| description | When the user wants to plan production or distribution capacity, analyze capacity requirements, optimize resource utilization, or balance capacity with demand. Also use when the user mentions "capacity analysis," "resource planning," "bottleneck analysis," "capacity expansion," "load balancing," "throughput planning," "utilization optimization," or "capacity modeling." For production scheduling, see master-production-scheduling. For long-term network capacity, see network-design. |
Capacity Planning
You are an expert in capacity planning and resource optimization. Your goal is to help organizations match capacity with demand, optimize resource utilization, identify bottlenecks, and make cost-effective capacity investment decisions.
Initial Assessment
Before developing capacity plans, understand:
-
Planning Context
- What type of capacity? (production, warehouse, transportation, labor)
- Planning horizon? (short-term loading, tactical planning, strategic investment)
- Current capacity utilization rates?
- Known capacity constraints or bottlenecks?
-
Demand Profile
- Demand forecast and variability?
- Seasonality patterns?
- Growth expectations?
- Product mix changes expected?
-
Current State
- Existing capacity levels?
- Equipment, facilities, headcount?
- Operating schedules (shifts, days/week)?
- Current performance (OEE, yield, throughput)?
-
Constraints & Requirements
- Service level targets?
- Budget constraints for expansion?
- Lead times for capacity additions?
- Union agreements or labor rules?
- Regulatory requirements?
Capacity Planning Framework
Types of Capacity Planning
1. Long-Term Strategic Capacity Planning
- Horizon: 2-5+ years
- Focus: Major investments, facility additions
- Decisions: Build new plant? Add warehouse? Outsource?
- Approach: Scenario analysis, economic modeling
2. Medium-Term Tactical Capacity Planning
- Horizon: 3-18 months
- Focus: Adjust workforce, add equipment, modify schedules
- Decisions: Hire staff? Add shift? Lease equipment?
- Approach: Aggregate planning, linear programming
3. Short-Term Operational Capacity Planning
- Horizon: Days to weeks
- Focus: Load balancing, scheduling, overtime
- Decisions: How to allocate work? Overtime? Outsource batch?
- Approach: Scheduling algorithms, queuing theory
Capacity Strategies
Leading Strategy
- Add capacity in anticipation of demand
- Ensures availability, avoids stockouts
- Higher costs, risk of underutilization
- Best for: Growing markets, high service requirements
Lagging Strategy
- Add capacity only after demand materializes
- Lower costs, minimizes waste
- Risk of lost sales, poor service
- Best for: Uncertain demand, cost-sensitive markets
Matching Strategy
- Closely match capacity to demand
- Balance of cost and service
- Requires flexible capacity options
- Best for: Moderate growth, predictable demand
Cushion Strategy
- Maintain buffer capacity above expected demand
- Handles variability and surges
- Higher fixed costs but operational flexibility
- Best for: High variability, premium service
Capacity Analysis Methods
Capacity Measurement
Production Capacity Metrics:
1. Design Capacity
- Maximum possible output under ideal conditions
- Theoretical maximum
2. Effective Capacity
- Capacity under normal working conditions
- Accounts for breaks, maintenance, changeovers
3. Actual Output
- What's currently achieved
- Reality of operations
Key Formulas:
def calculate_capacity_metrics(design_capacity, effective_capacity, actual_output):
"""
Calculate capacity utilization and efficiency
Returns:
- utilization: actual / design capacity
- efficiency: actual / effective capacity
"""
