Skip to main content
Run any Skill in Manus
with one click
mgoodman60
GitHub creator profile

mgoodman60

Repository-level view of 70 collected skills across 2 GitHub repositories, including approximate occupation coverage.

skills collected
70
repositories
2
occupation fields
4
updated
2026-02-27
repository explorer

Repositories and representative skills

#001
foreman-os-plugin
57 skills10updated 2026-02-27
81% of creator
project-data
Software Developers

Use this skill when reading from or writing to the project intelligence data store. Manages a multi-file data store (project-config.json, plans-spatial.json, specs-quality.json, schedule.json, directory.json, individual log files, and daily-report-data.json). Handles storage, cross-referencing, versioning, validation, and smart retrieval of project intelligence, report history, RFI/submittal logs, procurement tracking, vendor database, and lookahead schedules.

2026-02-27
document-intelligence
Project Management Specialists

Comprehensive construction document intelligence extraction system. Use when processing ANY construction documents (plans, specs, schedules, contracts, geotech, safety, SWPPP, sub lists, RFIs, submittals) to extract field-actionable data for daily reports, project management, quality control, and procurement. Also generates the Project Intelligence Dashboard and construction schedules (door, hardware, fixture, finish, plumbing, equipment, room) from extracted data. Triggers: "process documents", "extract from plans", "read the specs", "analyze schedule", "set up project", "add documents", "show project intelligence", "project intel", "what data do we have", "door schedule", "hardware schedule", "finish schedule", "generate schedules", "room schedule", "equipment schedule", any mention of construction document processing or project intelligence building. This skill should be used EVERY TIME construction documents need to be processed - it extracts deep, comprehensive data including specific values, schedules,

2026-02-27
data-normalization
Software Developers

Project-agnostic data normalization patterns for the 28-file Project Brain. Defines 8 repeatable patterns (N1-N8) that fix common data quality issues: status standardization, counter reconciliation, cross-reference linking, field backfill, schema compliance, computed totals, date/format normalization, and deduplication. Safe to re-run (idempotent). Outputs a repair plan before executing.

2026-02-26
submittal-intelligence
Cost Estimators

Review and verify submittal compliance against project specifications. Trigger phrases include "review submittal", "check submittal", "submittal compliance", "does this meet spec", "compare to spec", "submittal review", "product data review", "shop drawing review".

2026-02-26
closeout-commissioning
Cost Estimators

Skill for tracking project closeout and building commissioning activities. Manages closeout checklists, commissioning workflows, warranty tracking, and substantial/final completion documentation. Integrates with punch-list and inspection systems.

2026-02-25
cobie-export
Construction & Building Inspectors

Generate Construction Operations Building Information Exchange (COBie) compliant spreadsheets from existing project intelligence data. Maps extracted data into the 18 standard COBie worksheet format for facility management handover. Critical for healthcare facilities where ongoing maintenance and asset management are regulatory requirements. Exports as multi-tab Excel workbook. Triggers: "COBie", "COBie export", "facility handover", "asset register", "O&M data", "building information exchange", "commissioning data", "facility management data", "asset data", "COBie spreadsheet", "handover data", "building handover".

2026-02-25
environmental-compliance
Environmental Engineers

Environmental compliance management for construction projects. Covers LEED v4.1 construction administration, SWPPP permit compliance and inspections, hazardous materials management (asbestos, lead, mold, contaminated soil), construction waste management and diversion tracking, dust and air quality control, noise ordinance compliance, silica exposure prevention, and environmental incident response. Beyond basic BMP installation (see field-reference/bmp-field-guide.md). Triggers: "environmental", "LEED", "SWPPP", "hazmat", "hazardous materials", "asbestos", "lead paint", "waste management", "dust control", "noise", "environmental compliance", "recycling", "diversion", "VOC", "silica", "EPD", "HPD", "spill", "contaminated soil", "mold", "air quality", "noise variance", "waste diversion", "C&D waste".

2026-02-25
risk-management
Project Management Specialists

Proactive risk identification, assessment, and mitigation management for construction projects. Maintain a living risk register, run 5x5 probability-impact assessments, allocate and track contingency drawdown, manage weather and force majeure contingencies, and generate risk reports with heat maps. Integrates with delay-tracker, last-planner, cost-tracking, safety-management, morning-brief, and change-order-tracker. Triggers: "risk", "risk register", "risk matrix", "risk assessment", "contingency", "mitigation", "force majeure", "weather risk", "risk review", "risk report".

2026-02-25
Showing top 8 of 57 collected skills in this repository.
#002
foremanos-platform
13 skills00updated 2026-02-07
19% of creator
Showing top 8 of 13 collected skills in this repository.
Showing 2 of 2 repositories
All repositories loaded