Skip to main content

reds10-drawing-qa

Run a structured, multi-phase Quality Assurance review on Reds10 drawings before issue or submission. Use this skill whenever Scott uploads drawings (as images or PDFs) or asks to check, validate, or review any drawing — including architectural, structural, MEP, module assembly, manufacturing, site layout, landscaping, acoustic, fire, or FFE drawings. Also trigger when Scott says things like "check these drawings", "are these ready to issue", "run QA on this drawing set", "review this against ISO 19650", or "is this title block right". Supports single or batch drawing review in one session. Auto-detects applicable phases based on drawing type. Pauses between phases for Scott's confirmation. Produces a RAG-rated report per drawing with a batch summary and exportable findings. Always use this skill for any drawing review — never do a shallow inline check when this skill is available.

Jump to install

Source facts

Repository
scottlairdr10/reds10-drawing-qa
Last source activity
April 23, 2026 at 07:14
Detected SKILL.md language
English
Stars
0
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.