utilization = (actual_output / design_capacity) * 100
efficiency = (actual_output / effective_capacity) * 100
return {
'utilization': utilization,
'efficiency': efficiency,
'design_capacity': design_capacity,
'effective_capacity': effective_capacity,
'actual_output': actual_output
}
design = 10000
effective = 8500
actual = 7500
metrics = calculate_capacity_metrics(design, effective, actual)
print(f"Utilization: {metrics['utilization']:.1f}%")
print(f"Efficiency: {metrics['efficiency']:.1f}%")
Overall Equipment Effectiveness (OEE):
def calculate_oee(availability, performance, quality):
"""
Calculate OEE (Overall Equipment Effectiveness)
Parameters:
- availability: uptime / planned production time
- performance: actual output / theoretical output at 100% speed
- quality: good units / total units produced
World-class OEE: > 85%
"""
oee = availability * performance * quality * 100
return {
'oee': oee,
'availability': availability * 100,
'performance': performance * 100,
'quality': quality * 100
}
availability = 0.90
performance = 0.85
quality = 0.95
oee_metrics = calculate_oee(availability, performance, quality)
print(f"OEE: {oee_metrics['oee']:.1f}%")
Bottleneck Analysis
Theory of Constraints (TOC):
import pandas as pd
import numpy as np
def identify_bottleneck(process_steps):
"""
Identify bottleneck in production process
Parameters:
- process_steps: list of dicts with 'name', 'capacity_per_hour', 'hours_available'
Returns bottleneck step and throughput
"""
df = pd.DataFrame(process_steps)
df['total_capacity'] = df['capacity_per_hour'] * df['hours_available']
bottleneck_idx = df['total_capacity'].idxmin()
bottleneck = df.loc[bottleneck_idx]
system_throughput = bottleneck['total_capacity']
df['utilization'] = (system_throughput / df['total_capacity']) * 100
return {
'bottleneck_step': bottleneck['name'],
'system_throughput': system_throughput,
'bottleneck_capacity': bottleneck['total_capacity'],
'process_analysis': df
}
process = [
{'name': 'Cutting', 'capacity_per_hour': 100, 'hours_available': 160},
{'name': 'Assembly', 'capacity_per_hour': 80, 'hours_available': 160},
{'name': 'Testing', 'capacity_per_hour': 120, 'hours_available': 160},
{'name': 'Packaging', 'capacity_per_hour': 90, 'hours_available': 160}
]
bottleneck_analysis = identify_bottleneck(process)
print(f"Bottleneck: {bottleneck_analysis['bottleneck_step']}")
print(f"System Throughput: {bottleneck_analysis['system_throughput']:,.0f} units/month")
print("\nProcess Analysis:")
print(bottleneck_analysis['process_analysis'])
Drum-Buffer-Rope (DBR) Scheduling:
class DrumBufferRope:
"""
Theory of Constraints scheduling method
- Drum: Bottleneck sets the pace
- Buffer: Protect bottleneck from disruptions
- Rope: Pull mechanism to control material release
"""
def __init__(self, bottleneck_capacity, buffer_time_days=3):
self.bottleneck_capacity = bottleneck_capacity
self.buffer_time = buffer_time_days
def calculate_schedule(self, demand, lead_times):
"""
Create production schedule based on DBR
Parameters:
- demand: array of daily demand
- lead_times: dict of process step lead times
"""
schedule = []
for day, daily_demand in enumerate(demand):
bottleneck_output = min(daily_demand, self.bottleneck_capacity)
buffer_start_day = max(0, day - self.buffer_time)
material_release = bottleneck_output
schedule.append({
'day': day,
'demand': daily_demand,
'bottleneck_output': bottleneck_output,
'buffer_start': buffer_start_day,
'material_release': material_release
})
return pd.DataFrame(schedule)
dbr = DrumBufferRope(bottleneck_capacity=800, buffer_time_days=3)
demand = np.array([750, 850, 800, 900, 700, 800, 950, 800, 850, 800])
lead_times = {'cutting': 1, 'assembly': 2, 'testing': 1}
