Skip to main content

create-work-breakdown-structure

Create a Work Breakdown Structure (WBS) and WBS Dictionary from approved project charter deliverables. Produces hierarchical work package decomposition with WBS codes, effort estimates, dependency mapping, and critical path identification. Triggers on: "create WBS", "work breakdown structure", "decompose project scope", "define work packages", "WBS dictionary", "estimate project effort".

Jump to install

Source facts

Repository
merceralex397-collab/meta-skill-engineering
Last source activity
May 3, 2026 at 07:55
Detected SKILL.md language
English
Stars
2
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.