| name | undp |
| description | Use when a consulting, grant, or project proposal follows UNDP or wider UN-system procurement and evaluation rules; use AfDB, World Bank, or PPDA skills when their framework controls. |
| metadata | {"portable":true,"compatible_with":["claude-code","codex"]} |
United Nations System Procurement Framework — Consulting Services and Grants
Acknowledgement: Shared by Peter Bamuhigire, techguypeter.com, +256 784 464178.
Use When
- Use this skill when the solicitation follows UNDP or wider UN-system procurement rules.
- Load it before drafting when you need form, scoring, threshold, or compliance guidance.
Do Not Use When
- The task only needs sector-domain framing without procurement mechanics.
- A different procurement framework clearly applies.
Required Inputs
| Artefact | Source/provider | Required? | Missing-input behaviour |
|---|
| The solicitation package, especially instructions, forms, and evaluation criteria. | Buyer solicitation, ToR, or approved brief | Required | Stop the affected claim, request or verify the input, and label the resulting gap. |
| Any known selection method and technical threshold. | Buyer, verified sector source, or discovery | Required | Stop the affected claim, request or verify the input, and label the resulting gap. |
| The target proposal sections that must comply with the framework. | Buyer, verified sector source, or discovery | Conditional | Stop the affected claim, request or verify the input, and label the resulting gap. |
Workflow
- Confirm that UNDP or UN-system procurement applies from explicit cues in the solicitation.
- Read this skill and the local references to understand forms, scoring, administrative compliance, and constraints.
- Map those requirements into the numbered proposal section skills before drafting.
- Draft to maximize technical quality without creating compliance risk.
- Check the final output against thresholds, form placement, and submission rules.
Stop condition: Stop when proposer identity, controlling framework, mandatory form, sector fit, current rule, or load-bearing evidence remains unresolved.
Recovery: Record the gap and owner, seek clarification or current evidence, and return only the separable proposal content that remains supportable.
Quality Standards
- Treat UN instructions as hard constraints, not optional style guidance.
- Keep terminology, form names, and evaluation assumptions aligned to the actual solicitation.
- Optimize for evaluator behavior where the framework supports it.
Anti-Patterns
- Do not rely on generic donor assumptions when the UN materials give exact instructions.
- Do not ignore administrative compliance gates, thresholds, or mandatory declarations.
- Do not mix UN assumptions with World Bank, AfDB, or PPDA rules.
- Treating a neighbouring sector or framework as interchangeable. Fix: identify the controlling rule and primary outcome.
- Adding terminology without changing a delivery choice. Fix: link each term to method, risk, output, or evaluation criterion.
- Presenting an unverified current rule or statistic as settled. Fix: cite and date the source or mark it not assessed.
- Ignoring a missing mandatory input. Fix: stop the affected claim and assign an evidence owner.
- Letting sector or identity framing contradict methodology, staffing, schedule, or price. Fix: reconcile all affected sections before release.
Outputs
| Artefact | Consumer | Acceptance condition |
|---|
| A UNDP- or UN-compliant drafting and scoring approach for the relevant proposal sections. | Proposal lead, section writer, and evaluator-readiness reviewer | Applied consistently, traceable to the selected source, and free of unsupported identity, framework, or sector claims. |
Evidence Produced
| Evidence | Consumer | Acceptance condition |
|---|
| Routing and source record | Proposal lead and reviewer | Selected identity, framework, sector, source, date, and material gaps are recorded. |
| Decision record | Section writer and delivery lead | Each material choice has rationale, owner, evidence, and a review or stop condition. |
| Conformance check | Release reviewer | Mandatory forms, identity rules, sector logic, and unresolved checks are explicitly assessed. |
Capability Contract
This skill may read supplied profiles, solicitations, ToRs, approved references, and proposal drafts and may prepare routing guidance or draft content within the authorised workspace. Review is read-only by default. It must not invent credentials, certify compliance, submit a bid, accept terms, publish, disclose confidential information, or change source records without explicit authority.
Degraded Mode
If the solicitation, profile, current procurement source, sector evidence, network, or reviewer is unavailable, provide the narrowest useful qualified routing or draft. Mark the missing check not assessed, omit unsupported credentials, thresholds, dates, or compliance claims, and identify the evidence owner. An unassessed requirement is never a pass.
