| description | Use when the user wants a plan stress-tested from a CEO/operator lens — strategy, scope, ROI, risk, and "is this the right thing to build?". Triggers: "review like a CEO", "pressure-test the plan", "is this worth doing", "what's the user-facing outcome", "what's the kill signal", "what's the metric that proves it worked", "is this the right thing to build at all". |
Plan — CEO Review
Stress-test a plan the way a CEO/operator would. This is not a code review, not a design review, not an engineering review. It's the "should we even be doing this?" lens.
When to run
- Before kicking off a non-trivial project.
- When the user has a plan and is second-guessing the strategy.
- When a pitch / proposal / roadmap needs to survive executive review.
- When you (the agent) are about to spend hours and want a sanity check first.
The 8 questions
Answer each. The output is the answers, not a yes/no.
1. What is the user-facing outcome?
Not "what does the code do." What does the user do that they couldn't do before, and what's the smallest expression of that?
If the answer is vague ("improve the experience"), push back. "User can paste a URL and get a sharable artifact in 5 seconds" is sharp; "better UX" is not.
2. Who is the user, and how many of them are there?
Pick one. If you pick two, you've picked zero — the plan will try to please both and fail both.
State the count. "Anyone" is a refusal to commit. "1,000 power users in the first 6 months" is a number you can argue with.
3. What is the smallest version that ships value?
Cut the plan in half. Then cut it in half again. The MVP that ships value is usually 25% of the proposed scope.
What would you cut from the plan today if forced? The cut list is more honest than the kept list.
4. What is the cost of doing nothing?
If the answer is "nothing" or "a small annoyance," the plan is probably not worth doing. CEOs prioritise what hurts if you don't do it.
State the cost in dollars, hours, or risk — not vibes.
5. What is the cost of doing it wrong?
"Wrong" can mean: wrong scope, wrong audience, wrong time, wrong tech. For each, what does it look like, and is it recoverable?
If "wrong" means a year of wasted engineering, the plan needs an exit ramp. Build the exit ramp into the plan from day one.
6. What is the asymmetric upside?
If this works, what changes? A 10x improvement on something the user does 5x a day is bigger than a 2x improvement on something they do once a month.
State the delta, not the absolute. "Saves 30 minutes per session, used 4x a week by 1,000 users" beats "fast."
7. What is the metric that proves it worked?
If you can't name a metric, you can't tell if it worked. If you can name a metric but not a threshold, you can't tell if it worked enough.
Pick one. "7-day retention at 30% by month 3" is a number a CEO will hold you to. "Users will like it more" is not.
8. What would make you kill this in 6 months?
Every project has a kill signal. If you can't name one, the project will live forever in 80% done.
State: "If by [date] we don't see [metric threshold], we shut it down." That's the line that protects the rest of the roadmap.
Output format
PLAN: <name>
OUTCOME: <1 sentence, user-facing>
USER: <who, how many, how often>
MVP: <smallest valuable version>
COST OF 0: <what happens if we don't>
COST OF WRONG: <what "wrong" looks like + how to exit>
UPSIDE: <the asymmetric win>
METRIC: <number, threshold, date>
KILL: <the line that triggers shutdown>
VERDICT: <ship / cut / re-scope / kill>
The verdict is one of those four. No "ship with caveats."