (as assigned) | No |
| Others | As designated in TEMP/strategy | Follow designation; still separate judgment |
Review cycle loop
Pre-cert reviews → candid assessment vs exit criteria → negotiate workarounds/limits → report (DT report + executive brief) → memo → OTO acknowledge → (optional) decertify/recertify.
Evidence triangle
- DT & contractor test sufficiency and representativeness
- Integrated test data with argued OT credit
- OT plan entrance/exit criteria and resources
Template matrix (three groups)
- Planning & documentation (strategy, requirements, TEMP, ITT, …)
- Design & performance (cyber, CT, DT, software, CM, deficiencies, OT plan, …)
- Assets & support (training, SE, spares, agreements, PHS&T, personnel, tech data, T&E resources)
Integration & supplier lens
ITT co-chairs (CDT/TM + OTO) orchestrate; contractor/supplier data rights and test support are certification inputs, not optional annexes.
Chapter Index
| # | Section | Key content |
|---|
| ch01 | MOTRC Framework and Applicability | Continuous process, scope, DT sufficiency & OT adequacy hooks |
| ch02 | Roles and Certification Official | SAF/AQ, AF/TE, PEO, PM, CDT, OTO, LDTO, ITT |
| ch03 | Continuous Process and Review Cycle | Tailoring, cyber thread, assessment, negotiation, reporting |
| ch04 | Certification Memo and Gates | Memo content, acknowledge, decertify/recertify |
| ch05 | DT&E and Contractor Testing | Sufficiency, CT oversight, articles, evidence |
| ch06 | Integration, ITT, and Cyber | ITT engine, TEMP/plans, cyber, supplier interfaces |
| ch07 | Templates, Documentation, Tracking | Matrix structure, OPRs, TEMP Part III, tool |
Topic Index
- ACAT / MDA / PEO certification authority → ch02, ch04
- AFOTEC / MAJCOM OTO / USSF OTO → ch02
- Agile / software pathway / DevSecOps test → ch01, ch03, ch04
- Certification memorandum → ch04
- Certification Official (vs former OT&E Certification Official) → ch02
- Contractor testing / supplier data → ch05, ch06, ch07
- Cyber resiliency / MBCRA / MRAP-C → ch03, ch06
- Decertification / recertification / pause → ch04
- Dedicated OT / FRP / deployment decision → ch01, ch04
- Deficiency resolution → ch03, ch05, ch07
- DT&E sufficiency (MS B / MS C) → ch01, ch05
- Exit criteria / get-well plans → ch03, ch04
- Integrated Test Team (ITT) → ch02, ch06
- Integrated testing / OT credit → ch01, ch03, ch05
- LDTO / CDT / Test Manager → ch02, ch05
- Lead operating command / requirements → ch02
- Multi-service lead rules → ch01, ch06
- OT adequacy / DOT&E → ch01, ch05
- OTRR replacement / continuous evaluation → ch01
- Production- / operational-representative articles → ch01, ch05
- Safety release → ch02, ch05
- TEMP Part III certification strategy → ch02, ch07
- Template matrix / Attachments 2–32 → ch03, ch07
- Tracking tool (AF/TE) → ch07
- Urgent / prototype / JCTD tailoring → ch01
Supporting Files
Scope & Limits
This pack covers DAFMAN 63-119, 15 April 2021 — Mission-Oriented Test Readiness Certification — as synthesized reference notes (103 pages per source title page / reader metadata). It does not cover: full text of DoDI 5000.89, AFI 99-103, AFMAN 63-144, or the detailed line-item content of every certification template attachment; service-specific classified/CUI procedures; or non-DAF lead-service certification manuals. Supersedes AFMAN 63-119, 26 April 2019. US Government public domain work; title-page releasability: no releasability restrictions. No source-material download link is published.