Decision Rules
| Decision | Action | Failure/risk avoided |
|---|
| UN instrument type | Classify the opportunity as consulting procurement, grant, or other UN instrument before applying forms and scoring logic. | Wrong template, eligibility claim, or cost treatment |
| Conflicting solicitation and background guidance | Follow the solicitation while recording the conflict for formal clarification. | Non-responsive interpretation |
| Missing mandatory evidence | Stop the affected claim or form, record the owner and deadline, and continue only with independent supported content. | Fabricated evidence or silent omission |
| Submission, certification, or contractual commitment | Obtain explicit authority and preserve approval evidence before acting. | Unauthorised external commitment |
Worked Example
A solicitation requires un instrument type, but one controlling input is missing. The proposal team applies this rule: Classify the opportunity as consulting procurement, grant, or other UN instrument before applying forms and scoring logic. It records the gap and owner, withholds the affected assurance, and proceeds only with content that can be verified. This avoids wrong template, eligibility claim, or cost treatment.
References
- Local
references/ files for UN procurement variants, scoring logic, and programme-specific requirements.
- ../SKILL.md to combine framework and sector context.
This skill covers procurement across the entire UN system: UNDP, UNICEF, UNFCCC, UNEP, UN Women, FAO, WHO, UNIDO, ILO, and all other UN bodies. While each agency has its own procedures, they share common patterns in proposal structure, evaluation, and compliance requirements. Read this before writing any UN-funded proposal.
When to Read This Skill
- The ToR or Call for Proposals references any UN agency (UNDP, UNICEF, UNFCCC, UNEP, FAO, WHO, etc.)
- The assignment is funded through GEF Small Grants Programme (SGP)
- The RFP uses UN project document format or Annex-based templates
- The proposal is a grant application to a UN-managed fund
- The assignment is funded by a bilateral donor channelled through a UN agency (EU, DFID, SIDA, etc.)
- You need to understand how UN evaluators score differently from World Bank
- The RFP is a competitive consulting services procurement issued by a UN secretariat or agency
Key Difference from World Bank
| Dimension | World Bank | UN System |
|---|
| Standardisation | Single procurement framework, universal forms (TECH/FIN) | Multiple instruments varying by agency, programme, country office, and funding source |
| Primary instruments | Consulting services contracts (QCBS, QBS, etc.) | Grants to CSOs, project documents, consulting contracts, institutional contracts, RFPs for services |
| Two-envelope system | Mandatory — sealed technical and financial envelopes | Grants: single submission. Consulting RFPs: separate technical and financial files |
| Minimum technical score | Hard gate (typically 75/100) | Grants: administrative verification is the pass/fail gate. RFPs: varies by agency |
| Scoring scale | 0-4 per sub-criterion, weighted to 100 | Varies: 1000-point scales with tier bands, qualitative expert appraisal, NC/NSC committee review, or cumulative point scoring |
| Price competition | Formula: (Lowest Price / Your Price) x 100 x Weight | Grants: budget assessed for "economy and relevance". RFPs: varies by agency |
| Key personnel | Individual CVs scored per position (qualifications, adequacy, regional experience) | Grants: team evaluated as a whole. RFPs: individual CVs with standardised UN CV template |
| Eligible entities | Primarily consulting firms | CSOs, NGOs, CBOs, IPOs, community groups, academic institutions, consulting firms |
| Co-financing | Not typically required from bidders | Grants: strongly encouraged or required. RFPs: not applicable |
| Gender/inclusion | Cross-cutting but rarely a scored criterion | Often a standalone scored criterion with significant weight |
| Government endorsement | Not required from bidders | Required for NGO applicants to UN Trust Funds |
| IPR ownership | Varies by contract | Defaults to the UN body — secretariat/agency holds exclusive IPR on all work produced |
| Tax exemption | Client-side | UN is exempt from all taxes and VAT — all prices must be quoted exclusive of tax |
UN System Instrument Types
The UN system uses different procurement modalities depending on the agency, programme, and funding source. Each has its own templates, evaluation approach, and strategic requirements.
Modality 1: Competitive Grants (UNDP-Managed Re-Granting)
When used: UNDP acts as fund manager for a donor (EU, bilateral) and re-grants to CSOs through competitive calls.
Typical features:
- Open call to all eligible organisations
- Annex-based application package (proposal + budget + declarations)
- Scored evaluation by Local and/or Regional Selection Committee
- Single submission — no two-envelope system
- Budget is one scored criterion among several (typically 10%)
- Grant agreements (Low Value Grant Agreement or similar)
Evaluation approach: Numerical scoring against published criteria, typically on a 1000-point scale with three-tier bands (somewhat/mostly/fully correspond).
See: references/competitive-grants-guide.md
Modality 2: GEF Small Grants Programme (SGP)
When used: GEF-funded grants to CSOs and community-based organisations for environmental and sustainable development projects, administered by UNDP globally.