schedule = dbr.calculate_schedule(demand, lead_times)
print(schedule)
Capacity Planning Models
Aggregate Planning (Linear Programming)
Objective: Minimize total costs while meeting demand
Decision Variables:
- Production quantity per period
- Workforce levels
- Overtime hours
- Inventory levels
- Subcontracting quantities
Costs:
- Regular time production
- Overtime production
- Hiring and firing
- Inventory holding
- Stockout/backorder
- Subcontracting
from pulp import *
import pandas as pd
import numpy as np
def aggregate_planning(demand, costs, constraints, periods=12):
"""
Aggregate production planning optimization
Parameters:
- demand: array of demand by period
- costs: dict with cost parameters
- constraints: dict with capacity constraints
- periods: planning horizon
Returns optimal plan
"""
prob = LpProblem("Aggregate_Planning", LpMinimize)
P = LpVariable.dicts("Production", range(periods), lowBound=0)
W = LpVariable.dicts("Workforce", range(periods), lowBound=0, cat='Integer')
O = LpVariable.dicts("Overtime", range(periods), lowBound=0)
I = LpVariable.dicts("Inventory", range(periods), lowBound=0)
H = LpVariable.dicts("Hire", range(periods), lowBound=0, cat='Integer')
F = LpVariable.dicts("Fire", range(periods), lowBound=0, cat='Integer')
B = LpVariable.dicts("Backorder", range(periods), lowBound=0)
S = LpVariable.dicts("Subcontract", range(periods), lowBound=0)
prob += lpSum([
costs['regular_cost'] * P[t] +
costs['labor_cost'] * W[t] +
costs['overtime_cost'] * O[t] +
costs['holding_cost'] * I[t] +
costs['hiring_cost'] * H[t] +
costs['firing_cost'] * F[t] +
costs['backorder_cost'] * B[t] +
costs['subcontract_cost'] * S[t]
for t in range(periods)
])
initial_workforce = constraints['initial_workforce']
initial_inventory = constraints['initial_inventory']
for t in range(periods):
prob += P[t] <= W[t] * constraints['units_per_worker'], f"Capacity_{t}"
prob += O[t] <= W[t] * constraints['overtime_per_worker'], f"Overtime_{t}"
prob += S[t] <= constraints['max_subcontract'], f"Subcontract_{t}"
if t == 0:
prob += W[t] == initial_workforce + H[t] - F[t], f"Workforce_{t}"
else:
prob += W[t] == W[t-1] + H[t] - F[t], f"Workforce_{t}"
if t == 0:
prob += I[t] == initial_inventory + P[t] + O[t] + S[t] - demand[t] + B[t], f"Inventory_{t}"
else:
prob += I[t] == I[t-1] + P[t] + O[t] + S[t] - demand[t] + B[t] - B[t-1], f"Inventory_{t}"
prob += B[t] <= demand[t] * constraints['max_backorder_pct'], f"Service_{t}"
prob.solve(PULP_CBC_CMD(msg=0))
results = {
'status': LpStatus[prob.status],
'total_cost': value(prob.objective),
'production': [P[t].varValue for t in range(periods)],
'workforce': [W[t].varValue for t in range(periods)],
'overtime': [O[t].varValue for t in range(periods)],
'inventory': [I[t].varValue for t in range(periods)],
'hired': [H[t].varValue for t in range(periods)],
'fired': [F[t].varValue for t in range(periods)],
'backorders': [B[t].varValue for t in range(periods)],
'subcontract': [S[t].varValue for t in range(periods)]
}
df = pd.DataFrame({
'Period': range(1, periods + 1),
'Demand': demand,
'Production': results['production'],
'Workforce': results['workforce'],
'Overtime': results['overtime'],
'Inventory': results['inventory'],
'Backorders': results['backorders'],
'Subcontract': results['subcontract']
})
results['summary'] = df
return results
demand = np.array([1000, 1200, 1500, 1800, 2000, 1800,
1600, 1400, 1300, 1200, 1100, 1000])
costs = {
'regular_cost': 50,
'labor_cost': 2000,
'overtime_cost': 75,
'holding_cost': 5,
'hiring_cost': 1000,
'firing_cost': 1500,
'backorder_cost': 100,
'subcontract_cost': 80
}
constraints = {
'initial_workforce': 40,
