Skip to main content

risk-register-and-assessment

Build a risk register (assets, threats, likelihood x impact scoring), drive control selection from risk rather than from a framework checklist, choose a treatment per risk (mitigate / accept / transfer / avoid), and track residual risk with a named owner — so every control traces to a risk and every top risk has a control.

Jump to install

Source facts

Repository
mcorbett51090/RavenClaude
Last source activity
June 8, 2026 at 16:30
Detected SKILL.md language
English
Stars
7
Forks
1

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.