Typical features:
- Standard project proposal template (10-page limit)
- Reviewed by National Coordinator (NC) and National Steering Committee (NSC)
- Dual objectives required: environmental AND development/livelihood
- Co-financing strongly encouraged
- Mandatory indicators framework (global environmental + socio-economic)
- Projects generally capped at 2 years
Evaluation approach: Committee-based qualitative assessment by NC and NSC against alignment with SGP Country Programme Strategy, national priorities, and template quality.
See: references/gef-sgp-guide.md
Modality 3: UN Trust Fund Project Proposals
When used: Project proposals to UN Trust Funds administered through UNDP channels (Fund for Ageing, Voluntary Fund on Disability, Trust Fund for Family Activities, Youth Fund).
Typical features:
- Five-part project document pro forma
- Government concurrence mandatory for NGO applicants
- Seed money orientation (US$5,000-20,000) — fund supplements, not replaces
- Three-party signature required (Government, Executing Agent, UN)
- Prescribed budget line numbering system
- Completion evaluation mandatory
Evaluation approach: Qualitative appraisal by interdisciplinary team of UN specialists against fund mandate, national strategy alignment, and design logic.
See: references/un-trust-funds-guide.md
Modality 4: UN Consulting Services RFPs (UNICEF, UNFCCC, and Other Agencies)
When used: A UN agency issues a competitive RFP to procure consulting firms, IT service providers, or individual consultants for implementation, evaluation, system development, or advisory services.
Typical features:
- Annex-based RFP package (multiple annexes covering terms, requirements, templates)
- Technical and financial proposals submitted as separate files (not sealed envelopes, but distinct documents)
- Standardised technical proposal template provided by the agency (varies by agency)
- UN CV template for key personnel
- IPR defaults to the UN body — secretariat/agency holds exclusive rights on all work produced
- All prices quoted exclusive of taxes and VAT (UN exemption)
- Staged payments tied to deliverables (not time-based billing)
- Third-party reviews may be mandated (project management and technical quality)
Common technical proposal structure (synthesised from UNICEF and UNFCCC patterns):
| Section | Content | Maps to Skill |
|---|
| Value statement | Half-page statement on why the firm is most suitable | 01-cover-letter/ |
| General information | Organisation name, registration, contact details | 04-firm-profile/ |
| Organisational capability | Size, project management strength, financial stability, global networking | 04-firm-profile/ |
| Past and present experience | Relevant projects, collaborative efforts, regional experience | 05-relevant-experience/ |
| Specialised knowledge | Domain expertise relevant to the ToR | 03-understanding-of-assignment/ |
| Engagement model / approach | How the firm will organise and partner with the UN agency | 06-methodology/ |
| Management approach | Project management, risk management, progress reporting, change management | 06-methodology/ |
| Quality approach | Quality environment, certifications, formal methodologies | 06-methodology/ |
| Technical solution | Detailed technical response to requirements (varies by assignment) | 06-methodology/ |
| Key personnel and CVs | Team structure, supervisory relationships, individual CVs | 07-team-composition/ |
| Project plan and schedule | Milestones, deliverables, critical path, dependencies | 08-work-plan/ |
| Previous experience | Track record in analogous assignments | 05-relevant-experience/ |
| References | Minimum 3 at organisation level + 3 per CV | 05-relevant-experience/ |
Evaluation approach: Cumulative point scoring (technical + financial), with technical and financial proposals evaluated separately. Technical weight typically 60-70%, financial 30-40%.
See: references/un-consulting-rfp-guide.md
Modality 5: UNDP Direct Consulting Procurement
When used: UNDP procures consulting firms or individual consultants directly for implementation support, evaluations, assessments.
Typical features: Similar to World Bank but with UNDP-specific templates and procedures. Uses UNDP Procurement Manual (not World Bank SPDs). Individual consultant procurement uses a different process from firm procurement.