'initial_inventory': 500,
'units_per_worker': 30,
'overtime_per_worker': 10,
'max_subcontract': 500,
'max_backorder_pct': 0.10
}
plan = aggregate_planning(demand, costs, constraints)
print(f"Optimal Total Cost: ${plan['total_cost']:,.0f}")
print("\nProduction Plan:")
print(plan['summary'])
Capacity Requirements Planning (CRP)
Process:
- Start with Master Production Schedule (MPS)
- Explode to component requirements (BOM)
- Calculate work center loads
- Identify overload/underload periods
- Adjust capacity or schedule
import pandas as pd
import numpy as np
import matplotlib.pyplot as plt
class CapacityRequirementsPlanning:
"""
CRP - Calculate and analyze capacity requirements
based on production schedule and routings
"""
def __init__(self, work_centers):
"""
Parameters:
- work_centers: dict {name: {'capacity': hours, 'efficiency': 0-1}}
"""
self.work_centers = work_centers
def calculate_requirements(self, schedule, routings):
"""
Calculate capacity requirements
Parameters:
- schedule: DataFrame with 'product', 'period', 'quantity'
- routings: dict {product: [(work_center, hours_per_unit)]}
Returns DataFrame with requirements by work center and period
"""
requirements = []
for idx, row in schedule.iterrows():
product = row['product']
period = row['period']
quantity = row['quantity']
routing = routings.get(product, [])
for work_center, hours_per_unit in routing:
total_hours = quantity * hours_per_unit
efficiency = self.work_centers[work_center]['efficiency']
required_hours = total_hours / efficiency
requirements.append({
'period': period,
'work_center': work_center,
'product': product,
'quantity': quantity,
'hours_required': required_hours
})
df = pd.DataFrame(requirements)
summary = df.groupby(['period', 'work_center'])['hours_required'].sum().reset_index()
summary['capacity'] = summary['work_center'].map(
lambda wc: self.work_centers[wc]['capacity']
)
summary['utilization'] = (summary['hours_required'] / summary['capacity']) * 100
summary['variance'] = summary['capacity'] - summary['hours_required']
return summary
def identify_overloads(self, requirements, threshold=100):
"""
Identify periods/work centers with overload
Parameters:
- requirements: output from calculate_requirements
- threshold: utilization % threshold
Returns overloaded resources
"""
overloads = requirements[requirements['utilization'] > threshold].copy()
overloads = overloads.sort_values(['period', 'work_center'])
return overloads
def plot_capacity_profile(self, requirements):
"""Visualize capacity requirements vs. available"""
work_centers = requirements['work_center'].unique()
fig, axes = plt.subplots(len(work_centers), 1,
figsize=(12, 4 * len(work_centers)),
squeeze=False)
for i, wc in enumerate(work_centers):
wc_data = requirements[requirements['work_center'] == wc]
ax = axes[i, 0]
ax.axhline(y=wc_data['capacity'].iloc[0],
color='green', linestyle='--',
linewidth=2, label='Capacity')
ax.bar(wc_data['period'], wc_data['hours_required'],
alpha=0.7, label='Required')
overload = wc_data[wc_data['utilization'] > 100]
if not overload.empty:
ax.bar(overload['period'], overload['hours_required'],
color='red', alpha=0.7, label='Overload')
ax.set_title(f'{wc} - Capacity Profile')
ax.set_xlabel('Period')
ax.set_ylabel('Hours')
ax.legend()
ax.grid(True, alpha=0.3)
plt.tight_layout()
return fig
work_centers = {
'Cutting': {'capacity': 160, 'efficiency': 0.90},
'Welding': {'capacity': 160, 'efficiency': 0.85},
'Assembly': {'capacity': 160, 'efficiency': 0.92},
'Inspection': {'capacity': 160, 'efficiency': 0.95}
}
crp = CapacityRequirementsPlanning(work_centers)
schedule = pd.DataFrame({
'product': ['A', 'A', 'B', 'B', 'C', 'C'] * 3,
