Requirements Analysis Skill
Use When
- classifying, reconciling, prioritising, and testing the feasibility of elicited requirements; use requirements-validation for the independent pre-baseline review.
- Use this procedure when the required source artefacts are available and
Analysed requirements set and conflict log is the next lifecycle deliverable.
Do Not Use When
- Use
requirements-validation when that neighbouring route owns the decision or deliverable.
- Do not invent missing project evidence, standards clauses, thresholds, or stakeholder decisions.
Required Inputs
| Artefact | Source or provider | Required? | Behaviour when missing |
|---|
| Elicitation evidence, goals, stakeholder priorities, business rules, and constraints | Elicitation outputs and project context | Yes | Stop the affected step, name the missing source, and return only a qualified gap record. |
Workflow
- Inspect the required inputs and log the exact sources, versions, and unresolved assumptions.
- Apply this skill's existing domain workflow and decision rules to produce
Analysed requirements set and conflict log.
- Stop when a required source, accountable decision owner, or deterministic test oracle is absent.
- Recover by preserving valid work, marking the blocked scope, and returning the narrowest qualified artefact plus the next evidence needed.
Outputs
| Artefact | Consumer | Acceptance condition |
|---|
| Analysed requirements set and conflict log | Specification, architecture, and validation owners | Required sections are populated, source links resolve, and every material requirement or decision has an observable review or test oracle. |
Evidence Produced
| Evidence | Reviewer | Acceptance condition |
|---|
Source, decision, trace, and validation record for Analysed requirements set and conflict log | Requirements quality reviewer | Inputs used, decisions made, checks run, failures, and unassessed items are explicit. |
Capability and permission boundaries
Read and search are required. This procedure is read-only by default. Editing the reviewed artefact, publishing, production mutation, destructive action, spending, or certification requires explicit authority.
Degraded mode
Fallback: if a required file, reviewer, standard source, network check, renderer, or execution capability is unavailable, return the narrowest useful qualified result and mark the affected check not assessed; never convert an unassessed check into a pass.
Decision Rules
| Choice or condition | Action | Failure or risk avoided |
|---|
| Two sources conflict on behaviour or priority | Record the conflict, evidence, owner, and decision deadline; do not choose silently. | Hidden contradictions entering the SRS. |
| Required inputs and test oracles are complete | Continue through the existing workflow and record evidence. | A deliverable whose acceptance cannot be reproduced. |
| A mandatory source or owner is missing | Stop the affected branch and issue a qualified gap record. | Fabricated context or unauthorised decisions. |
Quality Standards
- Preserve stable identifiers and bidirectional traceability from project evidence to
Analysed requirements set and conflict log and its acceptance checks.
- Apply ISO/IEEE measures only with a named metric, method, threshold, evidence source, and responsible reviewer; run the anti-slop gate before release.
Anti-Patterns
- Producing
Analysed requirements set and conflict log from assumed context. Fix: cite the project source or mark the scope blocked.
- Accepting a material requirement without a deterministic oracle. Fix: add a measurable result, boundary, and verification method.
- Crossing into
requirements-validation without routing the decision. Fix: hand off the named input and preserve trace links.
- Treating an unavailable check as passed. Fix: mark it
not assessed and state the release consequence.
- Claiming standards, statutory, or stakeholder approval without evidence. Fix: cite the source and reviewer or qualify the claim.
References
Overview
This skill transforms raw elicitation artifacts into a structured analysis report. It classifies requirements by type and priority, detects conflicts between competing requirements, assesses feasibility across five dimensions (TELOS), and applies a stakeholder-selected prioritization method. The output serves as the authoritative analysis baseline before specification and validation activities begin.