UN System-Wide Rules
These rules apply across all UN agencies and instruments:
| Rule | Implication |
|---|
| Tax exemption | All prices must exclude taxes and VAT. The UN is exempt. Including VAT signals unfamiliarity. |
| IPR ownership | All work product, data, and deliverables belong to the UN body. Proposals must not claim IP rights over outputs. |
| Adverse judgments disclosure | Mandatory disclosure of any adverse legal judgments or arbitration awards. Omission can disqualify. |
| UN sanctions | Firms/individuals on UN sanctions lists are ineligible. |
| Conflict of interest | Standard COI declarations required. Firms involved in preparing the ToR may be excluded. |
| Currency | Financial proposals in the currency specified in the RFP. Some calls specify local currency. |
| UN experience valued | Experience with UN organisations and major multilateral/bilateral programmes is explicitly "highly desirable" across agencies. Prioritise UN project references. |
Evaluation Criteria — Cross-Modality Patterns
Despite variation across agencies and instruments, UN evaluations consistently weight these areas:
Universal Scoring Areas
| Area | Typical Weight | What Evaluators Look For |
|---|
| Methodology and approach | 40-50% | Tailored strategy, clear activities, logical results chain, realistic implementation plan |
| Organisational experience | 20-30% | Years of relevant project management, number of analogous past projects, team qualifications |
| Gender and social inclusion | 5-15% | Standalone criterion in most calls. Must be woven throughout, not an afterthought |
| Sustainability | 5-10% | Post-project viability, institutional embedding, self-financing provisions |
| Budget economy | 5-10% | Realistic, efficient, justified costs. Administrative costs typically capped at 15-20% |
| Innovation | 5-10% | New approaches, methods, or delivery models. Catalytic potential. |
| Risk management | 3-5% | Identified risks with specific mitigations. Many applicants skip this — easy differentiator |
The Three-Tier Scoring Band (Competitive Grants)
UNDP competitive grants typically score on three-tier bands rather than the World Bank's 0-4 scale:
| Band | Label | Score Range | What It Means |
|---|
| Band 1 | Somewhat corresponds | 30-40% of max | Criterion addressed but insufficiently |
| Band 2 | Mostly corresponds | 60-75% of max | Criterion adequately addressed |
| Band 3 | Fully corresponds | 100% of max | Criterion comprehensively addressed |
Critical insight: There is no partial credit within bands. The jump from Band 1 to Band 2 is massive (often doubling the score). Write to clearly cross the Band 3 threshold on every criterion.
Scoring Strategy by Section
Methodology (40-50% — The Decisive Section)
Band 1 (Somewhat): Restates the call objectives. Generic activities. Could apply to any project.
Band 3 (Fully):
- Strategy and approach explicitly linked to the call's thematic priorities
- Activities logically produce the stated results — clear results chain
- Implementation plan with timeline, responsibilities, and milestones
- Risk register with specific mitigations (not generic "we will manage risks")
- Monitoring plan integrated into implementation
Gender and Social Inclusion (Standalone Criterion)
Band 1: "The project will ensure gender equality" — vague language, no specifics.
Band 3:
- Gender analysis informs the project design
- Specific activities targeting women, youth, persons with disabilities
- Sex-disaggregated indicators and targets
- Budget line items for gender-specific activities
- Results framework includes gender-specific outcomes
In GEF SGP: At least 30% of funded projects must be implemented by indigenous women and youth — proposals led by these groups have a structural advantage.
Organisational Experience
Low score: General description of the organisation. No specific project references.
High score:
- Named past projects with dates, values, and outcomes
- Years of experience quantified (5+ years scores maximum in most rubrics)
- Team members identified with contracts or CVs attached
- Partnership history documented (long-standing partnerships score higher)
- Previous engagement with the funding programme noted
Sustainability
Band 1: "The project results will be sustained after completion."
Band 3:
- Specific institutional arrangements for post-project continuation
- Exit strategy with handover milestones
- Self-financing provisions or alternative funding sources identified
- Capacity built in local institutions to maintain results
- Government commitment to continuation (letter or endorsement)
Budget
Band 1: Unrealistic costs, unexplained line items, administrative costs exceeding cap.
Band 3:
- Every line item justified and realistic
- Administrative costs well within the cap (typically 15-20%)
- Co-financing clearly documented (source, type, amount, committed vs. projected)
- Annual breakdown aligned with the work plan
- VAT excluded where UNDP exemption applies
Administrative Compliance — The Pass/Fail Gate
Unlike World Bank (where the minimum technical score is the survival line), UNDP grants use administrative verification as the hard gate. Failing administrative verification means instant disqualification — no amount of proposal quality can recover.
Common Disqualification Triggers
| Requirement | Risk |
|---|
| Incomplete documentation | Missing annexes, declarations, or registration certificates = disqualified |
| Incorrect entity type | Organisation not eligible under the call criteria = disqualified |
| Missing mandatory documents | Registration certificate, financial reports, tax compliance certificate = disqualified |
| Budget format errors | VAT included when UNDP is exempt, administrative costs exceeding cap = disqualified or scored down |
| Late submission | No grace period in most calls |
| Special eligibility documents | E.g., GEF SGP indigenous recognition document — missing = instant disqualification |
Rule: Complete the administrative checklist before investing time in proposal content. If any document cannot be obtained, the proposal may not be worth writing.