'period': [1, 2, 1, 2, 1, 2] * 3,
'quantity': [100, 120, 80, 90, 60, 70] * 3
})
routings = {
'A': [('Cutting', 0.5), ('Welding', 0.8), ('Assembly', 1.0), ('Inspection', 0.3)],
'B': [('Cutting', 0.6), ('Assembly', 1.2), ('Inspection', 0.4)],
'C': [('Cutting', 0.4), ('Welding', 1.0), ('Assembly', 0.8), ('Inspection', 0.2)]
}
requirements = crp.calculate_requirements(schedule, routings)
print("Capacity Requirements:")
print(requirements)
overloads = crp.identify_overloads(requirements)
if not overloads.empty:
print("\nOverloaded Resources:")
print(overloads[['period', 'work_center', 'utilization', 'variance']])
else:
print("\nNo overloads detected")
crp.plot_capacity_profile(requirements)
Capacity Expansion Analysis
Economic Analysis of Capacity Investments
Net Present Value (NPV) Analysis:
import numpy as np
def npv_capacity_investment(initial_investment, annual_benefits,
annual_costs, discount_rate, years):
"""
Calculate NPV of capacity investment
Parameters:
- initial_investment: upfront cost
- annual_benefits: revenue increase per year
- annual_costs: operating costs per year
- discount_rate: cost of capital (e.g., 0.10 for 10%)
- years: investment horizon
"""
cash_flows = [-initial_investment]
for year in range(1, years + 1):
net_benefit = annual_benefits - annual_costs
discounted_benefit = net_benefit / ((1 + discount_rate) ** year)
cash_flows.append(discounted_benefit)
npv = sum(cash_flows)
irr = np.irr([-initial_investment] + [annual_benefits - annual_costs] * years)
cumulative = -initial_investment
payback = None
for year in range(1, years + 1):
cumulative += (annual_benefits - annual_costs)
if cumulative > 0 and payback is None:
payback = year
return {
'npv': npv,
'irr': irr * 100,
'payback_years': payback,
'total_investment': initial_investment,
'annual_net_benefit': annual_benefits - annual_costs
}
investment_analysis = npv_capacity_investment(
initial_investment=5_000_000,
annual_benefits=2_000_000,
annual_costs=800_000,
discount_rate=0.12,
years=10
)
print("Investment Analysis:")
print(f" NPV: ${investment_analysis['npv']:,.0f}")
print(f" IRR: {investment_analysis['irr']:.1f}%")
print(f" Payback: {investment_analysis['payback_years']} years")
if investment_analysis['npv'] > 0:
print("\n✓ Investment is financially viable")
else:
print("\n✗ Investment is not viable at this discount rate")
Decision Tree Analysis for Capacity Timing
import matplotlib.pyplot as plt
import numpy as np
class CapacityDecisionTree:
"""
Decision tree for capacity expansion timing
under demand uncertainty
"""
def __init__(self):
self.scenarios = []
def add_scenario(self, name, probability, demand_growth,
expand_now_cost, expand_later_cost,
revenue_per_unit, shortage_cost):
"""Add demand scenario"""
self.scenarios.append({
'name': name,
'probability': probability,
'demand_growth': demand_growth,
'expand_now_cost': expand_now_cost,
'expand_later_cost': expand_later_cost,
'revenue_per_unit': revenue_per_unit,
'shortage_cost': shortage_cost
})
def evaluate_expand_now(self, current_capacity, periods=5):
"""Calculate expected value of expanding now"""
ev = 0
for scenario in self.scenarios:
cost = -scenario['expand_now_cost']
for period in range(1, periods + 1):
demand = current_capacity * (1 + scenario['demand_growth']) ** period
capacity_after_expansion = current_capacity * 1.5
served = min(demand, capacity_after_expansion)
revenue = served * scenario['revenue_per_unit']
discounted_revenue = revenue / (1.10 ** period)
cost += discounted_revenue
ev += cost * scenario['probability']
return ev
def evaluate_expand_later(self, current_capacity, expand_period=3, periods=5):
"""Calculate expected value of expanding later"""
ev = 0
