Skip to main content

ohos-req-proposal-to-sr

Use when every proposal associated with an OHOS IR has passed GATE A and a System Requirement baseline is needed before spec and design work begins. Triggers: 生成SR, proposal转SR, SR基线, 系统需求基线, GATE A通过, 05-proposal to SR. Do NOT use for IR generation (ohos-req-feature-to-ir), feature baseline (ohos-req-feature-baseline), or feasibility analysis (ohos-req-feasibility-analysis).

Jump to install

Source facts

Repository
openharmonyinsight/openharmony-skills
Last source activity
July 21, 2026 at 12:25
Detected SKILL.md language
Mixed languages
Stars
31
Forks
6

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.