Co-Financing — A UNDP Differentiator
Unlike World Bank consulting procurements (where the client pays the consultant), UNDP grants expect the applicant to contribute resources:
| Type | Description | How to Present |
|---|
| Cash co-financing | Direct monetary contribution from the applicant or third parties | State source, amount, committed vs. projected |
| In-kind co-financing | Staff time, office space, equipment, volunteer labour | Quantify in monetary terms at market rates |
| Government contribution | Government inputs in cash or kind | Secure written commitment before submission |
| Third-party co-financing | Contributions from other donors or partners | Attach commitment letters where possible |
Strategic insight: Co-financing signals commitment and sustainability. A proposal requesting 100% funding from UNDP is weaker than one showing 30-50% co-financing. In UN Trust Funds, the explicit instruction is that funds provide "seed money" — proposals requesting full funding are disadvantaged.
Government Endorsement
For UN Trust Fund proposals and many UNDP country programme grants, NGO applicants must demonstrate government concurrence:
- Contact the relevant government ministry early in the proposal development process
- Obtain a letter of endorsement or no-objection
- The local UNDP office can advise on procedures and the appropriate government counterpart
- Without government concurrence, the proposal cannot be processed
This does not apply to all UNDP instruments — competitive CSO grants may not require it. Check the specific call requirements.
Page Limits and Formatting
UNDP grants often impose strict page limits (unlike World Bank, which typically does not):
| Instrument | Typical Limit |
|---|
| GEF SGP project proposal | 10 pages + 10 pages attachments |
| Competitive CSO grants | Varies by call — check the guidelines |
| UN Trust Fund proposals | No explicit limit, but seed-money scale implies conciseness |
Implication: Conciseness is essential. Use tables, bullet points, and structured formats. Every sentence must earn its place.
Proposal Template Mapping
Unlike World Bank's universal TECH/FIN forms, UN templates vary by agency and instrument. This table maps common UN proposal sections to the proposal section skills:
| UNDP Section | Content | Maps to Skill |
|---|
| Cover page / project summary | Project title, applicant, location, duration, budget | 01-cover-letter/ |
| Background and justification | Current situation, problem statement, national context | 03-understanding-of-assignment/ |
| Organisational profile / eligibility | Experience, team, governance, legal status | 04-firm-profile/ |
| Previous relevant experience | Past projects, outcomes, references | 05-relevant-experience/ |
| Methodology / approach / strategy | Technical approach, activities, results chain | 06-methodology/ |
| Team composition | Key personnel, qualifications, roles | 07-team-composition/ |
| Work plan / implementation plan | Timeline, milestones, responsibilities | 08-work-plan/ |
| Budget | Line-item budget, co-financing, annual breakdown | 10-financial-proposal/ |
| Sustainability and exit strategy | Post-project viability | sustainability-planning/ |
| Gender and social inclusion | GESI mainstreaming, sex-disaggregated indicators | gender-and-social-inclusion/ |
| Risk management and monitoring | Risk register, M&E plan | risk-management/, monitoring-and-evaluation/ |
| Innovation | New approaches, catalytic potential | Embedded in 06-methodology/ |
| Knowledge management | Lessons learned, dissemination plan | Embedded in 06-methodology/ |
Reference Library
| Reference File | Contents |
|---|
references/competitive-grants-guide.md | UNDP-managed competitive CSO grants: evaluation scoring (1000-point scale), sub-criteria breakdown, administrative requirements, partnership rules |
references/gef-sgp-guide.md | GEF Small Grants Programme: template structure, mandatory indicators, dual objectives, co-financing, eligibility, strategic priorities |
references/un-trust-funds-guide.md | UN Trust Fund project proposals: five-part pro forma, budget line numbering, government endorsement, appraisal criteria, seed-money strategy |
references/un-consulting-rfp-guide.md | UN consulting services RFPs (UNICEF/UNFCCC patterns): technical proposal structure, CV template, financial proposal rules, key personnel requirements, engagement model, IPR and data ownership, strategic signals for scoring |
Read the relevant reference file for detailed guidance beyond this summary.
Based on: UNDP/EU "Guidelines for Submitting Project Proposals for Civil Society Organizations" (January 2025), GEF Small Grants Programme "Project Proposal Template" (GEF-7 Operational Phase), United Nations "Guidelines for Preparing and Submitting Project Proposals" for UN Trust Funds, UNICEF "Format of Technical and Financial Proposal" (Annex E, 2021), and UNFCCC "Technical Proposal Template" (Annex 9, ITL RFP).