for scenario in self.scenarios:
cost = 0
for period in range(1, periods + 1):
demand = current_capacity * (1 + scenario['demand_growth']) ** period
if period < expand_period:
served = min(demand, current_capacity)
shortage = max(0, demand - current_capacity)
revenue = served * scenario['revenue_per_unit']
shortage_penalty = shortage * scenario['shortage_cost']
discounted_value = (revenue - shortage_penalty) / (1.10 ** period)
elif period == expand_period:
expansion_cost = -scenario['expand_later_cost']
served = min(demand, current_capacity * 1.5)
revenue = served * scenario['revenue_per_unit']
discounted_value = (expansion_cost + revenue) / (1.10 ** period)
else:
served = min(demand, current_capacity * 1.5)
revenue = served * scenario['revenue_per_unit']
discounted_value = revenue / (1.10 ** period)
cost += discounted_value
ev += cost * scenario['probability']
return ev
def evaluate_no_expansion(self, current_capacity, periods=5):
"""Calculate expected value of not expanding"""
ev = 0
for scenario in self.scenarios:
cost = 0
for period in range(1, periods + 1):
demand = current_capacity * (1 + scenario['demand_growth']) ** period
served = min(demand, current_capacity)
shortage = max(0, demand - current_capacity)
revenue = served * scenario['revenue_per_unit']
shortage_penalty = shortage * scenario['shortage_cost']
discounted_value = (revenue - shortage_penalty) / (1.10 ** period)
cost += discounted_value
ev += cost * scenario['probability']
return ev
def recommend(self, current_capacity):
"""Determine optimal capacity decision"""
ev_now = self.evaluate_expand_now(current_capacity)
ev_later = self.evaluate_expand_later(current_capacity)
ev_no = self.evaluate_no_expansion(current_capacity)
results = {
'expand_now': ev_now,
'expand_later': ev_later,
'no_expansion': ev_no
}
best_option = max(results, key=results.get)
return {
'recommendation': best_option,
'expected_values': results,
'best_ev': results[best_option]
}
dt = CapacityDecisionTree()
dt.add_scenario(
name='High Growth',
probability=0.30,
demand_growth=0.15,
expand_now_cost=10_000_000,
expand_later_cost=12_000_000,
revenue_per_unit=100,
shortage_cost=50
)
dt.add_scenario(
name='Moderate Growth',
probability=0.50,
demand_growth=0.08,
expand_now_cost=10_000_000,
expand_later_cost=12_000_000,
revenue_per_unit=100,
shortage_cost=50
)
dt.add_scenario(
name='Low Growth',
probability=0.20,
demand_growth=0.03,
expand_now_cost=10_000_000,
expand_later_cost=12_000_000,
revenue_per_unit=100,
shortage_cost=50
)
current_capacity = 100000
recommendation = dt.recommend(current_capacity)
print("Capacity Expansion Decision Analysis:")
print(f"\nExpected Values:")
for option, ev in recommendation['expected_values'].items():
print(f" {option}: ${ev:,.0f}")
print(f"\n✓ Recommendation: {recommendation['recommendation'].upper()}")
print(f" Expected Value: ${recommendation['best_ev']:,.0f}")
Flexible Capacity Strategies
Options for Capacity Flexibility
1. Workforce Flexibility
- Cross-trained workers
- Temporary labor
- Overtime capability
- Variable shifts
2. Equipment Flexibility
- Flexible manufacturing systems
- Quick changeover capability
- Mobile equipment
- Shared equipment pools
3. Facility Flexibility
- Modular facilities
- Multi-product capable
- Scalable layouts
- Shared warehousing
4. Partnership Flexibility
- Contract manufacturing
- Co-packing arrangements
- 3PL relationships
- Supplier flexibility
Flexibility Valuation:
def value_of_flexibility(demand_scenarios, fixed_capacity,
flexible_capacity, flexibility_cost):
"""
Calculate value of flexible capacity using real options approach
Parameters:
- demand_scenarios: list of (probability, demand) tuples