When to Use This Skill
- After elicitation activities have produced
elicitation_log.md with raw requirements
- When the requirements set has grown large enough that conflicts and redundancies are likely
- Before writing formal SRS specifications to ensure only feasible, conflict-free requirements proceed
- When stakeholders need a defensible prioritization of the requirements backlog
Quick Reference
| Attribute | Value |
|---|
| Inputs | projects/<ProjectName>/<phase>/<document>/elicitation_log.md, vision.md, features.md, business_rules.md |
| Output | projects/<ProjectName>/<phase>/<document>/requirements_analysis_report.md |
| Tone | Analytical, objective, evidence-based; no subjective adjectives |
| Standards | IEEE 29148-2018 Section 6.5, IEEE 830-1998, IEEE 1233-1998 |
Input Files
| File | Location | Required | Purpose |
|---|
| elicitation_log.md | projects/<ProjectName>/<phase>/<document>/elicitation_log.md | Yes | Raw requirements gathered from stakeholders |
| vision.md | projects/<ProjectName>/_context/vision.md | Yes | Business goals for traceability and prioritization |
| features.md | projects/<ProjectName>/_context/features.md | Yes | Feature descriptions for classification |
| business_rules.md | projects/<ProjectName>/_context/business_rules.md | No | Business rules for conflict detection |
Output Files
| File | Location | Description |
|---|
| requirements_analysis_report.md | projects/<ProjectName>/<phase>/<document>/requirements_analysis_report.md | Complete analysis with classification, conflicts, feasibility, and prioritization |
Core Instructions
Follow these steps in order. Halt and notify the user if a required input file is missing.
Step 1: Read and Inventory Context Files
Read elicitation_log.md, vision.md, features.md, and optionally business_rules.md from projects/<ProjectName>/_context/. Assign a temporary identifier (e.g., RAW-001) to each requirement that lacks one. Log the total count of raw requirements discovered.
Step 2: Classify Requirements
Classify each requirement along two axes:
By Type (IEEE 29148 Section 6.5.2):
| Type | Definition | Identifier Prefix |
|---|
| Functional | A capability the system shall provide (stimulus-response) | FR- |
| Non-Functional | A quality attribute or constraint the system shall satisfy | NFR- |
| Constraint | A design or implementation restriction imposed externally | CON- |
| Interface | A requirement on system boundaries and external interactions | IR- |
By Obligation (IEEE 1233):
| Level | Keyword | Meaning |
|---|
| Mandatory | shall | Non-negotiable; system fails acceptance without it |
| Desirable | should | Expected but negotiable under constraint pressure |
| Optional | may | Nice-to-have; included only if resources permit |
Produce a classification matrix table listing every requirement with its type, obligation level, and source reference.
Step 3: Detect Conflicts
Scan the classified requirements for four conflict types per Wiegers Practice 8:
- Contradiction: Two requirements specify mutually exclusive behaviors for the same stimulus. Flag both with
[CONFLICT-CONTRADICTION].
- Redundancy: Two requirements specify the same behavior in different words. Flag the duplicate with
[CONFLICT-REDUNDANCY].
- Subsumption: One requirement is a strict subset of another. Flag the subsumed requirement with
[CONFLICT-SUBSUMPTION].
- Boundary Conflict: Two requirements define overlapping numeric ranges or thresholds that cannot simultaneously be satisfied. Flag both with
[CONFLICT-BOUNDARY].
For each detected conflict, document:
- The conflicting requirement identifiers
- The conflict type
- A recommended resolution strategy (merge, escalate, defer, remove)
- The escalation path if stakeholder arbitration is required
See references/conflict-detection.md for the detection algorithm and resolution strategies.
Step 4: Assess Feasibility (TELOS Framework)
Evaluate every mandatory requirement against five feasibility dimensions:
| Dimension | Question | Score Range |
|---|
| Technical | Can the requirement be implemented with available technology? | 1-5 |
| Economic | Can the requirement be implemented within budget constraints? | 1-5 |
| Legal | Does the requirement comply with applicable regulations? | 1-5 |
| Operational | Can the organization support this requirement operationally? | 1-5 |
| Schedule | Can the requirement be delivered within the project timeline? | 1-5 |
Compute a composite feasibility score:
$FeasibilityScore = \frac{T + E + L + O + S}{5}$
Apply the following thresholds:
- Score >= 4.0: Go (proceed to specification)
- Score 2.5-3.9: Conditional (proceed with documented risks)
- Score < 2.5: No-Go (defer or remove; flag with
[FEASIBILITY-FAIL])
See references/feasibility-analysis.md for the scoring rubric and go/no-go decision criteria.
Step 5: Prioritize Requirements
Apply the prioritization method selected by the stakeholder team. If no method has been chosen, recommend one using the decision tree in references/requirements-prioritization.md.
Supported Methods:
-
MoSCoW (Wiegers Practice 9): Assign each requirement to Must Have, Should Have, Could Have, or Won't Have. Validate that Must Have requirements do not exceed 60% of total effort capacity.