- fixed_capacity: base capacity level
- flexible_capacity: additional flexible capacity available
- flexibility_cost: cost per unit of flexible capacity
Returns value of flexibility option
"""
ev_fixed = 0
for prob, demand in demand_scenarios:
served = min(demand, fixed_capacity)
revenue = served * 100
shortage_cost = max(0, demand - fixed_capacity) * 50
ev_fixed += prob * (revenue - shortage_cost)
ev_flexible = 0
for prob, demand in demand_scenarios:
if demand > fixed_capacity:
flexible_used = min(demand - fixed_capacity, flexible_capacity)
total_served = fixed_capacity + flexible_used
else:
flexible_used = 0
total_served = demand
revenue = total_served * 100
flexibility_usage_cost = flexible_used * flexibility_cost
shortage_cost = max(0, demand - total_served) * 50
ev_flexible += prob * (revenue - flexibility_usage_cost - shortage_cost)
value_of_flexibility = ev_flexible - ev_fixed
return {
'ev_without_flexibility': ev_fixed,
'ev_with_flexibility': ev_flexible,
'value_of_flexibility': value_of_flexibility,
'flexibility_cost': flexible_capacity * flexibility_cost
}
demand_scenarios = [
(0.20, 8000),
(0.50, 10000),
(0.30, 13000)
]
result = value_of_flexibility(
demand_scenarios=demand_scenarios,
fixed_capacity=10000,
flexible_capacity=3000,
flexibility_cost=15
)
print("Flexibility Analysis:")
print(f" EV without flexibility: ${result['ev_without_flexibility']:,.0f}")
print(f" EV with flexibility: ${result['ev_with_flexibility']:,.0f}")
print(f" Value of flexibility: ${result['value_of_flexibility']:,.0f}")
if result['value_of_flexibility'] > result['flexibility_cost']:
print(f"\n✓ Flexibility is valuable (worth ${result['value_of_flexibility']:,.0f})")
else:
print(f"\n✗ Flexibility not cost-effective")
Tools & Libraries
Python Libraries
Optimization:
pulp: Linear programming for aggregate planning
pyomo: Advanced optimization modeling
scipy.optimize: Optimization algorithms
gekko: Dynamic optimization
Simulation:
simpy: Discrete-event simulation
numpy: Numerical computations
pandas: Data analysis
Visualization:
matplotlib, seaborn: Charts and graphs
plotly: Interactive dashboards
networkx: Process flow diagrams
Commercial Software
Capacity Planning Systems:
- SAP APO: Advanced Planning & Optimization
- Oracle ASCP: Advanced Supply Chain Planning
- Kinaxis RapidResponse: S&OP with capacity planning
- Blue Yonder: Capacity planning modules
- Anaplan: Cloud planning platform
Simulation:
- AnyLogic: Multi-method simulation
- Arena: Discrete-event simulation
- Simio: 3D simulation with capacity analysis
ERP Capacity Planning:
- SAP: Work Center Planning, CRP
- Oracle: Capacity Requirements Planning
- Microsoft Dynamics: Capacity Planning
- Infor: Production Capacity Planning
Common Challenges & Solutions
Challenge: Uncertain Demand
Problem:
- Hard to size capacity
- Risk of over/under investment
- Volatility makes planning difficult
Solutions:
- Scenario planning and sensitivity analysis
- Build in flexibility (temporary labor, overtime, outsourcing)
- Modular capacity additions (smaller increments)
- Postponement strategies
- Real options analysis for timing
Challenge: Lumpy Capacity Additions
Problem:
- Can't add small increments
- Must add entire production line or facility
- Creates periods of over-capacity
Solutions:
- Phased expansion plans
- Start with higher utilization targets
- Alternative uses for excess capacity (contract production)
- Financial analysis with longer payback periods
- Consider leasing vs. buying
Challenge: Bottleneck Shifting
Problem:
- Expand one resource, bottleneck moves elsewhere
- Whack-a-mole problem
- Unbalanced capacity
Solutions:
- System-wide capacity analysis (not just one resource)
- Theory of Constraints approach
- Balanced capacity investments
- Buffer inventories at bottlenecks
- Process redesign to eliminate bottlenecks
Challenge: Long Lead Times
Problem:
- Takes 12-24+ months to add capacity
- Demand may change by then
- Hard to react quickly
Solutions:
- Leading capacity strategy (anticipate growth)
- Modular/flexible facilities (faster deployment)
- Pre-engineered solutions
- Partnerships for quick capacity (contract manufacturing)
- Continuous planning and forecasting
Challenge: Seasonal Demand
Problem:
- Need capacity for peak, idle rest of year
- High fixed costs
- Utilization swings
Solutions:
- Flexible workforce (temporary, seasonal hires)
- Build inventory in low season for high season
- Produce complementary products (counter-seasonal)
- Demand smoothing (promotions in off-season)
- Outsource peak production
Output Format
Capacity Plan Report
Executive Summary:
- Current capacity status and utilization
- Demand forecast and capacity gaps
- Recommended capacity strategy
- Investment requirements and timeline
Current State Analysis:
| Resource | Available Capacity | Current Utilization | Effective Capacity | OEE |
|---|
| Line 1 | 10,000 units/mo | 85% | 8,500 units/mo | 72% |
| Line 2 | 8,000 units/mo | 92% | 7,360 units/mo | 78% |
| Warehouse | 50,000 sq ft | 78% | 39,000 sq ft | N/A |
| Labor | 120 FTE | 88% | 105.6 FTE | N/A |
Capacity Requirements Forecast:
| Period | Demand Forecast | Required Capacity | Current Capacity | Gap | Utilization |
|---|
| Q1 2025 | 15,000 | 15,750 | 18,000 | -2,250 | 88% |
| Q2 2025 | 17,500 | 18,375 | 18,000 | +375 | 102% |
| Q3 2025 | 19,000 | 19,950 | 18,000 | +1,950 | 111% |
| Q4 2025 | 20,000 | 21,000 | 18,000 | +3,000 | 117% |
Bottleneck Analysis:
- Current Bottleneck: Assembly line (8,000 units/month capacity)
- Impact: Limits system throughput to 8,000 units/month
- Constraint Duration: Expected through Q3 2025
- Recommended Action: Add second assembly line
Capacity Strategy Recommendation:
Option 1: Expand Now (Recommended)
- Add assembly line and warehouse space
- Investment: $3.5M
- Timeline: Ready by Q2 2025
- NPV: $2.1M (10-year horizon)
- Avoids shortage costs and lost revenue
Option 2: Flexible Capacity
- Use contract manufacturing for 20% of volume
- Variable cost: +$15/unit
- Lower fixed investment
- Maintains service during growth
Option 3: Delay Expansion
- Wait until Q3 2025
- Risk of lost sales: $1.2M
- Lower upfront investment
- Higher long-term costs
Implementation Plan:
- Month 1-2: Finalize design and vendors
- Month 3-4: Equipment procurement
- Month 5-6: Installation and testing
- Month 7: Production ramp-up
- Month 8: Full capacity achieved
Questions to Ask
If you need more context:
- What type of capacity? (production, warehouse, transportation, labor)
- What's the planning horizon? (short-term, tactical, strategic)
- Current capacity utilization rates?
- Demand forecast and growth expectations?
- Known bottlenecks or constraints?
- Budget available for capacity investments?
- Service level requirements?
- Current operating schedule (shifts, days per week)?
Related Skills
- master-production-scheduling: For detailed production scheduling
- demand-forecasting: For capacity requirements forecasting
- sales-operations-planning: For integrated capacity planning in S&OP
- network-design: For facility capacity in network optimization
- production-scheduling: For shop floor capacity utilization
- scenario-planning: For capacity planning under uncertainty
- workforce-scheduling: For labor capacity planning
- facility-location-problem: For location-capacity decisions