-
Kano Model: Classify requirements as Basic (expected), Performance (linear satisfaction), or Excitement (delight). Ensure all Basic requirements are included before Performance requirements.
-
WSJF (Weighted Shortest Job First): Calculate priority score:
$WSJF = \frac{UserValue + TimeCriticality + RiskReduction}{JobSize}$
-
100-Dollar Method: Distribute 100 hypothetical dollars across requirements. Aggregate stakeholder allocations and rank by total investment.
Produce a prioritized requirements list sorted by priority score or category, with justification for each ranking decision.
Step 6: Goal Modeling (Optional)
If business goals in vision.md are complex or hierarchical, decompose them using goal-oriented requirements engineering:
- Build AND/OR goal decomposition trees linking business goals to functional requirements
- Identify goal conflicts where satisfying one goal impedes another
- Map agents (actors) to goals they are responsible for achieving
See references/goal-modeling.md for KAOS and i* modeling guidance.
Step 7: Generate Analysis Report
Write the completed analysis to projects/<ProjectName>/<phase>/<document>/requirements_analysis_report.md using the output format below. Log summary statistics: total requirements, classifications, conflicts detected, feasibility failures, and priority distribution.
Output Format Specification
The generated requirements_analysis_report.md SHALL contain the following sections:
# Requirements Analysis Report: [Project Name]
## 1. Document Information
## 2. Analysis Summary
### 2.1 Scope and Objectives
### 2.2 Input Artifacts Analyzed
### 2.3 Key Findings
## 3. Requirements Classification Matrix
### 3.1 By Type (Functional / Non-Functional / Constraint / Interface)
### 3.2 By Obligation (Mandatory / Desirable / Optional)
### 3.3 Classification Summary Statistics
## 4. Conflict Detection Report
### 4.1 Contradictions
### 4.2 Redundancies
### 4.3 Subsumptions
### 4.4 Boundary Conflicts
### 4.5 Resolution Recommendations
## 5. Feasibility Assessment
### 5.1 TELOS Scoring Matrix
### 5.2 Go / Conditional / No-Go Summary
### 5.3 Risk Register for Conditional Requirements
## 6. Requirements Prioritization
### 6.1 Method Selected and Rationale
### 6.2 Prioritized Requirements List
### 6.3 Priority Distribution Analysis
## 7. Goal Model (if applicable)
## 8. Recommendations and Next Steps
## 9. Appendix: Standards Traceability
Common Pitfalls
- Classifying implementation details as requirements: A requirement describes what the system shall do, not how it shall be built. Filter out design decisions during classification.
- Ignoring non-functional conflicts: Two NFRs can conflict (e.g., "response time < 100ms" vs. "encrypt all data at rest with AES-256"). Analyze NFR interactions explicitly.
- Feasibility scores without evidence: Every score SHALL include a one-sentence justification. A number without rationale is an opinion.
- MoSCoW inflation: Stakeholders tend to classify everything as "Must Have." Enforce the 60% capacity cap and challenge classifications with evidence.
- Skipping redundancy detection: Redundant requirements inflate effort estimates and create maintenance burden in the SRS.
Verification Checklist
Integration
| Direction | Skill | Relationship |
|---|
| Upstream | 02-requirements-engineering/fundamentals/during/03-* | Consumes elicitation artifacts |
| Downstream | 02-requirements-engineering/fundamentals/during/05-* | Feeds classified requirements to data modeling |
| Downstream | 02-requirements-engineering/fundamentals/during/06-* | Feeds prioritized requirements to patterns |
| Downstream | 02-requirements-engineering/waterfall/05-* | Feeds into SRS feature decomposition |
Standards Compliance
| Standard | Governs |
|---|
| IEEE 29148-2018 | Requirements analysis activities and classification scheme |
| IEEE 830-1998 | Quality attributes for well-formed requirements |
| IEEE 1233-1998 | Obligation levels and requirement well-formedness |
| Laplante Ch.5 | Analysis techniques and feasibility assessment |
| Wiegers Ch.7-9 | Classification, conflict detection, and prioritization |
Resources
references/conflict-detection.md -- Conflict types, detection algorithm, resolution strategies
references/feasibility-analysis.md -- TELOS framework with scoring rubric
references/requirements-prioritization.md -- Four prioritization methods compared
references/goal-modeling.md -- KAOS and i* goal-oriented requirements engineering